Phil Thomson

air diver at Ultra Deep Solutions
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
British Columbia, Canada, CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • air diver
      • Apr 2015 - Present

    • air diver
      • Jul 2015 - Sep 2015

    • Air Diver
      • 2012 - Present

    • air diver
      • Apr 2016 - May 2016

    • air diver
      • Jan 2016 - Mar 2016

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Cinan 101 (Gulf of Mexico)Project- Install lock-nuts on 16”/20 bolt tie-in, run up nuts by hand, tighten with flogger, inspect 2 completed tie-ins, de-rig @ 101ft.Tools Used- Flogging Spanner, Hammer.Designation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Replace lock-nuts on underside of 16”/20 bolt vertical tie-in, flog up nuts on both top and bottom of flange @111ftTools Used- Flogging SpannerDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Prop clearing of tire stuck in portside prop of anchor handler Tools Used- Green RiverDesignation- Air Diver

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco SO (Gulf of Mexico)Project- Install all Hydra-Tight jacks, whips, reaction nuts on 16”/20 bolt vertical tie-in, ran up bolts on underside of flange, come up to test pressure. @ 111ft.Tools Used- Hydra-TightDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Grind doubler plate off of jacket leg. Standby drill. Tools Used- Hydraulic GrinderDesignation- Air Diver

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Cinan 101 (Gulf of Mexico)Project- Installed Hydra-Tight jacks, whips, reaction nuts for 1st 50% pass. Come up to pressure. @ 103ft.Tools Used- Hydra-TightDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Cinan 101 (Gulf of Mexico)Project- Land closing spool in preparation for drift pins, bolts and Hydra-Tight @ 101ft.Tools Used- CraneDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kruez SubseaLocation- Cinan 101 (Gulf of Mexico)Project- Visual Inspection for leaks on pig launcher. and all 4 tie-ins at this site before pressure test @ 101ft.Tools Used- NoneDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Install Blind flange and all bolts on 16”, 20 bolt flange @ 120ft Tools Used- Hydraulic ImpactDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Split 10m pup piece at flange, check rigging, attach crane, recover to surface. @100ft.Tools Used- Hydraulic Impact, Flange Splitters.Designation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Dig a 4m X 10m hole for concrete mattress under 16” pipeline. @101ft Tools Used- 10” Air LiftDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Place concrete mattress under pipeline and using 10 ton tugger, DMA, snatch block, spreader bar, De-rig @ 110ftTools Used- DMA, 10 ton barge tugger, crane, snatch block, matress frame, shackle breaker.Designation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Confirm Hydra-Tight installed correctly, identify leaks and correct, come up to pressure for 1st pass. @ 103ft.Tools Used- Hydra-TighDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Clear skillet handle that was blocking the 12 O’clock. @99ft. Tools Used- Hammer and Chisel.Designation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz subseaLocation- Sinan SO (Gulf of Mexico)Project- 16” tie-in, dress all bolts, bring in cheese at 3 and 9, re-locate DL to workbasket, set up hydraulic impact, start impacting. @134ftTools Used- Hydraulic impactDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Re-locate crane and all rigging to pipeline side of the tie-in, re-locate DL.@132ftTools Used- NoneDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Split 16” flange for AX ring installation, complete ready for installation. @101ft.Tools Used- Hydraulic Impact, Flange spreaders.Designation- Air Diver (SUR-D 02)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Jumped Hydra-Tight jacks for second 50% pass on 16” tie-in, come up to test pressure. @100ftTools Used- Hydra-TightDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Re-locate DL, Visual site survey of new project location. Tools Used- NoneDesignation- Air Diver (SUR-D 02)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Hydraulic grinding at clamp installation site @ 123ft Tools Used- Hydraulic GrinderDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Installed last 5 bolts on 16” flange tie-in, landed tool basket, removed flange catchers. @ 100ft.Tools Used- Flogging spannerDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Sinan SO (Gulf of Mexico)Project- Bring in riser clamp door using 3 ton come-a-long, install bolts. @12ft Tools Used- 3 ton come-a-long, flogging spannerDesignation- Air Diver

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz subseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Remove plug from 1⁄4 turn valve on laydown head, install diffuser on valve , replace valve handle, open valve, flood pipeline. @130ft.Tools Used- 24” pipe wrench, diffuser, adjustable spanner.Designation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Set clamp for 16” riser @44ft using come-a-long, 3 ton strop. Install and complete bolt up, de-rig all tools and equipmentTools Used- 3 ton come-a-long,3ton strop, hydraulic impact, flogging spanner. Designaton- Air Diver

