Peter Kalota

Senior Metallurgist -Expat at Mazoon Mining
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Zambia, ZM
Languages
  • English Full professional proficiency
  • Bemba,Nyanja Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Oman
    • Mining
    • 1 - 100 Employee
    • Senior Metallurgist -Expat
      • Sep 2023 - Present

      Greenfield Copper & gold project in Yanqul in Oman. Greenfield Copper & gold project in Yanqul in Oman.

    • Mining
    • 1 - 100 Employee
    • Superitendent Technical
      • Mar 2022 - Aug 2023

      Managing all Technical functions of the Copper Concentrator and hydrometallurgical Plants. Successfully commissioned the 5,000tpd Copper Oxide Processing plant facility which consist of two Ball Mills with maximum capacity of 150tph. Worked with a team of Projects Engineers during PFDs and PIDs reviews. Successfully optimized the Copper Oxide Flotation Circuit to improve the recovery and Concentrate grade. Managing all Technical functions of the Copper Concentrator and hydrometallurgical Plants. Successfully commissioned the 5,000tpd Copper Oxide Processing plant facility which consist of two Ball Mills with maximum capacity of 150tph. Worked with a team of Projects Engineers during PFDs and PIDs reviews. Successfully optimized the Copper Oxide Flotation Circuit to improve the recovery and Concentrate grade.

    • Canada
    • Mining
    • 700 & Above Employee
    • Senior Metallurgist Optimization - Flotation & Services
      • Nov 2019 - Mar 2022

      Optimization of the three Flotation Circuits namely Oxide, Mixed and Sulphide Ores. Offering Technical support to the operations team. Optimization of flotation equipment to improve recovery and concentrate grades using latest technology such as Glencore- Jameson flotation Cells and Outotec- Concorde flotation cells Implementation of short and medium term projects in a move to optimize the process by ensuring that good concentrate grades, quality and recovery is achieved. Undertaking surveys and Mass Balancing around the flotation circuits in order to review the flowsheets and identify areas of improvements. This was done with the help of Flotation Hydrodynamic measurements to ensure that bubble size (Db),Superficial gas velocity (JG) and bubble surface area flux(Sb) are within the optimal range. Show less

    • Senior Metallurgist Optimization - Hydrometallurgy
      • Sep 2017 - Oct 2019

      Continuous Improvement on the Leach,CCDs,Solvent Extraction and Electrowinning plants. Looking at short,medium and long term projects.Technical plant support to operations,carrying out Plant investigation and various plant trials in a move to optimize the plant.

    • Process Metallurgist-Communition
      • Oct 2016 - Sep 2017

      Looking after the Crushing and Milling Circuits in the Copper Concentrator. Optimization of Gyratory Crushers,Jaw Crushers and Cone Crusher liners.Optimization of SAG,Ball Mill liners and extend the life of the liners.Ensuring that the Crushers and Mills deliver the required throughput at optimal energy efficiency.Carry out plant trials and improvements by tracking the plant parameters.

    • Plant Metallurgist -Crushing, Screening, Heap Leach, SX & EW
      • Jan 2012 - Dec 2015

      I was in charge of the Mufulira West Heap Leach Plant as Plant Metallurgist. Operated one of the biggest Heap Leach pad with a total of 3,200,000tonnes of ore stacked on the pad at 1.26%TCu and 0.86%AsCu. Monitoring and optimizing the Crushing Plant throughput from 45,000 T/Month to 60,000 T/Month. Making sure that the Leaching efficiency is improved and Solvent Extraction Plant is provided with the required copper grades in the Pregnant Leach Solution. Offering Technical Support to three solvent extraction plants and Electro winning Plants. Generating various projects/testworks in a move to optimise the process and provide support to Metallurgists. Environmental Management system implementer, Safety,Health and Quality. Show less

    • Zambia
    • Mining
    • 500 - 600 Employee
    • Process Metallurgist - Crushing, Milling ,Agitation Leach, SX & EW
      • Jan 2011 - Jan 2012

      Process Metallurgist in the Mineral processing plants, Crushing, Milling, Heap Leaching/Vat Leaching, Thickening, Solvent Extraction and Electrowinning/Electrorefining Plants. Monitoring and optimizing the Crushing, Milling, thickening, Solvent Extraction and Electrowinning circuits. Process Metallurgist in the Mineral processing plants, Crushing, Milling, Heap Leaching/Vat Leaching, Thickening, Solvent Extraction and Electrowinning/Electrorefining Plants. Monitoring and optimizing the Crushing, Milling, thickening, Solvent Extraction and Electrowinning circuits.

    • Process Metallurgist -Crushing, Milling, Agitation Leach ,SX & EW
      • Mar 2009 - Jan 2011

      Continuous improvement of the Leaching circuit, Counter Current Decantation and Electrowinning. Identifying ways of improving the Plant Recoveries. Optimization of the solvent extraction plants and ensuring that LME Grade A Finished Copper Cathodes are produced from Electrowinning Plant. Monitoring and offering Technical support to the plant personnel at all times. Offering technical support to Solvent extraction plant personnel and preforming various test works including SX reagent screening, Max loads and Extraction / Mixer efficiencies. Show less

Education

  • University of Zambia
    Bachelor of Mineral Science, Metallurgy and Mineral Processing
    2004 - 2008

Community

You need to have a working account to view this content. Click here to join now