Peter Campbell
Site/Project Manager at Land and Power Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Alasdair Macniven
Happy to recommend Peter Campbell - he was the determining factor in successfully progressing the planning, mobilisation, construction management and commissioning of the 20MW Nevendon battery storage project. His hard work, commitment and application of his extensive project's experience were instrumental to the success of the project against a challenging programme and resourced constrained project environment.
Alasdair Macniven
Happy to recommend Peter Campbell - he was the determining factor in successfully progressing the planning, mobilisation, construction management and commissioning of the 20MW Nevendon battery storage project. His hard work, commitment and application of his extensive project's experience were instrumental to the success of the project against a challenging programme and resourced constrained project environment.
Alasdair Macniven
Happy to recommend Peter Campbell - he was the determining factor in successfully progressing the planning, mobilisation, construction management and commissioning of the 20MW Nevendon battery storage project. His hard work, commitment and application of his extensive project's experience were instrumental to the success of the project against a challenging programme and resourced constrained project environment.
Alasdair Macniven
Happy to recommend Peter Campbell - he was the determining factor in successfully progressing the planning, mobilisation, construction management and commissioning of the 20MW Nevendon battery storage project. His hard work, commitment and application of his extensive project's experience were instrumental to the success of the project against a challenging programme and resourced constrained project environment.
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
Level 6 Diploma in Construction Contracting Operations Management
CITBMar, 2017- Sep, 2024
Experience
-
Land and Power Ltd
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
Site/Project Manager
-
Aug 2022 - Present
-
-
-
Statera Energy
-
United Kingdom
-
Services for Renewable Energy
-
1 - 100 Employee
-
Site / Construction Manager with Statera Energy
-
Dec 2021 - Jul 2022
-
-
-
Arun Construction Services Limited
-
United Kingdom
-
Renewables & Environment
-
1 - 100 Employee
-
Site Manager
-
Jan 2021 - Jun 2022
Key Stake holders include~ Client: EDF-RE Principle Designer: Pivot Power Principle Contractor; ARUN Construction Services HV Switchgear & control: Burnell Lithium Battery: Wartsila Gridsolv system REDOX Battery: Invinity National Grid Contractor: GTDS 33/132kV Key Stake holders include~ Client: EDF-RE Principle Designer: Pivot Power Principle Contractor; ARUN Construction Services HV Switchgear & control: Burnell Lithium Battery: Wartsila Gridsolv system REDOX Battery: Invinity National Grid Contractor: GTDS 33/132kV
-
-
-
HBS Group Southern
-
United Kingdom
-
Specialty Trade Contractors
-
1 - 100 Employee
-
Site Manager
-
Mar 2020 - Oct 2020
-
-
-
-
Building Manager, NAPIT full scope
-
Mar 2019 - Mar 2020
Building Manager & initial HMO Lisencee to apply LACoRS 2008 standards inc. enforcement, & improvements through L&T Act Section20 including CAD drawings & tender documents Building Manager & initial HMO Lisencee to apply LACoRS 2008 standards inc. enforcement, & improvements through L&T Act Section20 including CAD drawings & tender documents
-
-
-
BELECTRIC UK
-
United Kingdom
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Site Manager
-
Aug 2017 - Sep 2018
10 MVA - 7.1 MWh Enhanced Frequency Response Battery Storage Project: Assisted PM with Pre-construction CDM documentation & minor contracts procurement for Temporary Works inc Lifting Plans; then Site manager for Site setup and Construction phase 10 MVA - 7.1 MWh Enhanced Frequency Response Battery Storage Project: Assisted PM with Pre-construction CDM documentation & minor contracts procurement for Temporary Works inc Lifting Plans; then Site manager for Site setup and Construction phase
-
-
-
ARUN Construction Services
-
United Kingdom
-
Renewables & Environment
-
1 - 100 Employee
-
Project Manager (Solar)
-
Jan 2016 - May 2017
PV Solar Farm: Site management inc program delivery, H&S, Documentation Completion, PAC PV Commercial roof-top: Survey, Project Design (PVsol) & Build Management, Site Management PV Solar Farm: Site management inc program delivery, H&S, Documentation Completion, PAC PV Commercial roof-top: Survey, Project Design (PVsol) & Build Management, Site Management
-
-
-
Carillion
-
United Kingdom
-
Facilities Services
-
700 & Above Employee
-
Engineering Project Manager
-
May 2015 - Jan 2016
Project Manager, as part of the Delivery team for West Sussex County Council; covering project planning (inc G59 applications), management and QC for various commercial Solar PV projects inc PPA 5MW Park, rooftop installations up to 200kWp and G83 social-housing packages. Project Manager, as part of the Delivery team for West Sussex County Council; covering project planning (inc G59 applications), management and QC for various commercial Solar PV projects inc PPA 5MW Park, rooftop installations up to 200kWp and G83 social-housing packages.
