Phillip Brauer

Senior Reservoir Engineer at Northern Oil and Gas Inc. (NYSE Symbol: NOG)
  • Claim this Profile
Contact Information
Languages
  • English Native or bilingual proficiency
  • Spanish Professional working proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Senior Reservoir Engineer
      • Jul 2018 - Present

      Evaluate current portfolio of over 8,000 non-operated wells in the Williston, Marcellus and Permian Basins for reserves value. Manage reserves database and maintain well forecasts. Assess drilling opportunities proposed by operating partners for economic viability. Evaluate A&D opportunities. Evaluate current portfolio of over 8,000 non-operated wells in the Williston, Marcellus and Permian Basins for reserves value. Manage reserves database and maintain well forecasts. Assess drilling opportunities proposed by operating partners for economic viability. Evaluate A&D opportunities.

    • Asset Manager
      • Oct 2017 - May 2018

      Manage operating and non-operating assets in NE PA, focused on valuation and optimization. Manage operating and non-operating assets in NE PA, focused on valuation and optimization.

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Production Applications Engineer
      • Aug 2016 - Oct 2017

      Work with customers to optimize wells through plunger management and well evaluation using nodal analysis. Developing best practices for plunger well management and mentoring engineers and operators all over the country. Work with customers to optimize wells through plunger management and well evaluation using nodal analysis. Developing best practices for plunger well management and mentoring engineers and operators all over the country.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Senior Reservoir Engineer
      • Mar 2015 - Mar 2016

      • Re-estimated reserves on 45 year old Moxa Arch, dry-gas field, reserves were increased• Evaluated horizontal infill and field expansion opportunities for marketing of field• Worked with production engineers and operators to improve field performance through plunger lift optimization; taught surveillance methods created in previous positions• Identified production improvement opportunities during reserves reviews

    • Senior Production Engineer
      • Sep 2013 - Mar 2015

      • Worked the Wattenberg horizontal shale play• Developed concept and guided the team effort to optimize long-lateral horizontal wells through choke and plunger management resulting in 5000 BOPD production increase • Used OFM (Oilfield Manager) software to create well surveillance tools and identify underperforming horizontal wells; worked with operators to remediate through plunger set point optimization• Led the “Return to Production” team to minimize vertical well downtime during horizontal well development• Designed a MIT (Mechanical Integrity Test) program for mature wells in the field• Mentored inexperienced engineers in well surveillance, rod pump and plunger lift optimization • Helped evaluate impact of drilling new horizontal wells nearby to older horizontal wells

    • Reservoir Engineer 2
      • Aug 2011 - Sep 2013

      • Reservoir Engineering for Salt Creek CO2 flood• Improved forecast accuracy for the field, thereby reducing the forecast error from 5% to 1%• Estimated reserves for CO2 and water floods• Monitored and optimized CO2 injection to maximize EOR performance• Assessed areas of field for conversion from water to CO2 flood• Conducted quarterly reviews of CO2 flood performance

    • Production Engineer 1
      • Jun 2009 - Aug 2011

      • Production Engineer for Salt Creek CO2 flood• Directed recompletion program that increased production in 90 year old oil field by almost 10%• Selected and scheduled wells for fracture stimulations• Performed well surveillance and optimization for CO2 injection and oil wells• Designed and supervised workovers for failed rod pump wells• Initiated down-time reduction program and implemented cost-cutting measures

    • Reservoir Engineering Intern
      • May 2008 - Aug 2008

      • Constructed reservoir model for simulation of a seawater flood • Lowered risk for evaluation of a billion dollar nitrogen vs. seawater flood • Constructed reservoir model for simulation of a seawater flood • Lowered risk for evaluation of a billion dollar nitrogen vs. seawater flood

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Petroleum Engineering Intern
      • May 2007 - Aug 2007

      Engineering intern working on fracture stimulation and cement treatments. Engineering intern working on fracture stimulation and cement treatments.

Education

  • University of Oklahoma
    Bachelor’s Degree, Petroleum Engineering
    2004 - 2009

Community

You need to have a working account to view this content. Click here to join now