Peter Hamlyn
Chief Operating Officer at ALVA YACHTS- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
ALVA YACHTS
-
Germany
-
Shipbuilding
-
1 - 100 Employee
-
Chief Operating Officer
-
Apr 2023 - Present
Antalya, Turkey
-
-
-
Oyster Yachts
-
United Kingdom
-
Shipbuilding
-
100 - 200 Employee
-
Chief Operating Officer
-
Feb 2021 - Mar 2023
-
-
-
Fairline Yachts
-
1 - 100 Employee
-
Operations Director
-
Dec 2018 - Jan 2021
-
-
-
Princess Yachts
-
United Kingdom
-
Maritime Transportation
-
700 & Above Employee
-
Senior Operations Manager
-
Jun 2009 - Nov 2018
Responsible for all composite manufacture and finishing at Princess Yachts. Moulding on Five sites with circa 600 employees responsible for manufacturing small mouldings, wet lay, RTM and resin infusion. All hull, deck and Flybridge Moulding and full modular assemblies. All sub components and final assembly of teak, swim platforms, deck fitment and modules. All painting of mouldings post curing and paint lacquer coatings including application of Awgrip paint systems. Technical support for… Show more Responsible for all composite manufacture and finishing at Princess Yachts. Moulding on Five sites with circa 600 employees responsible for manufacturing small mouldings, wet lay, RTM and resin infusion. All hull, deck and Flybridge Moulding and full modular assemblies. All sub components and final assembly of teak, swim platforms, deck fitment and modules. All painting of mouldings post curing and paint lacquer coatings including application of Awgrip paint systems. Technical support for oversees enquirers and all grp finishing at Princess Yachts. Show less
-
-
-
-
Site Manager - Group composite manufacture
-
2007 - 2009
Plymouth, United Kingdom Responsible for all Major Moulding construction across three sites and 300 employees. Implementation of resin infusion technology,silicone bag infusion, new advanced paint coatings and advanced composite work instructions. Final approval and sign off on all major hull construction prior to shipment.
-
-
Production Manager M Class
-
2006 - 2007
Responsible for the entire build from gelcoat application to the finished product! Moulding the 21M and 23M hull, deck and assembly and full Fit out of engineering systems, furniture fitment and final sign off on vessel prior to handover to the customer.
-
-
Production Manager Sub Assemblies
-
2004 - 2006
Plymouth, United Kingdom Accountable for all flybridge Moulding, final assembly and paint finishing prior to shipment to fit out. Three factories and 100 employees.
-
-
Production Manager Moody Yachts
-
1994 - 2004
Plymouth, United Kingdom Leading the team of multi functional trades across various sites manufacturing the Moody and Sigma range of sailing yachts from gel-coat application to commissioning. Approximately 100 Yachts per annum were produced until supporting transitioning operations over to the new manufacturing owner to focus operations solely on the Princess range of motorboats.
-
-
Joinery & Paint Shop Technical Manager
-
Jun 1992 - Jun 1994
Plymouth, United Kingdom Responsible for wood machining, joinery manufacture and paint production, including warranty and technical support UK and oversees.
-
-
-
-
Shipwright
-
Jan 1989 - Jan 1992
-
-
Education
-
Derby University
Business Management, Business Administration, Management and Operations