-
-
-
Wingate Electrical Plc
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Solar-Farm testing supervisor
-
Jan 2012 - May 2015
Acting as senior electrician, supervising various aspects of the installation phase as required. Testing supervisor- faultfinding and rectification, QC, compiling and documenting results. Central and local inverter installations - 65MW Inc: PAC IV testing / site inspections and reporting (SolarCentury) Acting as senior electrician, supervising various aspects of the installation phase as required. Testing supervisor- faultfinding and rectification, QC, compiling and documenting results. Central and local inverter installations - 65MW Inc: PAC IV testing / site inspections and reporting (SolarCentury)
-
-
-
-
Director
-
Nov 2011 - Apr 2015
Acting MCS Duty Holder and Qualified Supervisor NICEIC, 7671 NICIEC Sub-contracting the installation,test and commissioning of PV systems. Including: Spirit Solar..............Acting Senior Electrician.............Domestic & Commercial PV systems Icarus Electrical.....Test and Inspection Electrician...Domestic & Commercial 7671 Belectric UK............Commercial Electrician Crownhouse Technologies....Heathrow T2 Acting MCS Duty Holder and Qualified Supervisor NICEIC, 7671 NICIEC Sub-contracting the installation,test and commissioning of PV systems. Including: Spirit Solar..............Acting Senior Electrician.............Domestic & Commercial PV systems Icarus Electrical.....Test and Inspection Electrician...Domestic & Commercial 7671 Belectric UK............Commercial Electrician Crownhouse Technologies....Heathrow T2
-
-
-
-
Operations manager
-
Jun 2011 - Oct 2011
I helped set up this company acting as MCS Qualified Supervisor NAPIT and operations manager I helped set up this company acting as MCS Qualified Supervisor NAPIT and operations manager
-
-
-
Luminii Energy
-
Renewables & Environment
-
Qualified supervisor
-
Nov 2010 - Jun 2011
I helped set up this company acting as the MCS Qualified Supervisor NICEIC. I helped set up this company acting as the MCS Qualified Supervisor NICEIC.
-
-
-
Solar UK
-
United Kingdom
-
Renewable Energy Power Generation
-
1 - 100 Employee
-
Lead installer (solar thermal)
-
Mar 2008 - Nov 2010
Installing domestic and commercial solar thermal systems nationwide Installing domestic and commercial solar thermal systems nationwide
-
-
-
-
Project Design Manager - Westminster Bridge Underpass
-
Mar 1996 - Jul 1996
Project manager & draughtsman, from tender through design to acquisition & logistics. The underpass extended the Southern Embankment, from the Royal Festival Hall, westwards to St.Thomas Hospital. Under the ramp to the bridge itself, there were two long-defunct storm-drains (approx. 20ft dia), through which J.Murphy & Sons, cast a concrete tunnel connecting the easterly & westerly footpaths. Cornish granite was used to clad the structure to match the existing stonework. Project manager & draughtsman, from tender through design to acquisition & logistics. The underpass extended the Southern Embankment, from the Royal Festival Hall, westwards to St.Thomas Hospital. Under the ramp to the bridge itself, there were two long-defunct storm-drains (approx. 20ft dia), through which J.Murphy & Sons, cast a concrete tunnel connecting the easterly & westerly footpaths. Cornish granite was used to clad the structure to match the existing stonework.
-
-
-
-
contract design draughtsman/site-foreman
-
1986 - 1994
Architectural Sculptors were a small company of stone masons. I was offered a position because of my drawing board skills and engineering background. The director, Gareth Hughes was the last trained master-mason from Westminster Abbey. Somewhat of a career change at the time, and enjoyed my contract there thoroughly, working on ecclesiastic and heritage buildings in and around London. Seeing a project through from concept to completion I find one of the most rewarding aspects of life. Architectural Sculptors were a small company of stone masons. I was offered a position because of my drawing board skills and engineering background. The director, Gareth Hughes was the last trained master-mason from Westminster Abbey. Somewhat of a career change at the time, and enjoyed my contract there thoroughly, working on ecclesiastic and heritage buildings in and around London. Seeing a project through from concept to completion I find one of the most rewarding aspects of life.
-
-
-
self trading
-
United Kingdom
-
Wholesale
-
1 - 100 Employee
-
contract electrician
-
1980 - 1986
Installing electro-hydraulic reprocessing plant mainly sited in Wharfs along side the River Thames. Refurbished Harris shears and bailers with bespoke control-panel design and new German machinery (such as Lindermann) introducing the din rail modular system to Britain. Installing electro-hydraulic reprocessing plant mainly sited in Wharfs along side the River Thames. Refurbished Harris shears and bailers with bespoke control-panel design and new German machinery (such as Lindermann) introducing the din rail modular system to Britain.
-
-
-
Babcock Power
-
United States
-
Oil and Gas
-
300 - 400 Employee
-
apprentice
-
1978 - 1980
ITB technicians apprenticeship with Babcock and Wilcox, the UK's then primary design and build contractor of power station boiler and heat exchange assembly for the UK's power generation grid including nuclear. ITB technicians apprenticeship with Babcock and Wilcox, the UK's then primary design and build contractor of power station boiler and heat exchange assembly for the UK's power generation grid including nuclear.
-
-
Education
-
Catford Boys
Design & technology, A -
Sandhurst