Premendra Sinha
HOD-E&I at PT MUTU GADING TEKSTIL- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PT MUTU GADING TEKSTIL
-
Textile Manufacturing
-
1 - 100 Employee
-
HOD-E&I
-
Feb 2022 - Present
-
-
-
Bombay Dyeing
-
Retail
-
300 - 400 Employee
-
Sr. Manager E&I
-
Sep 2021 - Feb 2022
220 KV s/s, power distribution system, HT/ LT motors, transformers, AC variable frequency drives, PSF lines, retrofitting of breakers. Installation of refurbished transformer 30 MVA. 220 KV s/s, power distribution system, HT/ LT motors, transformers, AC variable frequency drives, PSF lines, retrofitting of breakers. Installation of refurbished transformer 30 MVA.
-
-
-
Welspun World
-
India
-
Executive Offices
-
700 & Above Employee
-
General Manager Electrical and Instrumentation
-
Aug 2015 - Aug 2021
Projects, Automation,66kv s/s, utilities, HT/LT motors, Energy saving. Projects, Automation,66kv s/s, utilities, HT/LT motors, Energy saving.
-
-
-
Century Enka Ltd
-
Textile Manufacturing
-
100 - 200 Employee
-
DGM Automation
-
Jul 2014 - Aug 2015
-
-
-
Micro Poly PET
-
Delhi, Panipat
-
DGM-E&I (Project)
-
Aug 2011 - Jul 2014
-Tendering, preparation of capex and opex of 2X 3.3 MW Natural gas based engines and 3X2.250 MVA DG sets. Finalisation of SLD,NGR drawings.Erection and commissioning for the same. -Ordering,installation an commissioning of 3 nos x 8 MKCal coal based HTM Heatres. -Ordering,inspection,installation and commissioning of 3 Nos x 2000KVA, 2 Nos. x 3150 KVA 11KV/433 Volts Transformers. -Selection of heat recovery on exhaust gas of the gas engine. Size being 1 MKCal. -Tendering for transformer, PCC, MCC and prepare Technical comparison , ordering, scheduling, erection, commissioning and start-up. -Selection of UPS, Inverters, Softstartes for various application. -Coordination with consultant MOTT Mac Donald. Show less
-
-
-
-
DGM Power and Automation
-
Apr 2008 - Aug 2011
Installation and commissioning of 2X 6.3 MW Wartsila Gas Engine sets. Installation and commissioning of 2X4.5 TPH Heat recovery boilers on exhaust flue gase ckt. Upgradation of obsolete variable frequncy AC drives with latest Siemens Sinamics drive with investment of about 2 Crores. Installation and commissioning of 2X 6.3 MW Wartsila Gas Engine sets. Installation and commissioning of 2X4.5 TPH Heat recovery boilers on exhaust flue gase ckt. Upgradation of obsolete variable frequncy AC drives with latest Siemens Sinamics drive with investment of about 2 Crores.
-
-
-
JCT Filament div, Hoshiarpur
-
Hoshiarpur
-
AGM Electrical and Instrumentation
-
Jun 2006 - Apr 2008
-Erection and commissioning of 6 MW Steam Turbine, 38 TPH rice husk fired boiler. -VFD installation on FD fan, Feedwater pump of the boiler for energy saving. - Implementation of energy saving techniques in the plant. -Erection and commissioning of 6 MW Steam Turbine, 38 TPH rice husk fired boiler. -VFD installation on FD fan, Feedwater pump of the boiler for energy saving. - Implementation of energy saving techniques in the plant.
-
-
-
Modipon Fibres ltd.
-
Modinagar
-
Sr. Manager Electrical and Instrumentation
-
Jan 1995 - Jun 2006
-Maintenance of VFD's, DC drives, PLC, PCC, MCC, motors. -Commissioning of EGT make 5 MW Gas turbine. -Erection and commissioing of 10 POY and 20 barmag make Nos. draw twisting machine. -Maintenance of VFD's, DC drives, PLC, PCC, MCC, motors. -Commissioning of EGT make 5 MW Gas turbine. -Erection and commissioing of 10 POY and 20 barmag make Nos. draw twisting machine.
-
-
Education
-
INDIAN SCHOOL OF BUSINESS MANAGEMENT AND ADMINISTRATION
Master of Business Administration - MBA, Project Management -
Govt. Engineering College, Rewa
Bachelor of Engineering - BE, Protection,transformer,network etc. -
Saraswati Higher Secondary School, Satna
Higher Secondary, Physics,Chemistry and Maths