PUJI WIYANTO
Nylon Production Assistant Manager at PT SANOH INDONESIA- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PT SANOH INDONESIA
-
Indonesia
-
Motor Vehicle Manufacturing
-
1 - 100 Employee
-
Nylon Production Assistant Manager
-
Jun 2019 - Present
Assist for Production GM activity Manage and control all Nylon production activity Cost and budgeting control Production team development Strategic plan adjustment to achieve KPI Countermeasure for not achieve KPI ERP bussiness owner C n C activity Assist for Production GM activity Manage and control all Nylon production activity Cost and budgeting control Production team development Strategic plan adjustment to achieve KPI Countermeasure for not achieve KPI ERP bussiness owner C n C activity
-
-
-
PT IK PRECISION INDONESIA
-
Jabodetabek , Indonesia
-
Molding Prod Assist Manager
-
Jul 2017 - Jun 2019
-
-
-
PT MARUHACHI INDONESIA
-
MM2100 CIKARANG
-
Engineering Supervisor for Plastic Injection Molding
-
Nov 2014 - Jul 2017
1. New product development control and current model improvement 2. In process control for abnormality condition in production line 3. TPM activity to increase employee productivity and company profit 4. Cost reduction analyze and implementation activity 5. Production Process improvement to get optimum productivity and best Quality 6. Engineering skill trainer 7. Ensure mold or spare part repair on schedule 8. Reduce in process defect and quick action for improvement 9. Mold Design Review for New mold development 10. Mold Maintenance control to prevent loss time mold problem in process 11. Supporting to Marketing department for project study cost 12. Negotiate to customer for new project problem and make recovery action and schedule 13. Ensure all internal technical problem solved Show less
-
-
-
-
-
Oct 2008 - Oct 2013
Controlling:1. Planning, updating, controlling schedule of new project preparation running well as Mass production target. Tooling making, trial schedule and repair/improve schedule, evaluation/testing, and approval2. Reporting to related department progress preparation part for new project3. Distribute all information from other department to follow up Engineering Department4. Controlling bidding part price from supplierTechnical:1. Conduct all of engineering activity for new project in technical purpose2. Guide new Engineer to follow up technical matter3. Conduct Part design review and issue modify part modification to head office if needed4. Conduct Tooling design review between Internal Tooling maker or External tooling maker5. Follow up comparison part price between company target price and supplier price6. Guide Engineer on trial, and target of trial7. Part Specification Approval Show less
-
-
-
Oct 2008 - Apr 2013
New Project Follow Up1. New Project study, between Part Design construction and Drawing2. Issue proposal part design modification if there is bad construction3. Follow up tooling making4. Collect schedule tooling making, trial, repair/improvement5. Follow up part trial, evaluation, approval6. Follow up trouble shooting related part that follow together with supplier7. Report all activity in supplier to New Project Model leaderCurrent Model Follow Up1. Supplier Controlling in QCD2. Production Line problem follow up together with Production Engineering3. Conduct part quality improvement in Supplier4. Renewal tooling follow up, collect the data and report to Mold EngineeringSpecialization Injection Plastic Part Show less
-
-
-
-
QUALITY CONTROL STAFF
-
Feb 2007 - Oct 2008
1. PRODUCTION QUALITY CONTROL 2. QC EQUIPMENT TRAINER 3. ISO 9001 INTERNAL AUDITOR 1. PRODUCTION QUALITY CONTROL 2. QC EQUIPMENT TRAINER 3. ISO 9001 INTERNAL AUDITOR
-
-
Education
-
STATE POLYTECHNIC OF SEMARANG
Associate's degree, Mechanical Engineering/Mechanical Technology/Technician -
SMU 1 PATI
-
SMU 1 PATI