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Took measurements for taught wire installation, re-locate DL. Tools Used- Tape measure,magnet,scraperDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2014 - 2014 less than a year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Hydraulic grinding at clamp installation site @ 123ft Tools Used- Hydraulic GrinderDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2013 - 2014 1 year , Company- Kreuz SubseaLocation- Litoral Tobasco (Gulf of Mexico)Project- Visual site survey of jacket leg & HM @112 ft Designation- Air Diver (SUR-D O2)

    • Air Diver
      • 2013 - 2013 less than a year , Company- Kreuz SubseaLocation- N-Belut-CPP (South China Sea)Project- Installation of 2 clampsTools Used- Hydraulic impact (42mm), flogging spanner Designation-Air Diver (40% Nitrox)

    • Air Diver
      • 2013 - 2013 less than a year , Company- Kreuz SubseaLocation- N-Belut-CPP (South China Sea)Project- Measurement for 2m clamp placement, cleaning of sea growth on second HM from surfaceTools Used- Tape measure, scraper, magnetsDesignation- Air Diver (40% Nitrox)

    • Air Diver
      • 2013 - 2013 less than a year , Company- Kreuz SubseaLocation- N-Belut-CPP (South China Sea)Project- Visual as-built survey Designation- Air Diver (40% Nitrox)

    • Air Diver
      • 2013 - 2013 less than a year , Company- Kreuz SubseaLocation- N-Belut-CPP (South China Sea)Project- Installation 12 ton clamp on vertical leg, overhead crane operations, as- built surveyTools Used- Hydraulic impact (99mm), flogging spannerDesignation- Air Diver (40% Nitrox)

    • Air Diver
      • 2014 - 2014less than a year

      Company- Kreuz SubseaLocation- Citam 101 (Gulf of Mexico)Project- Broke out pup piece using flange spreaders, removed all bolts from 16” flange. @99ft.Tools Used- Hydraulic Impact, Flange SpreadersDesignation- Air Diver (SUR-D O2)

    • Air Diver
      • 2013 - 2013 less than a year , Company- CDIProject-Hanging Mid Water 24” 16 Bolt Flange Tie-In and Gasket Assembly Tools Used-2 1” 1⁄2 Crescent Wrenches, 1” 1⁄2 Ratchet, 12” Spike Bar, 2 ton Come-A-Long, “C” Plate, Overhead Barge CraneVessel-SSIG Construction Barge Designation- Air Diver

    • Air Diver
      • 2013 - 2013 less than a year , Company- CDIProject- 27” Sail Boat Inspection for future salvageTools Used- Tape Measure, Calipers Vessel- SSIG Construction Barge Designation- Air Diver

    • Air Diver
      • 2013 - Company- CDIProject- Water Intake Installation with 42” 20 Bolt Flange UpTools Used- 1000

    • Air Diver
      • 2013 - 2013 less than a year , Company- CDIProject- 10” PVC pipe connection using three 4-bolt Victaulic couplers Tools Used- 2 7/8” Crescent WrenchesVessel-SSIG Construction BargeDesignation- Air Diver

    • Air Diver
      • 2013 - 2013 less than a year , Company- CDIProject- 72” HDPE Pipe to 2 10” 25 ft. Riser InspectionTools Used- Measuring Tape, Calipers Vessel- SSIG Construction Barge Designation- Air Diver

    • Air Diver
      • 2013 - 2013 less than a year , Company- CDIProject- Anchor Point InstallationTools Used- Hydraulic Hammer Drill with 18” long 7/8” Bit Vessel- SSIG Construction BargeDesignation- Air Diver

    • Air Diver
      • 2013 - Company- CDIProject- SUR-DO2 Deep Water Visual Inspection on 2000

    • Air Diver
      • 2013 - 2013 less than a year , Project- Water Intake Inspection for future replacementTools Used- Tape Measure, Calipers Vessel-SSIG Construction Barge Designation- Air Diver

    • Air Diver
      • 2013 - 2013 less than a year , Company-CDIProject- 14” Diameter Mid Water Log CutTools Used- 16” Hand Saw, 10 ft. length 3⁄4” Rope, Carabineers Vessel- SSIG Construction BargeDesignation- Air Diver

    • Air Diver
      • 2013 - 2013 less than a year , Company- CDIProject- SUR-DO2 Deep Water Site Inspection of Possible Future Construction SiteTools Used- N/AVessel- SSIG Construction BargeDesignation- Air Diver

    • Air Diver
      • 2013 - 2013less than a year

      Company- Kreuz SubseaLocaton- N-Belut-CPP (South China Sea) Project- De-rig taught wire jig, de-rig down-line Tools Used- SpannerDesignation- Air Diver (40% Nitrox)

Education

  • Commercial Diving Institute of Canada
    -
  • INPP
    -

Community

You need to have a working account to view this content. Click here to join now