Peter Brawley
Retired at ADIL- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
French -
Topline Score
Bio
Experience
-
ADIL
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
Retired
-
Mar 2020 - Present
-
-
Senior Consultant
-
Apr 2016 - Present
I am responsible for leading a team of engineers providing operations and projects consultancy support to clients.
-
-
Operations and Improvements Manager
-
Feb 2015 - Apr 2016
I was responsible for leading the Operations team within ADIL. This involved working with clients to solve their operations problems and providing manpower where necessary. I also took part in a number of due diligence reviews, working with clients on potential acquisitions. This involved assessing the operations status and plans of existing operators and advising clients on their strengths and weaknesses.
-
-
Head of Field Developments
-
May 2014 - Feb 2015
I was responsible for planning and coordinating oil and gas developments for clients. This included working with clients to develop budgets and schedules and then organizing teams to deliver the projects.
-
-
-
bp
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Hook-up & Export Systems Mgr
-
2010 - Apr 2014
The Clair Ridge Project is the largest offshore project in the UKCS for many years. It involves the construction of two new bridge-linked platforms in the Clair field with an overall topsides weight of 55,000t. In this post I managed the planning of the offshore Hook-up, the delivery of the brownfield work on Clair Phase 1 platform, the subsea pipeline work and modifications at Sullom Voe.
-
-
Facilities Project Manager, Clair Ridge Project
-
2008 - 2010
I kicked off the concept selection phase of the Clair Ridge Project, pulled together the concept selection team and managed the concept selection and pre-FEED work. I also led the tendering of the topsides fabrication contract.
-
-
Projects Manager
-
2007 - 2008
I was responsible for coordinating the drilling programmes on both fields, planning modifications on the Magnus platform to extend field life by 20 years and managing the Clair Ridge Project.
-
-
Deepwater Projects Mgr
-
2005 - 2007
BP operates the only two deepwater FPSOs in the UKCS, Schiehallion & Foinaven. I was responsible for all the projects in the fields, including the infill drilling programmes, subsea projects and topsides projects.
-
-
Farragon Project Manager
-
2003 - 2005
The Farragon Project was a 2 well subsea tie-back to the Andrew platform. I was responsible for the project from the discovery of the field through to first oil, which was 30 months after discovery.
-
-
Bruce Field Operations Mgr
-
2000 - 2003
The Bruce platform was one of the largest gas producers in the UKCS, with a capacity of over 200 mboed and a POB of 160. I was responsible for all aspects of the operation, including management of the offshore and onshore operations teams and of the drilling team. During my time in the post I improved the safety performance and production efficiency of the field. I also managed a complete overhaul of the offshore and onshore management structures to reduce costs and increase accountability. Show less
-
-
Bruce Booster Compression Project Mgr
-
1998 - 2000
I managed the retrofit of 3 compressors to the Bruce platform.
-
-
Deputy Project Mgr, Bruce Phase II Project
-
1996 - 1998
I was Deputy PM for a new platform bridge-linked to Bruce and a subsea development.
-
-
Development Engineer
-
1993 - 1996
Worked on developments in the Southern North Sea.
-
-
Safety Engineer
-
1992 - 1993
Developed the Safety Case for the Clyde Platform
-
-
Development Engineer
-
1989 - 1992
Worked on LNG development schemes
-
-
Development Engineer
-
1988 - 1989
Worked on the development of the first oil/gas field in Papua New Guinea
-
-
-
bp
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Development Engineer
-
1985 - 1987
Part of a BP team monitoring Woodside during the development of the North West Shelf Project Part of a BP team monitoring Woodside during the development of the North West Shelf Project
-
-
-
bp
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Commissioning Engineer
-
1983 - 1984
Commissioning offshore platforms in the Arabian Gulf. Commissioning offshore platforms in the Arabian Gulf.
-
-
-
bp
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Process Engineer
-
1981 - 1982
Design of process schemes for offshore platforms and onshore reception terminals. Design of process schemes for offshore platforms and onshore reception terminals.
-
-
-
bp
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Operations Engineer
-
1979 - 1980
Operations engineer in Llandarcy Refinery Operations engineer in Llandarcy Refinery
-
-
Education
-
University of Bradford
Bachelor's degree, Chemical Engineering -
University of Bradford
Bachelor's degree, Chemical Engineering