Chiyoda International Corporation
-
United States
-
Construction
-
100 - 200 Employee
-
Electrical Supervisor
-
Feb 2023 - Present
-
-
-
PT PP (Persero) Tbk
-
Indonesia
-
Construction
-
700 & Above Employee
-
Lead Electrical Engineer
-
Jul 2020 - Feb 2023
- Report all construction obstacle to construction manager - Check and coordination change design as per site condition (if any) - Electrical progress report - Check and make sure all material onsite in good condition according to bill of materials and installation drawing - Ensure schedule onsite material according to the project schedule - Generate methode of work to achieve quality and work safety standards - Sign electrical work permit and ensure the risks identified and precautions considered as necessary - Manage manpower daily task to fulfill target according to the project schedule - Supervise installation underground conduits, cable raceways, cable laying, lighting system, grounding & lightning protection, control panel, MV & LV switchgears, HVAC system, Transformers, etc - Precommissioning loop check cable, Insulation resistance test, etc - Commissioning assist LV & MV Switchgear, HVAC system, Frequency converter, transformers, etc - Maintain good customer relations and team spirit at site Show less
-
-
-
PT ANTAM Tbk
-
Indonesia
-
Mining
-
700 & Above Employee
-
Project Engineer
-
Dec 2019 - Jun 2020
- Generate front end engineering design- Generate BOQ materials- Generate electrical technical specification- Generate electrical price estimation- Generate bidding documents- Check prequalification and qualification bidder
-
-
Electrical Engineer
-
Dec 2019 - Feb 2020
-
-
-
PT PP (Persero) Tbk
-
Indonesia
-
Construction
-
700 & Above Employee
-
Electrical Field Engineer
-
Mar 2016 - Sep 2019
- Project Mobile Power Plant 500MW Truck Mounted Gas Turbin Medan - Nias Area - Package 7 project MPP 100MW (Nabire, Ternate, Bontang, Flores) - GECC LOMBOK PEAKER 130-150MW - Project Mobile Power Plant 500MW Truck Mounted Gas Turbin Medan - Nias Area - Package 7 project MPP 100MW (Nabire, Ternate, Bontang, Flores) - GECC LOMBOK PEAKER 130-150MW
-
-
Education
-
Universitas Diponegoro
Bachelor's degree, Electrical and Electronics Engineering