Rahim Askerov

Electrical Engineer at SOCAR Petrofac Caspian • SPC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Baku, Contiguous Azerbaijan, Azerbaijan, AZ
Languages
  • English Limited working proficiency
  • Russian Professional working proficiency
  • Azerbaijani Native or bilingual proficiency
  • Turkish Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Q.E.D INTERNATIONAL AT BP
    GOC FOUNDATION COURSE ''CERTIFICATION AND ITS ROLE IN TECHNICAL INTEGRITY AT BP.
    Jun, 2007
    - Oct, 2024
  • OPTICAL FIBRE INSTALLATIO AND TESTING
    Conducted by: City and Guilds of London Institute Dublin, Ireland
    Nov, 2001
    - Oct, 2024
  • CompEx
    JTLimited
    Dec, 2017
    - Oct, 2024

Experience

    • Azerbaijan
    • Oil and Gas
    • 1 - 100 Employee
    • Electrical Engineer
      • Apr 2021 - Present

      ACE BP Project ACE BP Project

    • United States
    • Staffing and Recruiting
    • 700 & Above Employee
    • Electrical Engineer
      • Feb 2019 - Apr 2021

      ACE BP Project ACE BP Project

    • France
    • Business Consulting and Services
    • 1 - 100 Employee
    • Electrical Commissioning Engineer
      • Sep 2016 - Dec 2018

      Good inter-personal skills. Ability to produce written reports and plans.Computer literate in MS Word and MS Excel.Ability to read and understand engineering drawingsInvolvement with Engineering Contractor in design phase.Site Acceptance Testing Commissioning of HV and LV , UPS systems .Dynamic Commissioning for acceptance by Client Fully conversant with BP’s GOC requirementsControl of “As building” documents in accordance with the project procedure

    • Construction Engineer
      • Nov 2014 - Aug 2016

      Supervision of electrical & instrumentation works for construction subcontractor and supervision of electrical &Instrumentation inspection and commissioning process for client.

    • Electrical Commissioning Engineer
      • May 2013 - Apr 2014

      Good inter-personal skills. Ability to produce written reports and plans.Computer literate in MS Word and MS Excel.Ability to read and understand engineering drawingsInvolvement with Engineering Contractor in design phase.Site Acceptance Testing Commissioning of HV and LV , UPS systems .Dynamic Commissioning for acceptance by Client Acting as Senior Authorised Electrical Person (SAEP) after assessment and approval by the Project Electrical Technical AuthorityFully conversant with BP’s GOC requirementsControl of “As building” documents in accordance with the project procedure Show less

    • Deck Electrical Commissioning Senior Supervisor
      • Aug 2011 - May 2013

      Coach and train National Electrical personnel and ensure that they are provided opportunities to attend formal training courses which benefit the Project and would enhance their capabilities. Respond to engineering site queries where clarification of design is required and liaise with Eng contractor where an Engineering response to SEQ’s is requiredWitnessing and acceptance of Site Acceptance Tests.Fully conversant with BP’s GOC requirementsAttend site RTC meetings and participate in level 2 risk assessmentsEnsuring all Electrical Commissioning personnel carryout their work and are fully trained in accordance with site PTW procedures.Perform Area Authority duties in accordance with PTW procedure Show less

    • E&I Engineer
      • Jul 2007 - Aug 2011

      E&I Engineer. Preparation of work packs, job cards & project estimation for the BP Caspian Engineering and modifications construction group to complete all works. Supervision of electrical & instrumentation works for construction subcontractor and supervision of electrical &Instrumentation inspection and commissioning process for client. Liaise with construction supervision and other completions disciplines to address all discipline interfaces and resolve any areas of congestion and clashes Liaise with quality control and monitor requirements Estimating required quantity of materials for construction Ensure the electrical and instrument completions scope is implemented in accordance with the specifications, technical data and the completion schedule. Ensure all “as-built” drawings & mark-ups for construction and fabrication work scope are prepared Preparation of man-hour estimates and installation job cards for all construction/commissioning activitiesas the work proceeds and kept safely for later formal drafting and handover to the client. Show less

    • Indonesia
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Supervisor Electrical Engineer
      • Aug 2004 - May 2007

      Supervisor Electrical EngineerSupervision of electrical &Instrumentation construction team. Responsible for E&I handover documentation. Implementation of additional work scope.Ensure the electrical and instrument completions scope is implemented in accordance with the specifications, technical data and the completion schedule. Ensure all “as-built” drawings & mark-ups for construction and fabrication work scope are prepared

    • Section Leader Electrical Engineer
      • Mar 2004 - Aug 2004

      Section Leader Electrical EngineerSupervision of electrical &Instrumentation construction team.Implementation of additional work scope.Ensure the electrical and instrument completions scope is implemented in accordance with the specifications, technical data and the completion schedule. Ensure all “as-built” drawings & mark-ups for construction and fabrication work scope are prepared

    • E&I QC Inspector A
      • Dec 2003 - Feb 2004

      E&I QC Inspector AInspection of electrical / mechanical / instrumentation equipment; compiling QC reports leading to final release of equipment from the Vendor. Inspection surveys of electrical / instrumentation equipment in hazardous areas.Inspection of support structures, main and field supports, welding of ladder rack and cable tray offsets and modifications.

    • United States
    • Design Services
    • Electrical Supervisor
      • Jan 2003 - Jun 2003

      Supervision of electrical &Instrumentation construction team. Implementation of additional work scope.

    • Electrical Supervisor
      • Jan 2002 - Dec 2002

      Supervision of electrical &Instrumentation construction team. Implementation of additional work scope.

    • Electrical Supervisor
      • Dec 2000 - Oct 2001

      Supervision of electrical &Instrumentation construction team. Implementation of additional work scope.

    • Instrument calibration technician
      • Jul 2000 - Dec 2000

      calibrated meter,calibrated scale&calibrating apparatus,calibrating device

    • Commissioning Supervisor
      • Feb 2000 - Jun 2000

      Testing of HV cables, LV control cables and capacitor banks.CT, VT primary & secondary injection stability tests for bus bars, transformers and generators.

    • Electrical Supervisor
      • Dec 1998 - Nov 1999

      Supervision of electrical &Instrumentation construction team. Implementation of additional work scope. Supervision of electrical &Instrumentation construction team. Implementation of additional work scope.

    • Electrician (7 grade)
      • Feb 1997 - Aug 1997

      Glanded &Terminated and Testing of HV and LV cables, Glanded &Terminated and Testing of HV and LV cables,

    • Puerto Rico
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Telemechanics and Supervisory Controls Lead Engineer
      • Aug 1991 - Feb 1997

      Information calculation center. Information calculation center.

Education

  • Azerbaijan Technical University
    Bachelor,Master, Department of Radio Communication and Radio Broadcasting
    1985 - 1991

Community

You need to have a working account to view this content. Click here to join now