Peter Brawley

Retired at ADIL
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Aberdeen Area, UK
Languages
  • French -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Retired
      • Mar 2020 - Present

    • Senior Consultant
      • Apr 2016 - Present

      I am responsible for leading a team of engineers providing operations and projects consultancy support to clients.

    • Operations and Improvements Manager
      • Feb 2015 - Apr 2016

      I was responsible for leading the Operations team within ADIL. This involved working with clients to solve their operations problems and providing manpower where necessary. I also took part in a number of due diligence reviews, working with clients on potential acquisitions. This involved assessing the operations status and plans of existing operators and advising clients on their strengths and weaknesses.

    • Head of Field Developments
      • May 2014 - Feb 2015

      I was responsible for planning and coordinating oil and gas developments for clients. This included working with clients to develop budgets and schedules and then organizing teams to deliver the projects.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Hook-up & Export Systems Mgr
      • 2010 - Apr 2014

      The Clair Ridge Project is the largest offshore project in the UKCS for many years. It involves the construction of two new bridge-linked platforms in the Clair field with an overall topsides weight of 55,000t. In this post I managed the planning of the offshore Hook-up, the delivery of the brownfield work on Clair Phase 1 platform, the subsea pipeline work and modifications at Sullom Voe.

    • Facilities Project Manager, Clair Ridge Project
      • 2008 - 2010

      I kicked off the concept selection phase of the Clair Ridge Project, pulled together the concept selection team and managed the concept selection and pre-FEED work. I also led the tendering of the topsides fabrication contract.

    • Projects Manager
      • 2007 - 2008

      I was responsible for coordinating the drilling programmes on both fields, planning modifications on the Magnus platform to extend field life by 20 years and managing the Clair Ridge Project.

    • Deepwater Projects Mgr
      • 2005 - 2007

      BP operates the only two deepwater FPSOs in the UKCS, Schiehallion & Foinaven. I was responsible for all the projects in the fields, including the infill drilling programmes, subsea projects and topsides projects.

    • Farragon Project Manager
      • 2003 - 2005

      The Farragon Project was a 2 well subsea tie-back to the Andrew platform. I was responsible for the project from the discovery of the field through to first oil, which was 30 months after discovery.

    • Bruce Field Operations Mgr
      • 2000 - 2003

      The Bruce platform was one of the largest gas producers in the UKCS, with a capacity of over 200 mboed and a POB of 160. I was responsible for all aspects of the operation, including management of the offshore and onshore operations teams and of the drilling team. During my time in the post I improved the safety performance and production efficiency of the field. I also managed a complete overhaul of the offshore and onshore management structures to reduce costs and increase accountability. Show less

    • Bruce Booster Compression Project Mgr
      • 1998 - 2000

      I managed the retrofit of 3 compressors to the Bruce platform.

    • Deputy Project Mgr, Bruce Phase II Project
      • 1996 - 1998

      I was Deputy PM for a new platform bridge-linked to Bruce and a subsea development.

    • Development Engineer
      • 1993 - 1996

      Worked on developments in the Southern North Sea.

    • Safety Engineer
      • 1992 - 1993

      Developed the Safety Case for the Clyde Platform

    • Development Engineer
      • 1989 - 1992

      Worked on LNG development schemes

    • Development Engineer
      • 1988 - 1989

      Worked on the development of the first oil/gas field in Papua New Guinea

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Development Engineer
      • 1985 - 1987

      Part of a BP team monitoring Woodside during the development of the North West Shelf Project Part of a BP team monitoring Woodside during the development of the North West Shelf Project

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Commissioning Engineer
      • 1983 - 1984

      Commissioning offshore platforms in the Arabian Gulf. Commissioning offshore platforms in the Arabian Gulf.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Process Engineer
      • 1981 - 1982

      Design of process schemes for offshore platforms and onshore reception terminals. Design of process schemes for offshore platforms and onshore reception terminals.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Operations Engineer
      • 1979 - 1980

      Operations engineer in Llandarcy Refinery Operations engineer in Llandarcy Refinery

Education

  • University of Bradford
    Bachelor's degree, Chemical Engineering
    1975 - 1979
  • University of Bradford
    Bachelor's degree, Chemical Engineering
    1975 - 1979

Community

You need to have a working account to view this content. Click here to join now