    • Qatar
    • Construction
    • 1 - 100 Employee
    • QA/QC Engineer
      • Dec 2020 - Present

      Scope of Work.Construction of 03 Bridges (250 Meters), Mechanical stabilized earth retaining walls (08 MSE walls), Cycle Track, and Road and Highway with all related external works (stormwater lines, EHV Culverts, micro tunnels, landscape, and TSE line).Investigation and provide resolution to any non-conformances issued by the consultant/client;Physical inspections including Alignment setting out with level survey checks. Soil sampling and testing checks in formation, general fill, sub-base, and road base materials.Concrete mix design checks, including aggregate and cement sampling and testing.Asphalt mix design checks, including aggregate and bitumen sampling and testing, also transportation and laying specification requirements.Surface regularity measurements ensuring compliance with specified tolerances in all layers of construction.Reviewing of ITP's. Monitor daily field construction operations to ensure compliance with approved Project/s Design Drawings and approved Project/s Quality Plans.

    • Site Engineer
      • May 2019 - Dec 2020

      Responsibility for all track types (Rheda C,Rehda D and EBS) execution.Over all execution of track works ( Track Slab,Track Installation,Turnout installation,Concreting,Alumino thermite Welding of Track,UT Tests) in all stages of construction.Managing Track Team to perform the job according to contract, technical specification and monitoring the progress according to the schedule.Attending meeting with Consultants in order to optimize the progress and to solve the problem.Guiding team workers in technical as well as safety concern of all activities.Reviewing design reports and all quality documents like ITP, Method statement,shop Drawings,etcSchedule the work and prepare the PTW accordingly.Carrying out all the required inspections at different phases of Track works from inspection till completion.Day to Day Dealing with Work permits officer (WPO) and Work Train officer (WTO).

    • Site Engineer
      • Nov 2018 - May 2019

      • Monitoring and co-coordinating with contractors on all aspects of Hardscape and Softscape procurement.•Construction of Roads ,Recreational Tracks( Bicycle,Jogging,and Horse track),•Hardscaping & and Softscaping including all MEP works.• Hardscape, including exterior stonework (paving of roadways, pedestrian walkways and Parking lots.• Softscape, including Irrigation Line,Chambers, on-sit and associated landscape elements [soil mixing, leveling .• Construction of Various Chambers Including TSE Line. Portable water Line, Fire Hydrant Line Etc• Review and approval of shop drawings, materials samples, mock-ups etc• Onsite design modifications and implementation of additional clients' requests• Participating in the preparation of periodical progress report; • Correspondence with client, project managers and contractors•Observes that the work is carried out in a safe manner, discussing or correcting minor infractions and taking more appropriate action, consistent with the HSE Manual, when significant health, safety and environmental infractions are encountered.• Ensure adherence to Health and Safety Policy and Procedures and comply with all work instructions.

    • Qatar
    • Construction
    • 1 - 100 Employee
    • Site Engineer (Doha Metro Track Project)
      • Aug 2015 - Oct 2018

      Major Activity: Doha Metro Track WorkManufacturing Inspection of Pre Cast Slabs segments, at MLPA Pre cast factory  Supervision and arranging all materials for the Pre cast slabs. Arrangement and Transportation of the segments to the yard according to specification. Construction of Heavy mass-spring system as Track bed at Red Line and Green line.  Track slab Inspection and Installation of slabs after Proper marking according to Drawing.  Installation of LWR according to design and adjustment of Track according to Gedo Survey reports.  Installation of Turn out slabs, Turn Out Rails, switches, and Guards Rails etc.  Carrying out pre-Pour Inspections prior to grouting of the Track and Post Pour Inspection after. Supervision of all machines operating on the track.  Ensuring Track geometry as according to design, and gauge & doing shimming where required. Supervising all rails welding including FB weld and Aluminu thermite welding, Grinding (Foot Grinding and Head grinding) and ultrasonic track inspection.  Coordinates all inspections, Monitor the required tests, record all the inspections and tests. Maintaing Welding Tracker properly. Installation of Third Rail at Green Line according to Specifics drawings.  Carrying out all Repair Works of the track, refastening the track, cleaning and doing soundness tests for the HMSS part.  Supervision of foundations liaises with client representative for the conduct of day to day quality related project activities.  Ensuring the works is being carried out in accordance with contract requirements and Method Statement.  Measuring the work done on regular basis and keeping the record.  Take actions to deal with the results of delays, bad weather, or emergencies at site.  Evaluate construction methods and determine the cost-effectiveness of plans.

    • Site Engineer
      • Jan 2014 - Aug 2015

      Specific Scope of work:  Supervision of all civil work activities. Supervision of Concreting of different structures like slabs and columns, basement. Planning and execution of work according to drawings and specifications. Preparation of bar bending schedule. Calculating the quantities of different materials like concrete, bricks, aggregate etc. Preparation of BOQs. Schedule the project in logical steps and budget time required to meet deadlines. Determine labor requirements and dispatch workers to construction sites. Inspect and review projects to monitor compliance with building and safety codes and other regulations. Prepare and submit budget estimates and progress and cost tracking reports. Take actions to deal with the results of delays, bad weather, or emergencies at construction site. Execution and supervision of ongoing works. Act as the main technical advisor on the construction site for subcontractors, skilled workers, and operatives. Check plans, drawings, and quantities for accuracy of calculations. Ensure that all materials used and works performed are as per specifications. Oversee the selection and requisition of materials and tools. Manage, monitor, and interpret the contract design documents supplied by the clients/architect. Prepare and update project schedule.

    • Site Civil Engineer
      • May 2013 - Dec 2013

      Project: Construction & Rehabilitation of Schools At kPk Layout of sites. Supervision of all civil work activities. Supervision of Concreting of different structures like slabs and columns, basement. Planning and execution of work according to drawings and specifications. Preparation of bar bending schedule. Calculating the quantities of different materials like concrete, bricks, aggregate etc. Preparation of BOQs. Schedule the project in logical steps and budget time required to meet deadlines. Determine labor requirements and dispatch workers to construction sites. Inspect and review projects to monitor compliance with building and safety codes and other regulations. Prepare and submit budget estimates and progress and cost tracking reports. Take actions to deal with the results of delays, bad weather, or emergencies at construction site. Evaluate construction methods and determine the cost-effectiveness of plans.

Education

  • University of engineering and technology Peshawer Pakistan
    Bachelor of Engineering (B.Eng.), Civil Engineering
    2009 - 2013
  • ISLAMIA COLLEGE PESHAWER
    Associate of Science - AS, Pre-Engineering
    2007 - 2009