Senior Cost Consultant at A.W. Hooker Associates Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
Topline Score
Bio
Credentials
-
Bullet Proof Manager
Crestcom InternationalNov, 2020- Oct, 2024 -
Project Construction Management Certificate
George Brown College Continuing EducationApr, 2018- Oct, 2024 -
Safety Training (Confine Spaces)
-Jan, 2011- Oct, 2024 -
Safety Training (Working at Height)
-Jan, 2011- Oct, 2024 -
Project Management Course /PMI Institute UAE
-Jan, 2010- Oct, 2024 -
Commercial Construction Management
-
Experience
-
A.W. Hooker Associates Ltd.
-
Canada
-
Construction
-
1 - 100 Employee
-
Senior Cost Consultant
-
Feb 2018 - Present
• Review of detailed design documents and preparation of (pre-construction) structural/architectural cost estimates • Performing pricing research, cost analysis and participating in reconciliation meetings with project managers and clients • Benchmarking requirements against similar projects • Preparation of contractor’s payment recommendations • Coordinating with project team, attending meetings with client and other stakeholders • Review of detailed design documents and preparation of (pre-construction) structural/architectural cost estimates • Performing pricing research, cost analysis and participating in reconciliation meetings with project managers and clients • Benchmarking requirements against similar projects • Preparation of contractor’s payment recommendations • Coordinating with project team, attending meetings with client and other stakeholders
-
-
-
2MK Architects Inc.
-
Canada
-
Architecture and Planning
-
1 - 100 Employee
-
Project Manager
-
Aug 2017 - Feb 2020
Oversaw building construction and monitored work progress. Extensive project coordination, scheduling and time management skills.Worked on preparing notice of change and supplementary instructions for ongoing projects. Review shop drawing, evaluating samples submitted and maintaining reports.Interpreted contract provisions to help resolve claims and questions raised by the contractors Oversaw building construction and monitored work progress. Extensive project coordination, scheduling and time management skills.Worked on preparing notice of change and supplementary instructions for ongoing projects. Review shop drawing, evaluating samples submitted and maintaining reports.Interpreted contract provisions to help resolve claims and questions raised by the contractors
-
-
-
HLG Contracting
-
United Arab Emirates
-
Construction
-
1 - 100 Employee
-
Senior Construction Manager
-
Dec 2012 - Apr 2017
Project: Zubair Oil Field Development Project (Al-Rafidhya Degassing Station), IRAQ. Client: Weatherford Oil Tools Middle East Ltd • Prepared detailed schedules for weekly activities • Supervised, monitored and coordinated all activities such as earthworks, excavation, foundation, framing and concrete, roads and fencing • Monitored and controlled all subcontractors involved in executing equipment foundations, sewage treatment plants, oil storage tank foundations, oil tanks bund walls and HDPE lining, • Controlled all road works, rain water, swells and the installation of all plant fences • Executed firefighting system including all works related to underground HDPE pipe line network, valve chambers, and fire hydrants installation
-
-
-
-
Construction Manager
-
Apr 2012 - Dec 2012
Project: Arzanah Medical Complex – $110Million included the construction of a hospital, a clinic, an energy centre and a medical gas storage building. The scope of work also includes landscaping and internal design.
-
-
Construction Manager
-
Apr 2011 - Apr 2012
Project: Feature tower (Capital Gate) (B+G+M+34-Storey tower hotel and offices) Contract Value US$ : 328 MillionCommencement : 2007Completion : 2012The tower tilts at a record 18 degrees westward.Designed to be 160 meters high with 35 floors of varying sizes, The tower was officially certified by the Guinness Book of Record as being the furthest leaning man-made structure in the world.
-
-
Construction Manager
-
Aug 2009 - Apr 2011
Project: Dubai Pearl / project value :US$ 2.4 Billion, A per-certified LEED Gold project Composed of 3 residential towers plus one offices tower with 73-storeys each crowned by a prestigious sky-palace at the last upper levels Location : Dubai, U.A.E.Contract Value US$ : 2.4 BillionClient : Pearl DubaiCommencement : 2009
-
-
Senior Project Engineer
-
May 2005 - Aug 2009
Contract Value US$ : 71 MillionsCommencement : 2005Completion : 200830-storey residential tower and 14-storey office tower, rising from a common podium Traditional Arabic architectural design elements with modern architectural features and crowned steel dome20 swimming pools /Residential tower
-
-
-
-
Project Engineer
-
Aug 2003 - May 2005
Project type: Al Seef Tower: U$ 55 millions (Proposed B+G+ M+ 43 Residential Towers) Client: Dubai Islamic bank Consultant: Dar consultant Project type: Al Seef Tower: U$ 55 millions (Proposed B+G+ M+ 43 Residential Towers) Client: Dubai Islamic bank Consultant: Dar consultant
-
-
Education
-
University of Technology - Iraq
Bachelor of Engineering - BE, Building and Construction Engineering