Raef Mohsen

Instrumentation and Control Engineer at GulfSpic
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cairo, Egypt, EG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Oil and Gas
    • 100 - 200 Employee
    • Instrumentation and Control Engineer
      • May 2019 - Present

      Responsible for maintenance of all instrument activities in Gas manifolds and ABB RTU & SCADA system Responsible for maintenance of all instrument activities in Gas manifolds and ABB RTU & SCADA system

    • 200 - 300 Employee
    • Instrument Planning Engineer
      • Sep 2017 - Feb 2019

      Responsible for Planning and Maintenance of all instrument activities and Control systems (DCS, ESD, PLC and SCADA system) Responsible for Planning and Maintenance of all instrument activities and Control systems (DCS, ESD, PLC and SCADA system)

    • Instrument Engineer
      • Mar 2011 - Sep 2016

      Maintenance Instrument Engineer •Designing, Implementing and Commissioning of new control loops as per site requirements. •Leader for MS&R (maintenance survey and recovery team) in pre-shutdown & shutdown time. •Ability to troubleshoot, Repair and maintain instrument devices like (many types of level transmitters, many types of flow transmitters , PT, DP, TT, Analyzers, Sensors, Switches, Indicators) types such as (ABB, Endress+Hauser, Emerson Rosemount, Krohne and Siemens). •Maintenance and calibration of the valves (Pneumatic control valves, MOV, and ESDV, On/Off valves.....) such as … (Biffi, ABB, Fisher, Flowserve, Airtorque). •Familiar with types of Control Systems as per plants and Logic checking, PID tuning and Set-up. (DCS: Honeywell TDC 3000, Experian 310.3, Experian PKS). (PLC: Allen Bradley, Siemens Sematic S7-400/300, Ge Fanuc 90-70, FT-50). •(ESD system: Honeywell safety builder, Hima) and Partial Stroke. (Bently Nevada 3500, 3300 measuring system). (Scada system: Motorola, G-Monitor). •Experienced in all instrument which related to Centrifugal Gas Compressors (GE, Avon Dresser rand), Instrument air and Plant air Compressors (Atlas Copco), Gas turbine (Dresser rand, Rolls Royce), Gas Engine (Cooper Bessemer, Rolls Royce), and types of Pumps for different process (Sulizer). Show less

    • Germany
    • Business Consulting and Services
    • Instrument Engineer
      • Dec 2008 - Feb 2011

      Construction Instrument Engineer •Reviewing contract documents related to scope and obtaining clarity in contract scope from projects and client. Preparation & Reviewing and Familiar with drawings / documents like P&ID, Plot Plane, Instrument index, I/O list, Loop diagram, Cable tray layout, wiring diagram, Cable schedule, Process Hook up, Cause &effect, data sheets, Logic diagram, equipments manuals. •Preparing final as built documentation and punch list and defective notes for quality control. •Instruments supports Fabrication and Erection, Instruments Installation, cable tray Fabrication and Installation types of cables laying as per drawing, Termination, Continuity & Mugger. •Installation all control systems cabinets in control room and internal connection until start-up. •Steam tracing system & Heat tracing system. •FIRE & GAS system (smoke, heat, flame UV/IR ((Flammable gas (Methane & Hydrogen), Toxic gas (H2S). •Prepare Instrumentation BOQs and MTOs. •Worked collaboratively with process engineers, OTS engineers. •Executes daily job planning and arranges work permit for the jobs. •Prepares reports for specific failures by carrying out root- cause Analysis. •Suggests modification for cost saving and to increase reliability Show less

    • Instrument Engineer
      • Jun 2007 - Oct 2008

      Construction Instrument Engineer •Reviewing contract documents related to scope and obtaining clarity in contract scope from projects and client. Preparation & Reviewing and Familiar with drawings / documents like P&ID, Plot Plane, Instrument index, I/O list, Loop diagram, Cable tray layout, wiring diagram, Cable schedule, Process Hook up, Cause &effect, data sheets, Logic diagram, equipments manuals. •Preparing final as built documentation and punch list and defective notes for quality control. •Instruments supports Fabrication and Erection, Instruments Installation, cable tray Fabrication and Installation types of cables laying as per drawing, Termination, Continuity & Mugger. •Installation all control systems cabinets in control room and internal connection until start-up. •Steam tracing system & Heat tracing system. •FIRE & GAS system (smoke, heat, flame UV/IR ((Flammable gas (Methane & Hydrogen), Toxic gas (H2S). •Prepare Instrumentation BOQs and MTOs. •Worked collaboratively with process engineers, OTS engineers. •Executes daily job planning and arranges work permit for the jobs. •Prepares reports for specific failures by carrying out root- cause Analysis. •Suggests modification for cost saving and to increase reliability Show less

Education

  • Higher Technological Institute
    acceptable, B.SC Electrical and Computer Engineering

Community

You need to have a working account to view this content. Click here to join now