R. Godara

Sr Traction Power Engineer at SYSTRA USA
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United States, US
Languages
  • English Full professional proficiency
  • Hindi Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • PMP
    Project Management Institute
    Mar, 2018
    - Nov, 2024
  • PE (Electrical Power)
    Board of Professionbal Engineers Land Surveyors and Geologosts, California, USA
    Dec, 2017
    - Nov, 2024
  • CEng
    Institution of Engineering and Technology (IET)
    Jun, 2014
    - Nov, 2024
  • MIET
    Institution of Engineering and Technology (IET)
    Dec, 2013
    - Nov, 2024

Experience

    • United States
    • Rail Transportation
    • 100 - 200 Employee
    • Sr Traction Power Engineer
      • May 2023 - Present

      Currently working as Senior Traction Power Engineer responsible for design of OCS, Third Rail, Power Supply for Rail and Transit Systems for various projects Currently working as Senior Traction Power Engineer responsible for design of OCS, Third Rail, Power Supply for Rail and Transit Systems for various projects

    • United States
    • Professional Services
    • 700 & Above Employee
    • Senior Supervising Engineer
      • Nov 2016 - Apr 2023

      Senior Supervising Engineer responsible for design of OCS, Power Supply for Rail and Transit Systems for various projects and Texas High Speed Rail Project. Senior Supervising Engineer responsible for design of OCS, Power Supply for Rail and Transit Systems for various projects and Texas High Speed Rail Project.

  • Hyderabad Metro Rail Project
    • Hyderabad Area, India
    • Chief Resident Engineer Power Supply and Traction
      • Nov 2013 - Nov 2016

      I worked as Chief Resident Engineer / Power Supply and Traction/ Hyderabad Metro Rail / M/s Feedback Infra Services (in JV partnership of AECOM) having responsibility for design reviews and execution supervision of Power Supply and Traction, SCADA, E&M including Quality assurance and interface coordination with Viaduct, Track, STC, COMM and Building services etc. I was responsible for project engineering & management including planning, co-ordination of different disciplines, direction, mobilization of resources; liaise with Railways, RDSO, EIG, CRS and other agencies. Monitoring project timeline, progress reviews and presentations etc. Commissioned 80 TKMs of OCS, 2 Receiving cum Traction Sub Stations, 20 Auxiliary Power sub stations and SCADA Show less

    • Truck Transportation
    • 700 & Above Employee
    • Sr Divisional Electrical engineer, Traction Rolling Stock Operations
      • Apr 2011 - Nov 2013

      I was heading the Electrical loco operations of Secunderabad Division, which is one of the largest Divisions of Indian Railways with originating loading of 70 MTs a year, 300 passenger carrying trains daily, with an average daily Freight loco holding of 150 nos. In addition, two minor workshops for loco maintenance were also being managed. The responsibility includes management of app. 2300 odd crew, their trainings, refreshers, medical examinations, their rest periods, working hours, promotions etc. and standardising specifications, procurement, tender evaluations, contract management for various service and other contracts, and trouble shooting and minor maintenance of Traction Locos. Show less

    • Sr Divisional Electrical Engineer, Traction Distribution
      • Nov 2007 - Apr 2011

      As head of Traction distribution of one of the largest divisions of Indian Railways having approximately 2500 Kilometres of Electrified Track with 17 Traction substations, 55 switching stations and two SCADA systems, the main job included maintenance of these assets and liaisoning with DISCOMs for different items whose power bills were of app. Rs.20 Crores a month.Responsibility included leading a team of 100 engineers and 600 staff, carrying out many construction activities related to system improvements especially for introduction of Engine on load at 9 sidings by suitably designing and modifying the OHE at these sidings; the design of which was latter accepted as standard for Railways.Designing and execution of modification of OHE at almost 40 stations to make it suit to Schedule of Dimensions, which was done duly blocking the traffic, a scarce commodity. Associated for commissioning of app.500 TKMs of OHE along with 3 Traction Sub stations. Show less

    • Truck Transportation
    • 700 & Above Employee
    • Various Positions in Railway Electrification
      • May 1995 - Aug 2006

      The responsibility included Site Survey, Pegging, Designing, Preparation of schedules, tendering, tender evaluation, planning and procurement of material, execution of works, of Track electrification, Transmission Lines, Power supply arrangements (220/132/25KV), SCADA, modifications to power line crossings, tackling other issues related to Forest, land acquisition, labour and mines departments for facilitating the execution, commissioning, obtaining mandatory sanctions from Electrical Inspector and Commissioner of Railway safety and opening the line for electric traction implying project management from scratch to finish and then reconciliation of the material, handing over of assets along with as erected drawings and winding up the site. It also included management of professional engineers and support staff and contractors for under mentioned projects. • Vijayawada-Rajmundary 25 KV AC track electrification (350 TKM) along with Traction Sub Stations at Vatlur, Samalkota and Ankapalli (First TSSs with electronic Relays and Chinese transformers) and SCADA at Vijayawada of South Central Railways. • 25KV AC Electrification of section Hatia-Bondamunda-Bursuan-Kiruburu (400 TKM) along with TSSs at Chandiposh (220/25KV), Roxy (220/25KV), Nuagaon, Bakaspur, Lodhma with app. 100 KMs of 132 KV Transmission line and SCADA at Bondamunda of then S.E. Railway. • 25KV AC Electrification of 350 KMs track along with TSSs at Hatia-Muri-Bokaro Steel City and Chandil- Muri-Barkakhana. • 25KV AC Electrification of 1200 KMs of Track in Ludhiana-Amritsar and Saharanpur-Moradabad sections along with TSSs at Chehuru, Butari, Roorkie, Fazalpur and Kanth of Northern Railway. Show less

Education

  • Osmania University
    Master of Business Administration (MBA), Finance, General
    2010 - 2013
  • M B M Engineering College Jodhpur
    Bachelor of Engineering (B.E.), Electrical Engineering
    1985 - 1989
  • Sainik School Chittorgarh
    Senior Secondary, PCM
    1978 - 1985

Community

You need to have a working account to view this content. Click here to join now