Raed Ghanem
Site Manager at El-Concorde.Construction Co.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
El Concorde Construction
-
Construction
-
1 - 100 Employee
-
Site Manager
-
May 2008 - Present
- Project Manager for Phosphate Dust Control Project. Aqaba Ports. - Senior Mechanical Engineer in Aqaba School Projects USAID - Project Manager in dismantling old fuel generators in Amman - Mechanical Manager at Zatary Pump Station and Zatary Hofa Pipeline - Mechanical estimation for different projects in estimation department - Mechanical Manager site manager, in Housing Bank for Trade and Finance New Head Quarter Building Project , Shmeisani. - Mechanical Manager in Upgrade to wastewater treatment plants at Wadi Arab & Central Irbid Show less
-
-
-
-
Mechanical Engineer and Site Manager
-
Jan 2005 - Apr 2008
- Gas Conversion Project in Jordan Phosphate Mines Co. (JPMC) including: Complete gas network piping system, steel structure and high pressure steam lines erections, super heaters erection and with Kiln 1 &2 - Network design for de-dusting system at Jordan Cement Factory / packaging area - Project Manager for Medium Heater Upgrading Project in Jordan Cement Factory Fuhais and Rashedieh - Special raw material chute project in Jordan Cement Factory, manufacturing and installation - Heavy fuel oil filters project. Jordan Cement Factory Show less
-
-
-
-
Mechanical Engineer
-
Sep 2000 - Dec 2004
- Insulation of chemical tanks for Kemapco Co. / Aqaba - Supervision of insulation works for Bromine Plant at Safi/ Jordan. Main activity :Supervising insulation of piping, tanks, vessels, and equipments which include Rockwool, fiber glass, calcium silicate, with Aluminum and stainless steel cladding. - Site engineer for construction / De-dusting systems / Jordan Magnesium Plant at Safi / Jordan. Main activities: * Fabrication and installation of dust collectors. * Ducts construction ranges from 6 to 36 inches pipes and required accessories. - Site engineer. Upgrading Liquefied Gas Filling Station Project. Zarqa & Irbid site, Jordan. Mainly piping and equipment erection. Main activities: * Fabrication & Erection of LPG, steam, cold and hot water pipes. * Fabrication and erection pipe supports different types. * Pumps and compressors erection. * LPG filling station erection. * Fire fighting systems construction. * Thermal insulation and painting. Show less
-
-
Education
-
Jami'at Al-Ulum Al-Tatbiqiya
Mechanical Engineering