Raghunandhan Reddy
Assistant Manager MEP at CYBERCITY Builders & Developers Pvt. Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Hindi Full professional proficiency
-
English Professional working proficiency
-
Telugu Native or bilingual proficiency
Topline Score
Bio
Experience
-
CYBERCITY Builders & Developers
-
Construction
-
100 - 200 Employee
-
Assistant Manager MEP
-
Jun 2018 - Present
Internal and External Electrical Activities. FFPH, Firefighting Works such as Smoke detection, Fire Alarm System, CCTV, BMS, PA System. VESDA Etc. Execution of Substations, Solar Power Plants, Site Engineering. Installation of 400/220 KV, 220/33KV, 33/11KV switchyard. (CT, CVT, Circuit Breaker, LA, Isolator, Wave Trap , Gantry Towers , LT Transformer, Control Room lighting system, LT Switchgear & Protection Panels , DG’s. Internal and External Electrical Activities. FFPH, Firefighting Works such as Smoke detection, Fire Alarm System, CCTV, BMS, PA System. VESDA Etc. Execution of Substations, Solar Power Plants, Site Engineering. Installation of 400/220 KV, 220/33KV, 33/11KV switchyard. (CT, CVT, Circuit Breaker, LA, Isolator, Wave Trap , Gantry Towers , LT Transformer, Control Room lighting system, LT Switchgear & Protection Panels , DG’s.
-
-
-
GE Power
-
United States
-
Electric Power Generation
-
700 & Above Employee
-
Installation Leadership Specialist, Lead Engineer, Site Engineering.
-
Dec 2014 - Jun 2018
Project Coordination, Vendor Management, Successful Sourcing, Procurement activities of Solar, EPC, Substation, EHV Turnkey Electrical projects. • Handled 10x10MW Solar PV Project, 400/220KV, 220/132KV Substations, Transmission & Distribution, EPC EHV Turnkey Projects. • Execution of High-rise buildings, Villas, Commercial buildings, Power Plants, Site Engineering, Electrification work. • Execution & supervising all Erection activities of main and Allied Equipment’s of 400KV, 220KV, 132KV in switchyard. (CT, CVT, Circuit Breaker, LA, Isolator, Wave Trap, Gantry Towers, LT Transformer, LT Switchgear & Protection Panels, DG’s, Batteries, SAS, Stringing etc). • Co-ordination with Site team, anchoring on-site electrical engineering and overseeing the performance of sub-contractors, ensuring compliance with predefined plans to accelerate the activities for completion of project in Scheduled time. • Preparation of Work orders, special conditions for Contracts and Contractors as per the requirement and Specifications of Client/Project. Show less
-
-
-
ECI Engineering & Construction Company Ltd
-
India
-
Construction
-
100 - 200 Employee
-
Electrical Engineer
-
Jun 2010 - Jun 2014
• Executing the Plan as per Layout Drawing. • Erection of 400KV, 220KV, 132KV in switchyard Equipments. (CT, CVT, Circuit Breaker, LA, Isolator, Wave Trap, Gantry Towers, LT Transformer, LT Switchgear & Protection Panels, DG’s, Batteries, SAS, Stringing etc). • Coordinating with Client, Site staff, sub-contractors, vendors for smooth execution completion of project. • Monitoring and recording all site activities and cost being expended on the project. • Preparing Sub Contractors Erection Bills and reconciliation of material. • Preparation of Project closeout documentation, Handing over of As built Drawings, O&M Manuals. Show less
-
-
Education
-
Osmania University
Master of Business Administration - MBA, Marketing -
Jawaharlal Nehru Technological University
Bachelor of Technology (BTech), Electrical and Electronics Engineering