Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Peter Perera, PMP

Seth LeMaster is a SOLID design professional, whom I have the utmost pleasure in recommending. Seth and I worked together on many international projects over the past seven years and I found him to lack for nothing. His work ethic is superior, attention to detail outstanding and dedication to the task at hand, second to none.....Best of Luck my friend.

Krishna P.

It’s my pleasure to endorse Seth. I worked with Seth over the course of approximately five years while he was with Meier Architecture and Engineering (Meier). On several high-profile international projects for which Meier provided engineering and design services, Seth was responsible for obtaining accurate field information, providing tactical advice during site surveys, and generating drawings. Our client, the US Department of Energy (DOE), severely limited our time on the ground at each site. During the day, Seth provided input to the site selection team regarding instrument location, while at the same time gathering critical site information. Then, during the evening, Seth generated the background drawings and installation details to present to the local users the next day. Of all the team members, I suspect Seth slept the least during our deployments. Even so, he always demonstrated a positive, professional attitude and delivered the goods. Back in the states, I would frequently request drawings, and other services with just a phone call, and Seth always came through.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Project Management Professional (PMP)
    Project Management Institute
    Aug, 2012
    - Sep, 2024

Experience

    • Project Manager
      • Jul 2021 - Present

      Manage multiple subcontractors for construction support services for several contractors. Manage mutiple contracted personell at multiple DOE sites. Part 107 Remote Pilot providing photogramtery, video and aerial surveys for HMIS Manage multiple subcontractors for construction support services for several contractors. Manage mutiple contracted personell at multiple DOE sites. Part 107 Remote Pilot providing photogramtery, video and aerial surveys for HMIS

    • United States
    • Staffing and Recruiting
    • 1 - 100 Employee
    • Senior Project Manager
      • Jul 2014 - Jul 2021

      Managed Electrical Engineering Department. Manage project execution to ensure adherence to budget, schedule, and scope. Monitor or track project milestones and deliverables. Build credibility, establish rapport, and maintain communication with stakeholders at multiple levels, including those external to the organization. Define and initiate projects, manage cost, schedule, and performance of component projects, while working to ensure the ultimate success of each project. Submit project deliverables, ensuring adherence to quality standards. Direct or coordinate activities of internal project team and external subcontractors. Confer with project personnel to identify and resolve problems. Aerial Survey and Photogrammetry Show less

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Sr. Project Designer
      • Mar 2004 - Jun 2014

      Second Line of Defense, AHTNA, Sacramento, CA – Lead Project Designer Under the Megaports Initiative/Core Program, responsible for over 23 International Megaports, Airports, Rail and Border Crossing RPM design and installations. Responsibilities including assisting in preparing proposals, SOW, schedule, budget, managing the design team , site survey, conceptual design, civil, structural, mechanical and electrical design, drafting, construction support, interactions with U.S., and foreign Officials as well as with various vendors and contractors through all phases of the projects. Develop 3D presentation layouts for in-country project reviews. Generate the Schedules of Values (SOV) during all project phases, Power and Communications Conduit/Cable Schedules. Prepare and reconcile as-built drawings to SLD specifications, and preparation of construction documents as well as travel to foreign countries such as Egypt, Singapore, Taiwan, Bangladesh, Sri Lanka, Azerbaijan and Belgium for site surveys, field engineering and construction support. • Radiation Portal Monitor Deployment, Battelle PNNL, Richland, WA – Lead Designer Responsible for various U.S. border crossing RPM design and installations. Responsibilities including conceptual design, drafting and client interactions through all phases of the projects. Design and prepare electrical, mechanical, structural and civil engineering drawings for Land Vector RPM projects. Standards Development for: electrical utility panels, standard engineering guides covering installations of Pedestrian, Vehicle and Rail RPM’s, standard electrical installation drawings for Advanced Spectroscopic Portals. Show less

    • United States
    • Aviation and Aerospace Component Manufacturing
    • 1 - 100 Employee
    • Technical Designer 3
      • 2001 - Mar 2004

      Designer/SME for 747 Engineering Liaison developing corrective action for rejection tags and ELR's. Investigated / evaluated suspect problem, created layouts, validated engineering, coordinated with factory, supplier and various support organizations to establish corrective action that achieved the quickest most cost-effective solution with the least impact to production. Prepared installation, assembly and detail part drawings for release according to Boeing release requirements. Performed package audit on engineering change packages to verify completeness, accuracy, compliance to Standard Work, Boeing Design Standards and Program Design Specification’s to ensure error free packages. Contributed in defining and documenting their current redline, package audit and module owner standard work and standardizing processes to eliminate waste, improve quality and increase productivity. Performed duties as Subject Matter Expert for 747 Liaison Engineering Production Support Center. Mentored Tech Designers on 747 Liaison processes, Standard Work and Boeing Standards Show less

