Peter Fairchild

Senior Electrical Engineer at Freezer Engineering LLC - We bring creative solutions
  • Claim this Profile
Contact Information
Location
Parker, Colorado, United States, US
Languages
  • English Native or bilingual proficiency
  • German Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • Senior Electrical Engineer
      • Oct 2022 - Present

      Worked on a diverse platform of electrical projects including a site condition assessment of a natural gas compressor station, ceramics manufacturing I&C and power distribution, switchgear replacement, water collection facility design and frac sand facility design. Worked on a diverse platform of electrical projects including a site condition assessment of a natural gas compressor station, ceramics manufacturing I&C and power distribution, switchgear replacement, water collection facility design and frac sand facility design.

    • United States
    • Staffing and Recruiting
    • 1 - 100 Employee
    • Suncor - Plant 1 Reliability Engineer
      • May 2022 - Sep 2022

      Attended cross functional team meetings with opperations, process engineers and other stake holders to insure plant reliability at Suncor Energy Commerce City, CO. Dutites included day to day scheduled maintenance, interaction with process controls engineers and restoration efforts. Attended cross functional team meetings with opperations, process engineers and other stake holders to insure plant reliability at Suncor Energy Commerce City, CO. Dutites included day to day scheduled maintenance, interaction with process controls engineers and restoration efforts.

    • Real Estate
    • 1 - 100 Employee
    • Contract Consultant - Electrical I&C Design
      • Mar 2021 - Dec 2021

      UL508A Panel and Wiring Design. Duties included are all aspect of panel design. Specification of the main panel, deadfront assembly and backplate assembly. Also include, developing I/O wiring diagrams from P&IDs and executing the layout through the use of AutoCAD. UL508A Panel and Wiring Design. Duties included are all aspect of panel design. Specification of the main panel, deadfront assembly and backplate assembly. Also include, developing I/O wiring diagrams from P&IDs and executing the layout through the use of AutoCAD.

    • United States
    • Telecommunications
    • Application Engineer
      • Mar 2019 - Oct 2020
    • Retail Apparel and Fashion
    • 1 - 100 Employee
    • Staff Electrical Engineer (EI&C)
      • Oct 2017 - Mar 2019

      Worked with a team of electrical engineers in a multi-disciplined water and waste water environment. Duties included: -Instrumentation and control specification -Collaborate with civil, mechanical and environmental engineers throughout the office -Collaborate with vendors and clients to ensure products are of the highest standard while meeting client's budgets -Project lead on Metro Water Reclamation District lighting project. Complete retrofit of an existing 130 mgd plant Worked with a team of electrical engineers in a multi-disciplined water and waste water environment. Duties included: -Instrumentation and control specification -Collaborate with civil, mechanical and environmental engineers throughout the office -Collaborate with vendors and clients to ensure products are of the highest standard while meeting client's budgets -Project lead on Metro Water Reclamation District lighting project. Complete retrofit of an existing 130 mgd plant

    • United Kingdom
    • Human Resources
    • Project Manager
      • May 2017 - Sep 2017

      Managed projects so that they were delivered on time and under budget. Directed field teams to prioritize and complete work. Technical liaison between field crews and general contractors. Access Control systems, building networking, BDA, Audio, CCTV. Managed projects so that they were delivered on time and under budget. Directed field teams to prioritize and complete work. Technical liaison between field crews and general contractors. Access Control systems, building networking, BDA, Audio, CCTV.

    • United States
    • Utilities
    • 1 - 100 Employee
    • Project Coordinator
      • Jan 2017 - May 2017
    • United States
    • Utilities
    • 400 - 500 Employee
    • Engineer Trainee
      • Jun 2015 - Aug 2015

      Utilized ETAP Electrical Engineering Software to provide time/current coordination between safety critical load centers and their associated protective devices.  Conducted load flow and coordination studies for non-safety related transformer replacement. Collaborated with systems engineers to provide electrical train specification to non-specified Motor Operated Valves and their physical locations within the power block. Utilized ETAP Electrical Engineering Software to provide time/current coordination between safety critical load centers and their associated protective devices.  Conducted load flow and coordination studies for non-safety related transformer replacement. Collaborated with systems engineers to provide electrical train specification to non-specified Motor Operated Valves and their physical locations within the power block.

    • Electronic Technician
      • Aug 2013 - Aug 2014

      Repaired and assembled electronic aerospace controllers per IPC-610-A standards. Tested electronic assemblies per written procedures and drawings to see projects through to the end. Repaired and assembled electronic aerospace controllers per IPC-610-A standards. Tested electronic assemblies per written procedures and drawings to see projects through to the end.

    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • Shop Technician
      • Feb 2011 - Aug 2011

      Mechanic experience, Cleaning and reseting bridge plug setting tools, maintaining trucks, Hydraulic work on pulling unit mast trucks. Mechanic experience, Cleaning and reseting bridge plug setting tools, maintaining trucks, Hydraulic work on pulling unit mast trucks.

    • Carpet Cleaning Technician (Manager)
      • May 2007 - Aug 2011

      Scheduled meetings with customers and ensured that business was carried out effectively. Maintained equipment. Made cold calls to potential customers. Scheduled meetings with customers and ensured that business was carried out effectively. Maintained equipment. Made cold calls to potential customers.

Education

  • Kansas State University
    Bachelor of Science, Electrical Engineering Power Transmission and Distribution
    2011 - 2016
  • 2011 California Wind Tech
    Wind Turbine Technician, Graduate with honors
  • Chanute High School

Community

You need to have a working account to view this content. Click here to join now