Rahmat A. Sharafat

Project Manager at IWPCO, Iran Water & Power Resources Development Company
  • Claim this Profile
Contact Information
Location
IR

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Iran
    • Renewable Energy Power Generation
    • 100 - 200 Employee
    • Project Manager
      • Mar 2000 - Present

      Karkheh HPP (1996- 2004) Documentary Expert & Planning engineer Documentation of execution the Karkheh HPP including taking photos and films individually Managing the photographers and film makers companies to record the events of the project and making documentary movies. Project planning and preparing time schedule Preparing the periodical reports of the execution process of the Project Budget estimating and coordination for preparing the financial resources Coordination between other departments of the project Rudbar Loretan HPP (2003-2010) Planning Engineer Project planning and preparing time schedule Preparing the periodical reports of the execution process of the Project Budget estimating and coordination for preparing the financial resources Coordination between other departments of the project Supervisory of installation the instruments in the dam body and the related structures , reading and analyzing the data Rudbar Lorestan Pumped Storage HPP (2010-2020) Project Manager Managing and coordination to the following activities between the engineers and clients: • Feasibility study of the project • Review of the feasibility study project • Geotechnical & geophysical investigation and in situ tests • Study of the power grid power generation and condition • Reviewing the needed capacity of the grid to the pumped storage power plants • Detail design of the project and the effect of reducing the total installed capacity of the project • Preparing tender documents for the project, conducting the tender and selecting the contractors • Negotiation with the financers and made an agreement • Managing the construction of immediate structures of the project • Reviewing and optimization of the final design of the project Show less

    • Iran
    • Business Consulting and Services
    • 1 - 100 Employee
    • Technical Engineer
      • Nov 1996 - Apr 1999

      Preparation of proposal, method statement and cost estimating Providing to the clients with technical reports and documents Preparation of proposal, method statement and cost estimating Providing to the clients with technical reports and documents

    • Expert of borrow area
      • Sep 1995 - Aug 1996

      Exploring and extracting the clay and Gravel borrow area Preparing the GC (Gravel-Clay) material for the core of the dam Exploring and extracting the clay and Gravel borrow area Preparing the GC (Gravel-Clay) material for the core of the dam

Education

  • Islamic Azad University
    Master's degree, Geophysics and Seismology
    2005 - 2007
  • Shahrood University of Technology
    Bachelor's degree, Mining and Mineral Engineering
    1991 - 1995

Community

You need to have a working account to view this content. Click here to join now