Philip Cann

Lv3 electrical supervisor at Group Industrial UK
  • Claim this Profile
Contact Information
Location
Guisborough, England, United Kingdom, GB

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • BOSIET
    OPITO

Experience

    • United Kingdom
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Lv3 electrical supervisor
      • Aug 2022 - Present

      Responsible for a team of 3 individuals on varying tasks from construction of new cable containment right through to commissioning and testing of fully built systems, completion of risk assessments and method statements for the use of rope access techniques, dead and live testing, QA/QC and EX inspections and fault rectification, assisting with motor and belt run tests, nitrogen leak testing and instrument calibration. Mounting of equipment, gland test and termination of various instruments and motors.

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Project E&I supervisor
      • Jun 2021 - Aug 2022

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Lv3 electrical technician
      • Apr 2021 - May 2021

      Lv3 rope access supervisor for NDT activities and various electrical corrective actions during drill stop in the Derrick. Repair of MAB basket drag chain. Dolly track limit switch replacement. DROPS correctives. Lv3 rope access supervisor for NDT activities and various electrical corrective actions during drill stop in the Derrick. Repair of MAB basket drag chain. Dolly track limit switch replacement. DROPS correctives.

    • Lv3 electrical supervisor
      • Jan 2020 - Mar 2021

      Responsible for a team of 6 individuals on varying tasks from construction of new cable containment right through to commissioning and testing of fully built systems, completion of risk assessments and method statements for the use of rope access techniques, dead and live testing, QA/QC and EX inspections and fault rectification, assisting with motor and belt run tests, nitrogen leak testing and instrument calibration. Mounting of equipment, gland test and termination of various instruments and motors.

    • Lv3 rope access electrical tech / charge hand /supervisor
      • Aug 2019 - Jan 2020

      Lv2/3 Rope Access Electrical supervisor / Charge hand on various assets both manned and NUI. Writing of rope access method statements and carrying out rope access work both supervisory and at other levels when required. Completing work packs, Carrying out risk assessments, obtaining permit to works and materials, organising up to 10 individuals into various teams and tasks as well as forward planning future job scopes. Liaising with the on board REP’s on prioritising tasks and problem solving. Working on various projects throughout the north sea. Pulling dressing, glanding and termination of cables. Cable containment installation, Pre-commissioning works & commissioning and completions work, Signing off of newly installed and inspected equipment, quoting for materials bills and manpower for various projects both planned and reactive.

    • IRATA Lv2 Rope Access Electrical Technician
      • Feb 2017 - Aug 2019

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Electrical commissioning Technician
      • Jan 2016 - Feb 2017

      Electrical commissioning technician at Shetland gas plant. Creation and use of ISSOW permits. pre-commissioning and commissioning of Gas Turbine Compressors including motors control circuits lighting and small power. Insulation resistance and continuity tests. RCD and earth loop impedance testing. functional tests verification of single line and termination diagrams and equipment details. Completing Red line mark up drawings. completion of Totals ICAPS commissioning packages. EX inspection and verification of equipment.

    • United Kingdom
    • Services for Renewable Energy
    • 1 - 100 Employee
    • Lv2 IRATA Rope Access Electrical Technician
      • Oct 2016 - Dec 2016

    • Oil and Gas
    • 1 - 100 Employee
    • Rope Access Electrical Technician
      • Jun 2015 - Nov 2015

      Lv1 Rope Access Electrical Charge-hand working on complete drill package upgrade from lighting to drill tools. Carrying out risk assessments, obtaining permit to works organising individuals into various teams. Liaising with the electrical project team on prioritising tasks and problem solving. Installation of new PRS8-I service loops including dressing, glanding and termination according to technical drawings. Installation of ST120 Iron roughneck. Installation of new fingerboard racking system. Rope access installation of cable containment and cables. Banding and identifying of all newly installed cables. Various lighting additions both rope and non-rope access. Fault finding. Cable management installation.

