Pradeep Patil
Industrial Engineer at Datwyler Healthcare- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Datwyler Healthcare
-
Belgium
-
Pharmaceutical Manufacturing
-
100 - 200 Employee
-
Industrial Engineer
-
Feb 2021 - Present
● Accountable for SAP Master Data for India plant. ● New material code creation: Material Master, BOM & Routing. ● Master Data maintenance. ● ECC to S/4 migration. ● Accountable for SAP Master Data for India plant. ● New material code creation: Material Master, BOM & Routing. ● Master Data maintenance. ● ECC to S/4 migration.
-
-
-
Forbes Marshall
-
India
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
Industrial Engineer
-
Jul 2014 - Feb 2021
Expansion of Krohne Marshall factory Managed to increase the capacity by 40% for three products line of flow meters. Installed 34 Assembly workstations, more than 50 racks, material handling conveyors. Layout modification for three products line & raw material store modification. Achieved 30% reduction in distance travel & 17% increase in productivity.Productivity improvement for DCEM Detailed time study and method study, layout modification, material storage and WIP racks. Process improvement using hand tools, power tools, enhanced 5S and visual management. Resulted in 21% productivity improvement. Awarded FM Star of the month & appreciated by the division Manager.Productivity Improvement : Valve Assembly Line-2 Elemental analysis based on video study conducted using WorkPro. Improvement in material handling, layout modification and process improvements. 20% increase in productivity, 33% reduction in area, material handling time reduced by 27%.ZED (Zero Effect Zero Defect) Cluster CII made cluster of 8 companies for the duration of 2 years road map. DRVME, AGIP, Logistics in Manufacturing, Star Diagram, Pancha Tattva & 5 Sense abnormality are the key leanings. Worked as a Junior Coordinator, visited several companies for cross learning.Overall Layout Modification : FM Arca Distance travel reduced from 2.5 to 1.6 Km, free space of 230 sq. m. made available, reductionin transshipments by 16%.HMC Machine for Valve Body Replacement of three machines using 5 person for the production of current volume. Bottleneck elimination for future demand. Saving of man power, space and cycle time.Other Key Responsibilities Workstation design: 50+ unique stations. Assembly tools & accessories. Ergonomics analysis and improvement: REBA, RULA. Capacity calculation and enhancement. Standard time charts. Show less
-
-
Graduate Engineering Trainee
-
Sep 2012 - Jul 2014
Production of 29 solar systems & site support. Making assembly instruction sheets for complete line. Support for thermal skid & receiver development.
-
-
-
JBM AUTO LIMITED
-
India
-
300 - 400 Employee
-
Project Trainee
-
Jul 2011 - May 2012
Press shop productivity improvement: 3.5 SPM to 4.8 SPM. Single minute of die exchange (SMED). Press shop productivity improvement: 3.5 SPM to 4.8 SPM. Single minute of die exchange (SMED).
-
-
Education
-
Vishwakarma Institute Of Technology
Master of Technology - MTech, Industrial Engineering -
Amrutvahini College of Engineering - AVCOE
Bachelor of Engineering (B.E.), Mechanical Engineering -
ASC College Chopda
Highers Secondary School Certificate, Science -
Adgaon Highschool, Adgaon
Secondary School Certificate, 79.60