Quy Dinh

Engineering Project Manager at Marine Service Noord
  • Claim this Profile
Contact Information
Location
Netherlands, NL
Languages
  • English -
  • Vietnamese -

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Lean Six Sigma Green Belt
    The Knowledge Academy
    Dec, 2022
    - Sep, 2024
  • Managing Projects with Microsoft 365
    LinkedIn
    Nov, 2022
    - Sep, 2024
  • Managing Projects with Microsoft Teams
    LinkedIn
    Oct, 2022
    - Sep, 2024

Experience

    • Netherlands
    • Shipbuilding
    • 1 - 100 Employee
    • Engineering Project Manager
      • Apr 2022 - Present

      • Project Y722: 111 metre motor yacht – OceAnco project.- Manage the engineering budget, planning, progress and KPI of the project.- Manage the team of 11 engineers with 5 out-sourcing engineers. - Manage the output quality of the team.- In charge of co-operation with other co-makers (Ocean-Co; HRMarine; H&H; Multi) to exchange the information, issue discussion and problem solving.- Improve engineering process for MSN engineering department by making Cadmatic macro tools, excel macro tool and engineering check list.- In co-operate with OceAnco team to improve the engineering process for future OceAnco projects. Show less

    • Engineering Project Manager
      • Apr 2022 - Apr 2022

    • Mechanical-Cadmatic Engineer
      • Aug 2018 - Apr 2022

      • Project VL821: 118,80 metre steel hull twin azipod diesel electric feadship motor yacht.- Assist project manager to lead the team of 5 engineers to manage production information for whole project.- Keep track the output quality of the team.- In co-operation with project manager and lead engineers of Van Lent to solve the issues, requests from production and owner representative team.- In co-operate with Van Lent team to create some tools by Excel macro and Cadmatic macro for integrating the production information from NX parts and Cadmatic parts of the projects.- Report the progress and required capacity to MSN project manager.• Project Y721: 125m sailing yacht project wings – OceAnco project.- Creating 3D models for equipment. Make the arrangement for all equipment of project. Keep track the changes of the equipment.- Extracting information from diagrams, pipe routing, and production info (combination drawings, foundation drawing, spool drawing) creating.- In charge of co-operation with other co-makers (Ocean-Co; DKME; H&H; Orca) to exchange the information, issue discussion and problem solving.- Production support. Show less

    • South Korea
    • Appliances, Electrical, and Electronics Manufacturing
    • 300 - 400 Employee
    • R&D Planning Management Manager
      • May 2017 - Jul 2018

      • Making Business Plan (BP) yearly, Rolling Plan (RP) &Key Performance Indicator (KPI) monthly for R&D team. • Support and supervise all engineers for building up the planning for each project. Making sure the daily work follows the plan and the deadline of mass-production reached. • Make plan and interview for hiring engineers and operator base on the master development plan. • Make the working process for logistic all material and sample within R&D team. • Training LG logistic system (DWMS) for all engineers and operators. Be responsible for this system as administrator in Viet Nam. • Be responsible as a chairman for Engineering Change (EC) committee. To lead R&D engineers cooperated with other departments to finish all the changes related to Design after starting Mass-production. • Co-work with production management and other team to review the issue of production plan to find the solution to solve it. • Manage all R&D operators in warehouse. Show less

    • Vietnam
    • Shipbuilding
    • 1 - 100 Employee
    • Mechanical Team Leader
      • Dec 2015 - May 2017

      11/2016 – 05/2017 Mechanical specialist and Cadmatic key-user - Support technical issues of projects during engineering and production support.- Make the development plan for technical knowledge within the team.- Make the checklist for projects.- Set up piping spec for projects in DSCS.- Make Cadmatic report for checking of detail engineering such as checking component position ID, piping attribute , length of measure pipe.- Support for Cadmatic issues and contact Cad support in Damen shipyard Gorinchem.- Train Cadmatic for new comers. 07/2016 – 11/2016 Detail engineering supporter in North American shipbuilding in USA.• Detail engineering as supporter in contract between Damen and North American shipbuilding for projects:- Creating 3D models for equipment.- 3D Pipe routing for systems: bilge, fuel oil, cooling, sanitary, FSD (filling, sounding, de-aeration), lubricating oil, HVAC routing, exhaust, cable tray routing, hydraulic.- Production information: Iso, spool, axonometric, layout drawing such as: cable tray arrangement, cable strips arrangement, exhaust arrangement, final engine room arrangement, HVAC arrangement, combination, holes plan.- Exported list: Material list, spool list, equipment list…o Tug boat ASD 3212 (Develop from Damen ASD 3212).o Tug boat ASD 4517 (Azimuth Stern Drive 45m length 17m width).12/2015 – 06/2016 High Speed Craft (HSC) mechanical engineering team leader and Cadmatic key-user, 10 engineers. Mechanical team-leader:- Control the planning and capacity for HSC team.- Estimate the budget and discuss with customer (DSGor) for scope of work, starting and ending date of new projects.- Control the quality for output of all HSC projects which are designed at Damen Song Cam engineering.- Support team members for technical and Cadmatic issues.Cadmatic key-user:- Set up piping spec for projects in DSCS.- Support for Cadmatic issues and contact Cad support in Damen shipyard Gorinchem.- Train Cadmatic for new comers. Show less

