Rafael Ruiz Pardo

Survey Draftsman at Ace Contractors Group Pty. Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Villafranca de los Barros, Extremadura, Spain, ES
Languages
  • Español Native or bilingual proficiency
  • Ingles Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

LinkedIn User

Rafael, we met only once, but you did a great job in Kufa underpass. Aliedad and the team of Aliedad is very proud of your work. Well done, and would love to work with you again in the future, Sincerely, Wamidh,

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Construction
    • 100 - 200 Employee
    • Survey Draftsman
      • Nov 2021 - Present

    • Australia
    • Construction
    • 1 - 100 Employee
    • Drafter personal
      • Nov 2020 - Nov 2021

    • Australia
    • Construction
    • 1 - 100 Employee
    • Land surveyor
      • Jul 2020 - Aug 2020

      • Feature and level survey of new subdivision and established area for buildings in Vic. • Rescode Feature Surveys. • AHD survey. • As-built survey. • Feature and level survey of new subdivision and established area for buildings in Vic. • Rescode Feature Surveys. • AHD survey. • As-built survey.

    • Australia
    • Civil Engineering
    • 300 - 400 Employee
    • Land Surveyor
      • Nov 2019 - Jun 2020

      Responsibilities • Set out curbs, sewer, drainage, public lighting pipes, TBM, pavements, app. • Survey picks up, app. • Produce an accurate “as-built” survey report. • Calculate accurate setout files from approved design drawing • Carry out all aspects of surveying and data modeling tasks as directed by the survey/project manager. Achievements Improve AutoCAD and Civil 3D skills, management GPS, and robotic total station, Topcon, and Trimble. Responsibilities • Set out curbs, sewer, drainage, public lighting pipes, TBM, pavements, app. • Survey picks up, app. • Produce an accurate “as-built” survey report. • Calculate accurate setout files from approved design drawing • Carry out all aspects of surveying and data modeling tasks as directed by the survey/project manager. Achievements Improve AutoCAD and Civil 3D skills, management GPS, and robotic total station, Topcon, and Trimble.

    • Spain
    • Construction
    • 200 - 300 Employee
    • Chief Land Surveyor.
      • Jun 2016 - Jun 2019

      Gradsko – Prilep Expressway, Section Farish-Drenovo km. 0+000 – 10+197Design, (CAD): • Drainage net (geometric). • Adjustments concrete buildings, (foundations, piers, bridge deck, bracket, pavements, and fence) • Adjustments horizontal and vertical alignment, longitudinal and cross sections, and pavements. • Road marking and traffic signing. • Traffic by-pass. Measurements: Construction book, IPS and IPC control.• Take measurements and initial assessment than create report of comparison of measurements obtained on site and the ones existent on initial project drawings. • Monthly re-measurement and review. • Final measurements and review of results against basic design.Calculations: • Make the files to GPS and total station whit horizontal and vertical alignments, and the sections roads. • Changes of horizontal and vertical alignments, and sections roads. • Surveying and leveling General: • Checking and control of the surveyor equipment’s. • Coordination of the surveying teams. • Held meetings with the employer and engineer about the project adjustment problems in order to find the solutions. Site works: • Setting out and control in the viaducts, (foundations, piers, bridge deck, bracket, pavements, and fence). Show less

    • Chief Land Surveyor
      • Nov 2015 - Jun 2016

      Construction works of corridor X, E80 motorway, section to Ciflik to PirotDesign, (CAD): • Drainage net (geometric). • Adjustments concrete buildings, (foundations, piers, bridge deck, bracket, pavements, and fence) • Adjustments horizontal and vertical alignment, longitudinal and cross-sections, and pavements. • Road marking and traffic signing. • Traffic by-pass. Measurements: Construction book, IPS and IPC control.• Take measurements and initial assessment than create a report of comparison of measurements obtained on-site and the ones existent on initial project drawings. • Monthly re-measurement and review. • Final measurements and review of results against basic design.Calculations: • Make the files to GPS and total station whit horizontal and vertical alignments, and the sections roads. • Changes of horizontal and vertical alignments, and sections roads. • Surveying and leveling General: • Checking and control of the surveyor equipment. • Coordination of the surveying teams. • Held meetings with the employer and engineer about the project adjustment problems in order to find the solutions. Site works: • Setting out and control in the viaducts, (foundations, piers, bridge deck, bracket, pavements, and fence). Show less

