Rahim Navaei
Project Manager: "4G Technology Activation in 2100 Band (B1) " at Mobile Telecommunication- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
LTE Certificate
Nokia -
LTE Certificate
Ericsson
Experience
-
Mobile Telecommunication
-
India
-
Telecommunications
-
1 - 100 Employee
-
Project Manager: "4G Technology Activation in 2100 Band (B1) "
-
Jan 2020 - Present
Activation of 4G technology as following:1-First solution (4G 2100) :Removing all UMTS 2100 carriers and the 4G is activated. 2.Second Solution (UMTS 2100+ 4G 2100): Removing one or two carries of UMTS 2100 and then 4G is activated with one carrier.The first solution is applicable for the cities that are not facing with the CS voice congestion.The second solution is applicable for the cities that are facing with the CS voice congestion.
-
-
Senior Telecom Expert
-
Sep 2000 - Present
-
-
Project Manager: "4G 2600 Band (B7) Second Carrier Activation"
-
Oct 2019 - Feb 2023
-
-
Project Manager: "4G/3G/2G Redesign, Tuning and Optimization of Main Roads "
-
Sep 2019 - Aug 2020
1.Analysing the Network KPIs1.Pre Drive Test in the main roads, for 4G/3G/2G technologies2.Analysing the DT logs by the tools3.Auditing the network parameters (4G/3G/2G technologies) including the redline parameters4.Review of network layering strategy among all carriers of 4G/3G/2G technologies For areas / roads where ping pong occurs between different layers and technologies5.Auditing the Antennas Tilt (M-Tilt and E-Tilt) and Antennas Height For areas that suffer from a lack of good coverage 6.Applying new network parameters including new redline parameters (Especially those related to RF output power and coverage)7.Applying New Mechanical E-Tilt and M-Tilt as short-Term8.Post Derive Test9.Analysing the Derive test logs and Network KPIs8.Height increase and tower change as Long-Term Show less
-
-
Project Manager: "4G/3G Carrier Aggregation and Addition"
-
Mar 2018 - Feb 2020
-
-
Technical Advisor: 5G and 4G
-
Aug 2013 - Jan 2020
-
-
Project Manager" " UMTS 2100 Band (B1) Carrier Addition"
-
Mar 2017 - Apr 2018
-
-
Executive Project Manager: "Network Redline Parameters, 4G/3G/2G technologies"
-
Jan 2015 - Jun 2016
-
-
Education
-
Iran University of Science and Technology
Bachelor of Science - BS, Telecommunications Engineering -
K. N. Toosi University of Technology
Master of Science - MS, Telecommunications Engineering