Quynh Esser

Chef d’équipe opérations hyperbare at VINCI Construction Maritime et Fluvial
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Fréjus, Provence-Alpes-Côte d'Azur, France, FR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Yanick Guenego

I worked several times with Quynh. I saw him evolve, becoming skilled in welding, cutting (surface as underwater), crane orientation... I consider him as a good commercial diver, pleasant to work with, as well as for the safety, the concern, the rapidity.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • France
    • Construction
    • 100 - 200 Employee
    • Chef d’équipe opérations hyperbare
      • Nov 2018 - Present

    • France
    • Professional Training and Coaching
    • 1 - 100 Employee
    • Instructor
      • May 2017 - Present

    • Scaphandrier
      • Feb 2016 - Mar 2016

      Rallongement de 15 mètre de l'écluse de roche tailler Travaux sous-marin de contrôle ,bathymétrie,soudure ,découpage broco , bétonnage de seuil et de radier. Batardage et contrôle d'étanchéité Rallongement de 15 mètre de l'écluse de roche tailler Travaux sous-marin de contrôle ,bathymétrie,soudure ,découpage broco , bétonnage de seuil et de radier. Batardage et contrôle d'étanchéité

    • Scaphandrier
      • Feb 2016 - Feb 2016

      Construction, inspection Construction, inspection

    • scaphandrier soudure decoupage
      • Jan 2015 - Jan 2016

    • Scaphandrier soudeur
      • Sep 2014 - Feb 2015

      Soudure support d'anode

    • scaphandrier
      • Jun 2014 - Aug 2014

      Pose de Recife artificielle ,pompage

    • scaphandrier
      • May 2014 - Jul 2014

      Pompage

    • scaphandrier os decoupage broco
      • May 2014 - May 2014

      Découpage broco des cadres des portes poste 66

    • scaphandrier os decoupage broco
      • Aug 2014 - Sep 2014

      Découpage de rideaux de palplanche visi 0 Découpage de rideaux de palplanche visi 0

    • scaphandrier
      • Apr 2014 - May 2014

      Mise en place de radier pour pose de pieux béton support de panne à port grimaud Mise en place de radier pour pose de pieux béton support de panne à port grimaud

    • scaphandrier (os) decoupage broco
      • Feb 2014 - Feb 2014

      Découpage visibilité 0 de pieux (80)dans le port de carnon Découpage visibilité 0 de pieux (80)dans le port de carnon

    • scaphandrier (os) soudeur
      • Nov 2013 - Dec 2013

      Os Pose et soudure d' anodes (450)dans le môle d'armement de la seine sur mer (Toulon) Os Pose et soudure d' anodes (450)dans le môle d'armement de la seine sur mer (Toulon)

    • scaphandrier (os) soudeur et decoupage broco
      • Oct 2013 - Nov 2013

      Construction d'un brise houle au port de canne Battage palplanches Découpage broco Soudure de tire fondsCoulage ,tirage radier béton . Construction d'un brise houle au port de canne Battage palplanches Découpage broco Soudure de tire fondsCoulage ,tirage radier béton .

Education

  • Inpp
    Classe 2 A commercial diver
    2009 -
  • SMF
    Bosiet/Huet
    2015 - 2015

Community

You need to have a working account to view this content. Click here to join now