    • Construction
    • 1 - 100 Employee
    • Surveyor manager.
      • Jun 2014 - Jan 2015

      (النفق نهائ)MUSLEM IBN AQUEEL UNDERPASS, AL-NAJAF AL-ASHRAF , IRAQ (النفق نهائ)MUSLEM IBN AQUEEL UNDERPASS, AL-NAJAF AL-ASHRAF , IRAQ

    • Spain
    • Construction
    • 1 - 100 Employee
    • Chief Land Surveyor.
      • Nov 2010 - Nov 2013

      Project: Highway A-27 stretch Tarragona-El Morel Design, (CAD): • Drainage net (geometric). • Adjustments concrete buildings, (foundations, piers, bridge deck, bracket, pavements, and fence) • Adjustments horizontal and vertical alignment, longitudinal and cross-sections, and pavements. • Road marking and traffic signing. • Traffic by-pass. Measurements: Construction book, IPS and IPC control. • Take measurements and initial assessment than create a report of comparison of measurements obtained on-site and the ones existent on initial project drawings. • Monthly re-measurement and review. • Final measurements and review of results against basic design. Calculations: • Make the files to GPS and total station whit horizontal and vertical alignments, and the sections roads. • Changes of horizontal and vertical alignments, and sections roads. • Surveying and leveling General: • Checking and control of the surveyor equipment. • Coordination of the surveying teams. • Held meetings with the employer and engineer about the project adjustment problems in order to find the solutions. Site works: • Setting out and control in the viaducts, (foundations, piers, bridge deck, bracket, pavements, and fence). Show less

    • Netherlands
    • Civil Engineering
    • 700 & Above Employee
    • Surveyor manager / senior land surveyor / setting out engineer
      • Sep 1998 - Sep 2010

      Deberes: Diseño, (CAD): • Red de drenaje (geométrica). • Adecuaciones a edificaciones de concreto, (cimientos, pilas, tablero de puente, ménsula, aceras y cerco) • Ajustes de alineación horizontal y vertical, secciones longitudinales y transversales, y pavimentos. • Señalización vial y de tráfico. • By-pass de tráfico. Mediciones: Libro de obra, control IPS e IPC. • Toma de medidas y evaluación inicial para luego realizar un informe de comparación de las medidas obtenidas en obra y las existentes en los planos iniciales del proyecto. • Remedición y revisión mensual. • Mediciones finales y revisión de resultados contra diseño básico. Cálculos: • Realizar los archivos a GPS y estación total con alineamientos horizontales y verticales, y los tramos viales. • Cambios de alineaciones horizontales y verticales, y tramos viales. • Topografía y nivelación General: • Comprobación y control del equipo topógrafo. • Coordinación de los equipos de topografía. • Reuniones con el patrón y el ingeniero sobre los problemas de ajuste del proyecto para encontrar las soluciones. El sitio funciona: • Replanteo y control en los viaductos, (cimentaciones, pilas, tablero de puente, ménsula, aceras y vallado) Show less

    • Spain
    • Construction
    • 700 & Above Employee
    • setting out engineer / Surveyor engineer
      • Jul 1994 - Oct 1997

      Some projects: Rías Bajas Highway, stretch Orense – Allariz. The local road from Berdoyas to Muxía Livestock market in Santiago de Compostela. duties: • Monthly re-measurement and review. • Surveying and leveling • Checking and control of the surveyor equipment. • Setting out and control in the viaducts, (foundations, piers, bridge deck, bracket, pavements, and fence). Some projects: Rías Bajas Highway, stretch Orense – Allariz. The local road from Berdoyas to Muxía Livestock market in Santiago de Compostela. duties: • Monthly re-measurement and review. • Surveying and leveling • Checking and control of the surveyor equipment. • Setting out and control in the viaducts, (foundations, piers, bridge deck, bracket, pavements, and fence).

Education

  • Universidad de salamanca
    Geomatics and Topography Engineer, Topography
    2013 - 2013
  • Escuela politecnica de Mérida
    Technical Engineer of topography
    1992 - 1995

Community

You need to have a working account to view this content. Click here to join now