    • Norway
    • Oil and Gas
    • 1 - 100 Employee
    • Electrical Technician
      • Oct 2014 - Jan 2015

      Day shift electrical technician on the forties bravo. Responsible for maintenence and breakdown cover on cuttings re - injection unit. Ac and dc motors and all associated controls. Fault finding and rectification. Organisation of spares. Carrying out isolations and participating in issow/apache ptw system. Day shift electrical technician on the forties bravo. Responsible for maintenence and breakdown cover on cuttings re - injection unit. Ac and dc motors and all associated controls. Fault finding and rectification. Organisation of spares. Carrying out isolations and participating in issow/apache ptw system.

    • United Kingdom
    • Real Estate
    • 1 - 100 Employee
    • IRATA lv1 Electrical Technician/Chargehand
      • Dec 2013 - Sep 2014

      Tasks included carrying out risk assessments, obtaining permit to works organising around 10 individuals into various teams and tasks as well as organising work for night shift personnel. liasing with the electical management team on prioritising tasks and problem solving. Over 1000 rope access hours logged. Working on various projects throughout the vessel. Installation of TDX 1000 top drive service loops and PRS service loops including dressing, glanding and termination. Gland and termination of derrick camera system and pipe rack controll systems according to technical drawings. Various lighting additions both rope and non rope access. Fault finding. Cable management installation.

    • IRATA lv1 Electrical Technician
      • Oct 2013 - Dec 2013

      Working on Shells Bonga FPSO in Nigeria on 28/28 rotation I carried out various rope access and non rope access electrical works.Temporary supply of power for shut-down tasks.EX inspection visual close and detailed, Ex remedial works,Non hazardous area maintenance,Replacement of damaged or upgraded machinery and instrumentation, Following technical and area classification drawings.IS wiring, modification and additions,Leading toolbox talks and actively participating in the permit to work scheme.Aiding Performing Authority in entering data into the Shell rig management system.

    • Electrical Technician
      • Sep 2002 - Nov 2013

      Industrial and commercial electrical technician. SWA work. Distribution panel terminating.good working knowledge of mounting systems. Tray, conduit, trunking and many others replacement and fault finding. Testing and inspecting. Planned preventative maintenance fault diagnosis and rectification. Installation. Decommissioning, refits revamps additions. I have sub contracted on heavy plant and petrochemical sites under permit to work schemes and in areas with special requirements.. Worked with all cable types single insulated, double insulated, fp200, pyro. Swa. Some intrinsically safe wiring and panel building work. Basic motor knowledge both single and 3 phase.

    • Electrician
      • Mar 2002 - Sep 2010

      Industrial and commercial electrician. Very experienced in SWA glanding distribution board replacements both single and 3 phase. Some pannel and motor wiring experiece. Able to work from technical drawings. Fault finding. Maintenance ppm rpm fire alarm systems 3 phase work intruder alarms. Testing and inspecting. Rewires. Renovations upgrades strip outs Industrial and commercial electrician. Very experienced in SWA glanding distribution board replacements both single and 3 phase. Some pannel and motor wiring experiece. Able to work from technical drawings. Fault finding. Maintenance ppm rpm fire alarm systems 3 phase work intruder alarms. Testing and inspecting. Rewires. Renovations upgrades strip outs

Education

  • Rope Access Man Power
    IRATA LV3, Industrial access
    2019 - 2019
  • teesside industrial solutions
    level 2, IRATA rope access
    2016 - 2016
  • mintra training
    forties field induction, gas testing, donut descent device
    2014 - 2014
  • Teesside industrial solutions
    IRATA level 1, Rope access
    2013 - 2013
  • falck nutec
    BOSIET, MIST Norwegian Skyscape, Medical, Pass
    2012 - 2012
  • Redcar & cleveland college
    City & Guilds, IEE 17th edition wiring regulations
    2006 - 2007
  • TTE
    City & guilds 2330, Electrotechnology
    2000 - 2003
  • Roxby training
    COMPEX, Units ex01 ex02 ex03 ex04
    2013 -
  • North east chamber of commerce
    Advanced electrotechnical apprenticeship, Electrical engineering
    -
  • Petrotechnics
    ISSOW LV1, Pass
    -
  • West Redcar
    GCSE, All A-C grades
    -

Community

You need to have a working account to view this content. Click here to join now