Phil Thomson
air diver at Ultra Deep Solutions- Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Gold Feature
Click to upgrade to our gold package
for the full feature experience.
Location
British Columbia, Canada, CA
Topline Score
Topline score feature will be out soon.
Bio
Generated by
Topline AI
You need to have a working account to view this content.
Join now
You need to have a working account to view this content.
Join now
Experience
-
-
air diver
-
Apr 2015 - Present
-
-
air diver
-
Jul 2015 - Sep 2015
-
-
-
-
Air Diver
-
2012 - Present
-
-
-
-
air diver
-
Apr 2016 - May 2016
-
-
air diver
-
Jan 2016 - Mar 2016
-
-
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Cinan 101 (Gulf of Mexico)Project- Install lock-nuts on 16”/20 bolt tie-in, run up nuts by hand, tighten with flogger, inspect 2 completed tie-ins, de-rig @ 101ft.Tools Used- Flogging Spanner, Hammer.Designation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Replace lock-nuts on underside of 16”/20 bolt vertical tie-in, flog up nuts on both top and bottom of flange @111ftTools Used- Flogging SpannerDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Prop clearing of tire stuck in portside prop of anchor handler Tools Used- Green RiverDesignation- Air Diver
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco SO (Gulf of Mexico)Project- Install all Hydra-Tight jacks, whips, reaction nuts on 16”/20 bolt vertical tie-in, ran up bolts on underside of flange, come up to test pressure. @ 111ft.Tools Used- Hydra-TightDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Grind doubler plate off of jacket leg. Standby drill. Tools Used- Hydraulic GrinderDesignation- Air Diver
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Cinan 101 (Gulf of Mexico)Project- Installed Hydra-Tight jacks, whips, reaction nuts for 1st 50% pass. Come up to pressure. @ 103ft.Tools Used- Hydra-TightDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Cinan 101 (Gulf of Mexico)Project- Land closing spool in preparation for drift pins, bolts and Hydra-Tight @ 101ft.Tools Used- CraneDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kruez SubseaLocation- Cinan 101 (Gulf of Mexico)Project- Visual Inspection for leaks on pig launcher. and all 4 tie-ins at this site before pressure test @ 101ft.Tools Used- NoneDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Install Blind flange and all bolts on 16”, 20 bolt flange @ 120ft Tools Used- Hydraulic ImpactDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Split 10m pup piece at flange, check rigging, attach crane, recover to surface. @100ft.Tools Used- Hydraulic Impact, Flange Splitters.Designation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Dig a 4m X 10m hole for concrete mattress under 16” pipeline. @101ft Tools Used- 10” Air LiftDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Place concrete mattress under pipeline and using 10 ton tugger, DMA, snatch block, spreader bar, De-rig @ 110ftTools Used- DMA, 10 ton barge tugger, crane, snatch block, matress frame, shackle breaker.Designation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Confirm Hydra-Tight installed correctly, identify leaks and correct, come up to pressure for 1st pass. @ 103ft.Tools Used- Hydra-TighDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Clear skillet handle that was blocking the 12 O’clock. @99ft. Tools Used- Hammer and Chisel.Designation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz subseaLocation- Sinan SO (Gulf of Mexico)Project- 16” tie-in, dress all bolts, bring in cheese at 3 and 9, re-locate DL to workbasket, set up hydraulic impact, start impacting. @134ftTools Used- Hydraulic impactDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Re-locate crane and all rigging to pipeline side of the tie-in, re-locate DL.@132ftTools Used- NoneDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Split 16” flange for AX ring installation, complete ready for installation. @101ft.Tools Used- Hydraulic Impact, Flange spreaders.Designation- Air Diver (SUR-D 02)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Jumped Hydra-Tight jacks for second 50% pass on 16” tie-in, come up to test pressure. @100ftTools Used- Hydra-TightDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Re-locate DL, Visual site survey of new project location. Tools Used- NoneDesignation- Air Diver (SUR-D 02)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Hydraulic grinding at clamp installation site @ 123ft Tools Used- Hydraulic GrinderDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Installed last 5 bolts on 16” flange tie-in, landed tool basket, removed flange catchers. @ 100ft.Tools Used- Flogging spannerDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Sinan SO (Gulf of Mexico)Project- Bring in riser clamp door using 3 ton come-a-long, install bolts. @12ft Tools Used- 3 ton come-a-long, flogging spannerDesignation- Air Diver
