PREM CHAND YADAV

Deputy Manager at Vishvaraj Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Delhi, India, IN
Languages
  • English Native or bilingual proficiency
  • Hindi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Environmental Services
    • 300 - 400 Employee
    • Deputy Manager
      • May 2022 - Present

    • India
    • Construction
    • 100 - 200 Employee
    • Sr. Engineer
      • Jul 2021 - Apr 2022

    • France
    • Environmental Services
    • 700 & Above Employee
    • Sr. Engineer - NRW & Operations
      • Feb 2019 - Jul 2021

      1) Network, Pressure & flow Survey study with team followed by creation of hydraulic model for Nangloi Water Services, West Delhi Project incorporating selection set, scenario management & cost optimized network. 2) UFW Reduction: Identification of bottlenecks which are imposing excess UFW values in terms of Apparent loss and suggest for correction. 3) Data Analysis: Analysis of NRW calculation data and help structuring them with the team for desired output. 4)To carry out… Show more 1) Network, Pressure & flow Survey study with team followed by creation of hydraulic model for Nangloi Water Services, West Delhi Project incorporating selection set, scenario management & cost optimized network. 2) UFW Reduction: Identification of bottlenecks which are imposing excess UFW values in terms of Apparent loss and suggest for correction. 3) Data Analysis: Analysis of NRW calculation data and help structuring them with the team for desired output. 4)To carry out DMA Establishment by ZPT, locate underground loss occurring areas by Step Test, estimate DMA real loss by calculating Net Night Flow etc Show less 1) Network, Pressure & flow Survey study with team followed by creation of hydraulic model for Nangloi Water Services, West Delhi Project incorporating selection set, scenario management & cost optimized network. 2) UFW Reduction: Identification of bottlenecks which are imposing excess UFW values in terms of Apparent loss and suggest for correction. 3) Data Analysis: Analysis of NRW calculation data and help structuring them with the team for desired output. 4)To carry out… Show more 1) Network, Pressure & flow Survey study with team followed by creation of hydraulic model for Nangloi Water Services, West Delhi Project incorporating selection set, scenario management & cost optimized network. 2) UFW Reduction: Identification of bottlenecks which are imposing excess UFW values in terms of Apparent loss and suggest for correction. 3) Data Analysis: Analysis of NRW calculation data and help structuring them with the team for desired output. 4)To carry out DMA Establishment by ZPT, locate underground loss occurring areas by Step Test, estimate DMA real loss by calculating Net Night Flow etc Show less

    • France
    • Environmental Services
    • 700 & Above Employee
    • ENGINEER
      • Jun 2015 - Jan 2019

      Water Audit: Audit of water in the bulk system of the city, estimation of volumetric water loss and mitigation. • Mass Balancing: Equitable distribution of bulk water to different inlets in the city as per water demand based on population density. • Rehabilitation & Commissioning of Distribution Network: Commissioned 9 nos. District Metering Areas (DMAs) and 3 no DMA’s into 24x7 water supply in New Delhi City with individual consumer metering in 10000 connections… Show more Water Audit: Audit of water in the bulk system of the city, estimation of volumetric water loss and mitigation. • Mass Balancing: Equitable distribution of bulk water to different inlets in the city as per water demand based on population density. • Rehabilitation & Commissioning of Distribution Network: Commissioned 9 nos. District Metering Areas (DMAs) and 3 no DMA’s into 24x7 water supply in New Delhi City with individual consumer metering in 10000 connections. • Team Building: Build a team of 15 member and trained them to expertise levels to carry out DMA Establishment, locate invisible water pipe line leakages by Helium Leak Detection test, estimate DMA real loss by calculating net night flow etc. O&M – overall responsibility to maintain existing service levels during the Capital works program with close integration & coordination with Zonal Operations teams covering - Leak repair & rehabilitation of existing network, pressure monitoring, complaint management & resolution, managing water crisis situations, tanker management, installation of new House service connections, detecting illegal connections & disconnection, Water quality monitoring, decommissioning of old network. Non Revenue Department & find leakage in under ground water pipe line by HELIUM LEAK DETECTION Technology. •Overall responsible for day-to-day operations of the water supply to the consumers, complaint management and emergency supplies •Overseen gradual conversion of Hydraulic Zones (HZs) from intermittent to continuous supply eg. Geetanjali 24x7, Navjeevan Vihar (approx. 500 connections), Saket HZ (approx. 5000 connections). Reduction of NRW to less than 15% Show less Water Audit: Audit of water in the bulk system of the city, estimation of volumetric water loss and mitigation. • Mass Balancing: Equitable distribution of bulk water to different inlets in the city as per water demand based on population density. • Rehabilitation & Commissioning of Distribution Network: Commissioned 9 nos. District Metering Areas (DMAs) and 3 no DMA’s into 24x7 water supply in New Delhi City with individual consumer metering in 10000 connections… Show more Water Audit: Audit of water in the bulk system of the city, estimation of volumetric water loss and mitigation. • Mass Balancing: Equitable distribution of bulk water to different inlets in the city as per water demand based on population density. • Rehabilitation & Commissioning of Distribution Network: Commissioned 9 nos. District Metering Areas (DMAs) and 3 no DMA’s into 24x7 water supply in New Delhi City with individual consumer metering in 10000 connections. • Team Building: Build a team of 15 member and trained them to expertise levels to carry out DMA Establishment, locate invisible water pipe line leakages by Helium Leak Detection test, estimate DMA real loss by calculating net night flow etc. O&M – overall responsibility to maintain existing service levels during the Capital works program with close integration & coordination with Zonal Operations teams covering - Leak repair & rehabilitation of existing network, pressure monitoring, complaint management & resolution, managing water crisis situations, tanker management, installation of new House service connections, detecting illegal connections & disconnection, Water quality monitoring, decommissioning of old network. Non Revenue Department & find leakage in under ground water pipe line by HELIUM LEAK DETECTION Technology. •Overall responsible for day-to-day operations of the water supply to the consumers, complaint management and emergency supplies •Overseen gradual conversion of Hydraulic Zones (HZs) from intermittent to continuous supply eg. Geetanjali 24x7, Navjeevan Vihar (approx. 500 connections), Saket HZ (approx. 5000 connections). Reduction of NRW to less than 15% Show less

Education

  • Institution of Engineers of India (IEI), Kolkata
    BTech - Bachelor of Technology, Civil Engineering
    2018 - 2022
  • Aryabhat Institute of technology
    Mechanical Engineering, First division
    2012 - 2015

Community

You need to have a working account to view this content. Click here to join now