Rafael Gallego Quiceno
Design Engineer at Instrument Systems GmbH- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Español Native or bilingual proficiency
-
Inglés Full professional proficiency
-
Alemán Professional working proficiency
Topline Score
Bio
Experience
-
Instrument Systems GmbH
-
Germany
-
Appliances, Electrical, and Electronics Manufacturing
-
100 - 200 Employee
-
Design Engineer
-
Oct 2021 - Present
www.instrumentsystems.com www.instrumentsystems.com
-
-
-
Chrosziel
-
Germany
-
Movies, Videos, and Sound
-
1 - 100 Employee
-
Design Engineer
-
Jul 2020 - Sep 2021
www.chrosziel.de www.chrosziel.de
-
-
-
Philips
-
Netherlands
-
Hospitals and Health Care
-
700 & Above Employee
-
R&D Engineer
-
Aug 2019 - Jan 2020
www.philips.de/healthcare www.philips.de/healthcare
-
-
-
CMI
-
Germany
-
Medical Equipment Manufacturing
-
1 - 100 Employee
-
CAD Engineer
-
Aug 2016 - Jul 2019
www.contract-medical.com COMPANY PROFILE: Medical-Engineering RESPONSABILITIES: -Design and development of catheters and medical devices -Technical drawings for production -Sketching of concepts -Working area: CAD lab www.contract-medical.com COMPANY PROFILE: Medical-Engineering RESPONSABILITIES: -Design and development of catheters and medical devices -Technical drawings for production -Sketching of concepts -Working area: CAD lab
-
-
-
Krampitz Tanksystem GmbH
-
Wolfsburg Area, Germany
-
Design Engineer
-
Jan 2013 - Jul 2016
www.krampitz.de COMPANY PROFILE: Fuel-Automotive Industry RESPONSABILITIES: -Filtering fuel systems (gas – diesel) -Design of gas stations tanks -Design of storage fuel tanks -Design of equipment and components -Technical drawings for different projects -Working area: Single wall tanks 10ft, 20ft, 40ft – Double wall tanks 10ft, 20ft, 40ft. Place: Engineering offices. www.krampitz.de COMPANY PROFILE: Fuel-Automotive Industry RESPONSABILITIES: -Filtering fuel systems (gas – diesel) -Design of gas stations tanks -Design of storage fuel tanks -Design of equipment and components -Technical drawings for different projects -Working area: Single wall tanks 10ft, 20ft, 40ft – Double wall tanks 10ft, 20ft, 40ft. Place: Engineering offices.
-
-
-
Ford Motor Company
-
United States
-
Motor Vehicle Manufacturing
-
700 & Above Employee
-
Engineer-Intership
-
Oct 2011 - Sep 2012
www.ford.es COMPANY PROFILE: Automotive Industry RESPONSABILITIES: -Improving Action plans -Support Launch Team of the New Ford Kuga 2012 -Updating Master schedule and countermeasures -Updating Scorecard matrix -Making and updating new process sheets for work stations -Working area: Body sides, underbody, framing (chassis) of Ford C-Max and new Ford Kuga. Place: Assembly Plant Body II. Almussafes. www.ford.es COMPANY PROFILE: Automotive Industry RESPONSABILITIES: -Improving Action plans -Support Launch Team of the New Ford Kuga 2012 -Updating Master schedule and countermeasures -Updating Scorecard matrix -Making and updating new process sheets for work stations -Working area: Body sides, underbody, framing (chassis) of Ford C-Max and new Ford Kuga. Place: Assembly Plant Body II. Almussafes.
-
-
-
NavalCat Internacional S.A.S
-
Medellín, Colombia
-
Industrial Designer
-
May 2007 - Mar 2009
www.yachtcat.com COMPANY PROFILE: Yacht and Boat Design RESPONSABILITIES: -Designing of yacht interiors and exteriors -2D and 3D drawing of mechanical parts - Simulations of mechanical procedures -Designing of halls, rooms, main deck, engine compartment and terrace -Planning of water and electrical conducts for the Boat 120ft project -Buying parts for Yacht Cat 56ft and Boat 120ft project -Working area: Yacht Cat 56ft and Boat 120ft Project. Place: Main Plant. www.yachtcat.com COMPANY PROFILE: Yacht and Boat Design RESPONSABILITIES: -Designing of yacht interiors and exteriors -2D and 3D drawing of mechanical parts - Simulations of mechanical procedures -Designing of halls, rooms, main deck, engine compartment and terrace -Planning of water and electrical conducts for the Boat 120ft project -Buying parts for Yacht Cat 56ft and Boat 120ft project -Working area: Yacht Cat 56ft and Boat 120ft Project. Place: Main Plant.
-
-
Education
-
Universitat Politècnica de València (UPV)
Máster, Ingeniería del Diseño -
Universidad Pontificia Bolivariana
Profesional, Diseño Industrial