    • Senior engineer and Cadmatic key-user
      • Dec 2014 - Dec 2015

      Cadmatic key-user:- Set up piping spec for all projects in DSCS.- Support all team members for Cadmatic issues and contact Cad support in Damen shipyard Gorinchem.- Create and complete guidelines of Cadmatic working procedures.- Train Cadmatic for new comers.Project:• FCS4008 (Axe bow ship - Fast crew supply 40m length 8m width) Detail engineering by Cadmatic as FOC (First point of Contact) to lead the team of 7 members:- Contact DSGor for input information such as scope of work, diagram drawing, preliminary of engine room arrangement, equipment list…- Making detail engineering planning based on detail engineering scope and deadline/budget.- Divide jobs for engineers in the project team.- Contact DSGor daily for missing information and feedback of the input received.- Check the output for every system and drawings to control the quality of project.- Report to DSGor weekly about the using budget and progress of project.• Spa5009 (Coast Guard - Stan Patrol 55m length 09m width)Detail engineering by Cadmatic software as a team member:- Creating 3D models for all equipment.- Pipe routing for some systems such as: bilge, fuel oil, cooling, sanitary, FSD (filling, sounding, de-aeration), lubricating oil, HVAC routing, exhaust, cable tray routing, hydraulic, air compressor, dispersant, external Fi-Fi, pre wetting, CO2 system.- Production information: Iso, spool, axonometric, layout drawing such as: cable tray arrangement, cable strips arrangement, exhaust arrangement, final engine room arrangement, HVAC arrangement, combination, holes plan.- Exported list: Material list, spool list, equipment list… Show less

    • Mechanical Engineer
      • Jun 2013 - Dec 2014

      • FCS2610 (Catamaran Twin Axe - Fast crew supply 26m length 10m width).Converting all drawings of the project from Mars system to IFS (Industrial Financial System).• Detail engineering by Cadmatic software as a team member for some projects:- Creating 3D models for all equipment.- Pipe routing for some systems such as: bilge, fuel oil, cooling, sanitary, FSD (filling, sounding, de-aeration), lubricating oil, HVAC routing, exhaust, cable tray routing, hydraulic, air compressor, dispersant, external Fi-Fi, pre wetting, CO2 system.- Production information: Iso, spool, axonometric, layout drawing such as: cable tray arrangement, cable strips arrangement, exhaust arrangement, final engine room arrangement, HVAC arrangement, combination, holes plan.- Exported list: Material list, spool list, equipment list…o Tug boat ASD2913 (Azimuth Stern Drive 29m length 13m width).o Tug boat ASD3212 (Azimuth Stern Drive 32m length 12m width).o Tug boat STU4013 (Stan Tender Tug 40m length 13m width).• Design in Cadmatic for detail engineering of Tug boat 4013 for 1 month working in Damen shipyard Gorinchem.• Production support for project: Tug boat ASD3213 (Azimuth Stern Drive 32m length 13m width). Show less

    • Vietnam
    • Facilities Services
    • 1 - 100 Employee
    • Mechanical Engineer
      • Jun 2012 - Jun 2013

      • Responsible for maintaining and repairing all water pumps, air blower, air compressor, water piping system, and other machinery for water treatment plant and sewage treatment plant; • Supervise the operation team. • Responsible for maintaining and repairing all water pumps, air blower, air compressor, water piping system, and other machinery for water treatment plant and sewage treatment plant; • Supervise the operation team.

    • Vietnam
    • Maritime
    • 1 - 100 Employee
    • Oiler
      • Apr 2011 - Mar 2012

      • Maintain, repair equipment and systems in the engine room such as diesel engine, purifier, air compressor, boiler, oily water separator, air conditioner, refrigeration system, hydraulic system and pumps. • Support 3rd engineer and Chief engineer oil bunkering. • Clean engine room and cargo holds. • Maintain, repair equipment and systems in the engine room such as diesel engine, purifier, air compressor, boiler, oily water separator, air conditioner, refrigeration system, hydraulic system and pumps. • Support 3rd engineer and Chief engineer oil bunkering. • Clean engine room and cargo holds.

Education

  • Universidad San Jorge
    Master of piping engineering and design, Engineering
    2020 - 2021
  • Vietnam Maritime University
    Bachelor's degree, Marine Engineering
    2006 - 2011
  • Pham Ngu Lao High school

Community

You need to have a working account to view this content. Click here to join now