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz subseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Remove plug from 1⁄4 turn valve on laydown head, install diffuser on valve , replace valve handle, open valve, flood pipeline. @130ft.Tools Used- 24” pipe wrench, diffuser, adjustable spanner.Designation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Set clamp for 16” riser @44ft using come-a-long, 3 ton strop. Install and complete bolt up, de-rig all tools and equipmentTools Used- 3 ton come-a-long,3ton strop, hydraulic impact, flogging spanner. Designaton- Air Diver
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Took measurements for taught wire installation, re-locate DL. Tools Used- Tape measure,magnet,scraperDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Hydraulic grinding at clamp installation site @ 123ft Tools Used- Hydraulic GrinderDesignation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2013 - 2014 1 year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Visual site survey of jacket leg & HM @112 ft Designation- Air Diver (SUR-D O2)
-
-
Air Diver
-
2013 - 2013 less than a year , Company- Kreuz SubseaLocation- N-Belut-CPP (South China Sea)Project- Installation of 2 clampsTools Used- Hydraulic impact (42mm), flogging spanner Designation-Air Diver (40% Nitrox)
-
-
Air Diver
-
2013 - 2013 less than a year , Company- Kreuz SubseaLocation- N-Belut-CPP (South China Sea)Project- Measurement for 2m clamp placement, cleaning of sea growth on second HM from surfaceTools Used- Tape measure, scraper, magnetsDesignation- Air Diver (40% Nitrox)
-
-
Air Diver
-
2013 - 2013 less than a year , Company- Kreuz SubseaLocation- N-Belut-CPP (South China Sea)Project- Visual as-built survey Designation- Air Diver (40% Nitrox)
-
-
Air Diver
-
2013 - 2013 less than a year , Company- Kreuz SubseaLocation- N-Belut-CPP (South China Sea)Project- Installation 12 ton clamp on vertical leg, overhead crane operations, as- built surveyTools Used- Hydraulic impact (99mm), flogging spannerDesignation- Air Diver (40% Nitrox)
-
-
-
-
Air Diver
-
2014 - 2014less than a year
Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Broke out pup piece using flange spreaders, removed all bolts from 16” flange. @99ft.Tools Used- Hydraulic Impact, Flange SpreadersDesignation- Air Diver (SUR-D O2)
-
-
-
-
Air Diver
-
2013 - 2013 less than a year , Company- CDIProject-Hanging Mid Water 24” 16 Bolt Flange Tie-In and Gasket Assembly Tools Used-2 1” 1⁄2 Crescent Wrenches, 1” 1⁄2 Ratchet, 12” Spike Bar, 2 ton Come-A-Long, “C” Plate, Overhead Barge CraneVessel-SSIG Construction Barge Designation- Air Diver
-
-
Air Diver
-
2013 - 2013 less than a year , Company- CDIProject- 27” Sail Boat Inspection for future salvageTools Used- Tape Measure, Calipers Vessel- SSIG Construction Barge Designation- Air Diver
-
-
Air Diver
-
2013 - Company- CDIProject- Water Intake Installation with 42” 20 Bolt Flange UpTools Used- 1000
-
-
Air Diver
-
2013 - 2013 less than a year , Company- CDIProject- 10” PVC pipe connection using three 4-bolt Victaulic couplers Tools Used- 2 7/8” Crescent WrenchesVessel-SSIG Construction BargeDesignation- Air Diver
-
-
Air Diver
-
2013 - 2013 less than a year , Company- CDIProject- 72” HDPE Pipe to 2 10” 25 ft. Riser InspectionTools Used- Measuring Tape, Calipers Vessel- SSIG Construction Barge Designation- Air Diver
-
-
Air Diver
-
2013 - 2013 less than a year , Company- CDIProject- Anchor Point InstallationTools Used- Hydraulic Hammer Drill with 18” long 7/8” Bit Vessel- SSIG Construction BargeDesignation- Air Diver
-
-
Air Diver
-
2013 - Company- CDIProject- SUR-DO2 Deep Water Visual Inspection on 2000
-
-
Air Diver
-
2013 - 2013 less than a year , Project- Water Intake Inspection for future replacementTools Used- Tape Measure, Calipers Vessel-SSIG Construction Barge Designation- Air Diver
-
-
Air Diver
-
2013 - 2013 less than a year , Company-CDIProject- 14” Diameter Mid Water Log CutTools Used- 16” Hand Saw, 10 ft. length 3⁄4” Rope, Carabineers Vessel- SSIG Construction BargeDesignation- Air Diver
-
-
Air Diver
-
2013 - 2013 less than a year , Company- CDIProject- SUR-DO2 Deep Water Site Inspection of Possible Future Construction SiteTools Used- N/AVessel- SSIG Construction BargeDesignation- Air Diver
-
-
-
-
Air Diver
-
2013 - 2013less than a year
Company- Kreuz SubseaLocaton- N-Belut-CPP (South China Sea) Project- De-rig taught wire jig, de-rig down-line Tools Used- SpannerDesignation- Air Diver (40% Nitrox)
-
-
Education
-
Commercial Diving Institute of Canada
-
INPP
Community
You need to have a working account to view this content.
Click here to join now