quyyum sohaimi

Assistance Manager ( Process and maintenance) at Network Foods Industries
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Shah Alam, Selangor, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Market Research
    • 1 - 100 Employee
    • Assistance Manager ( Process and maintenance)
      • May 2021 - Present

    • Market Research
    • 1 - 100 Employee
    • Process Engineer
      • Mar 2019 - Mar 2021

      1. Monitor and analysis OEE and GE (Global Efficiency) for wrapping and moulding Section. a. Improvement on planned time b. Improvement on nugget output 2. Do mapping for chiller system, boiler system, WWTP and chocolate piping system. 3. Do study for machine capacity for moulding and wrapping machine. 4. Do plant layout for boiler capacity study, chiller capacity study, WWTP, wrapping machine and moulding machine for new plant expand. 5. Involve in new refiner purchasing project- analysis on machine capacity from sugar mill, mixer, refiner and conche (Layout study and VSM) 6. VSM acitivty 7. Man power reduction/ Cost effective project 8. Support mechanical engineer task and Executive Engineering task (Due to no replacement after their resignation): a. Control man power and task (Spare part, machine issue, downtime data collection, KPI collection and troubleshooting) related to mechanical wrapping team, boiler team and general mechanical team. b. Interact with government authority (DOSH and DOE) for. i. Yearly boiler, pressure vessel, inspection by booking inspection and update payment, at MYjkkp website. ii. Monthly key in Waste water treatment result to OER system (pH reading, BOD, COD, discharge quantity, and etc). iii. Yearly emission stack monitoring for boiler PROJECT a. New Refiner Buhler SFL1300 (Completed) b.Mini Production Line- In progress c. New shrink Wrap machine (man power reduction project) d. Implemented Sifter at 3 moulding line (Capex approved, now waiting for PO) e. Nugget Depositor (In progress) - Capex approve by managing director f. Re layout wrapping machine to reduce man power (Completed) g. New product (spread chocolate) machinery and layout arrangement Show less

    • Malaysia
    • Manufacturing
    • 200 - 300 Employee
    • Process Engineer
      • Mar 2017 - Mar 2019

      Job Scope as Process engineer 1. Control diaper manufacturing line a. Control Parameter involve in diaper manufacturing line. b. Production daily report c. Provide Maintenance list for glue maintenance activity 2. Reporting a. Monthly report for downtime, stop and waste, MTTR and MTBF analysis,plan vs unplan activity and change over activity b. Weekly Report c. Daily report 3. Improvement activity a. Financial waste b. RCPS (Root cause problem solving) Activity i. Involve closely in improvement project to prevent reject product escape to customer, and reduce rejection rate. ii. Using PDCA and DMAIC method during implementation of RCPS. c. Sanitation program d. ISO 9001:2015 i. Involve closely in development of ISO 9001:2015 for first time in Vinda Malaysia. ii. Provide work instruction for each material handling (With team) iii. Training production team members and giving assessment for each work instruction. e. Trial i. Involve closely in any material trial at production line. ii. Provide report for each material trial at line (Waste, runnability and time to complete trial) f. SMED (Single minute exchange Die) i. Involve in SMED project for Product change, SKU change and Size change Show less

    • Malaysia
    • Plastics Manufacturing
    • 1 - 100 Employee
    • Continuous Improvement Engineer
      • 2014 - 2017

      Job Scope Improvement engineer a. Monitor daily efficiency and inefficiecny and provide answer why inefficiency is high (special cause) and provide improvement, inefficiency due to: b. Provide monthly Finishing report consist of target, achievement, OEE and quality issue related to tobacco. Project A. Recondition chuck to side edge defect (reduce 3% inefficiency at -one machine only) Objective: To reduce Side edge reject at A1 machine (top rejection rate base on pareto). Using six sigma method and implement DMAIC (define, measure, analyze, improve and control) B. Reduce packaging item to reduce packaging cost Objective: To reduce packaging for cost reduction. totally reduce travel work distance. Job Scope as Process engineer (Finishing Department) 1.Develop Standard good machine setting (SGMS) parameters such as tension, motor torque, multiplier, unwinder tension, tension to diameter factor, taper tension percentage, taper speed percentage 2.Daily output meet target, and analyze why target not achieve. 3.Check daily performance base on output, why target cannot been achieve due to electrical, mechanical or operation issue. 4.Identify throughput to analyze machine capability 5.Monthly update at monthly review KPI meeting with GM, Directors and Managing directors for finishing operation side. Job Scope Maintenance engineer (Finishing department) 1.Control both electrical and mechanical preventive maintenance activity at Finishing department. 2.Update to Finishing Manager on what need to do during PM 3.Identify root cause for any issue, and update it to Finishing manager on what is action need to do and strategic solution to prevent same issue from happen again. 4.Control Finishing NPT for both electrical and mechanical and daily update. 5.Liase with supplier if has any part that company not capable to do due to machine issue or part complexity, 6.Update all issue happen on one month and suggest strategic solution and action that already been done Show less

    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Production Engineer
      • 2012 - 2014

      Job scope • Monitor JIT lorry delivery • Implement LPS at CFS and Die casting area • Improve visualization at CFS and Die Casting area • Improve production quality yield • Provide 8D report for customer if has quality issue • Provide technical report • Support die casting production • Monitor department OEE Project • Combine 2 shifts into 1 shift at filing section • Relayout CFS area (additional capacity) • ESS (Employee Suggestion Scheme) Programme coordinator • Change process • Reduce dented defect (reduce 30%) • Reduce bend defect Show less

Education

  • Universiti Putra Malaysia
    Master's degree, Manufacturing Engineering
    2013 - 2015
  • UNIVERSITI MALAYSIA PAHANG
    Bachelor's degree, Manufacturing Engineering
    2009 - 2012
  • Politeknik port dickson
    High School Diploma, Manufacturing Engineering
    2006 - 2009

Community

You need to have a working account to view this content. Click here to join now