    • United Kingdom
    • Design
    • 1 - 100 Employee
    • Contract Technical Designer
      • 1999 - 2001

      Designer for 747 Engineering Liaison developing corrective action for rejection tags and ELR's. Investigated / evaluated suspect problem, created layouts, validated engineering, coordinated with factory, supplier and various support organizations to establish corrective action that achieved the quickest most cost-effective solution with the least impact to production. Prepared installation, assembly and detail part drawings for release according to Boeing release requirements. Designer for 747 Engineering Liaison developing corrective action for rejection tags and ELR's. Investigated / evaluated suspect problem, created layouts, validated engineering, coordinated with factory, supplier and various support organizations to establish corrective action that achieved the quickest most cost-effective solution with the least impact to production. Prepared installation, assembly and detail part drawings for release according to Boeing release requirements.

    • United States
    • Architecture and Planning
    • Designer II
      • 1999 - 1999

      Design/Drafting of mechanical, electrical, structural, civil and food processing facilities. Prepared detail, assembly and engineering drawings for release including designs, system layout, solid modeling, checking, and redline correction using AutoCAD Release 14 and 2000. Responsible for evaluating and updating to AutoCAD 2000. Preformed installation, system configuration, writing of MEIER AutoCAD menu, new plot configuration and lisp routines for release 2000, as well as teaching an AutoCAD 2000 update class to fellow employees. Show less

    • United States
    • Airlines and Aviation
    • Contract Technical Designer
      • 1996 - 1998

      Designed cargo floor and frame structures for 757-300, 767-400ER Structures and 767 DCAC group. Prepared Installation, assembly and detail drawings for release including: design, solid modeling, checking, and redline correction according to Boeing requirements using Catia, Fly-thru, PDM, Aplg, Word, Excel, etc. Responsible for coordination with other groups for design integration and all interference dispositioning in TDPA. Group Focal for Aplg and Fly-thru for group. Designed cargo floor and frame structures for 757-300, 767-400ER Structures and 767 DCAC group. Prepared Installation, assembly and detail drawings for release including: design, solid modeling, checking, and redline correction according to Boeing requirements using Catia, Fly-thru, PDM, Aplg, Word, Excel, etc. Responsible for coordination with other groups for design integration and all interference dispositioning in TDPA. Group Focal for Aplg and Fly-thru for group.

    • United States
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • Designer II
      • 1991 - 1996

      Design Team member for the EnviroGlass Mobile Vitrification system with primary responsibility for the Melter and the spray test bed while assisting in design of piping and support structure. Design of chemical decontamination equipment including; electrical, piping, equipment (pump, motor, tanks) and all support structure, as well as plant system tie-ins and routing. Coordinated integration of equipment, equipment locations and Tie-in to Plant systems with Plant facilities. Performed work at nuclear facilities including; equipment layout, setup, installation, tie in to plant connections and operated chemical cleaning equipment. Prepared detail and assembly drawings including design, system layout, 3D modeling, rendering, checking, and redline correction using AutoCAD R13, Ame, Autoplant, Accurender, and various Allegro packages. Set and maintained standards, symbol libraries, lisp routines, menus, etc. Show less

    • Cad Drafter
      • 1990 - 1991

      Prepared electrical details and drawings including design, system layout, 3D modeling and redline correction using AutoCAD R10. Design and Layout of 3D wireframe of electrical raceways. Prepared electrical details and drawings including design, system layout, 3D modeling and redline correction using AutoCAD R10. Design and Layout of 3D wireframe of electrical raceways.

    • United States
    • Book and Periodical Publishing
    • Cad Drafter
      • 1989 - 1990

      Prepared Architectural and Electrical details and drawings including design, system layout, 3D modeling and redline correction using AutoCAD R10. Maintain standards, symbol libraries, lisp routines, etc Prepared Architectural and Electrical details and drawings including design, system layout, 3D modeling and redline correction using AutoCAD R10. Maintain standards, symbol libraries, lisp routines, etc

Education

  • PMI PMP Cert Class
    Project Management
    2012 - 2012
  • The Cadd Institute
    Computer Aided Drafting and Information Systems
    1988 - 1989
  • The Phoenix Institute of Technology
    Architectural Drafting and Design
    1987 - 1988
  • Richland High School
    Drafting and Design Technology/Technician, General
    1983 - 1986

Community

You need to have a working account to view this content. Click here to join now