Per Morten Lefdal

Senior project manager at Metier OEC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Oslo, Oslo, Norway, NO

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Conny Larsson

Per Morten has done a tremendous job as a project leader for the, very demanding, Ichthys project. I give him my best recommendations.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Norway
    • Business Consulting and Services
    • 1 - 100 Employee
    • Senior project manager
      • Mar 2011 - Present

      2011 - present Metier OEC2022/6-PresentProject manager for a new production line and for a yield increasing upgrade of two different Omega-3 product. Client Aker BioMarine. 2021/11-2022/5 Prooject manager for a new diagnostic production facility. Client Thermo Fischer2021/4 - 11Project manager, business development for a new Li-ion gigafactory (Battery plant). Client: Freyr 2020/11 - 2021/4Project manager for a concept study - parking arrangement to the new hospital in Drammen. Client: Vestre Viken Hospital Trust2018/11-2020/11Project manager -Designed, installed, and started up the world’s first plant converting 20' tpy of plastic waste into oil by a combined pyrolysis-, catalytic- and distillation technology. Client: Quantafuel2017/05 – 2018/11Project manager - Designed, installed, and started up multiple aseptic dairy lines at TINE, Brumunddal. Client: Skala2016/03 – 2017/03 Project manager - Developed a concept and installed a pilot that reduced product loses in the dairies. Developed an instrument for in-line measurement of %fat, %protein and %dry matter in the dairy product. Client: TINE2015/10 – 2016/03 Project manager - Developed a concept for a new gouda-cheese plant at TINE Storsteinnes. Client: TINE2015/07- 2015/10 Project manager - Audited a green field dairy plant in Bergen. Client: TINE2015/03-present Project manager – Installed and started up a natural gas terminal located at the Red Sea, Egypt. Client: Hoegh LNG2013/06-2015/03 Project manager - Engineered and built a ballast system to Samsung for their Ichthys CPF project. Client: Eureka Pumps AS2012/10-2013/05 Project manager – Feasibility study - compared supplies of electric power and district heating to Longyearbyen by coal-, gas- and diesel fired power plants with facilities to capture CO2.Audited the coal fired power plant in Longyearbyen. Client: Bydrift KF2012/01-09 Topside manager - A Pre-FEED study for a LNG FPSO (boat) with a 50.000 t topside. Client: Hoegh LNG

    • Project Development Manager
      • 1999 - 2011

      2002-2011 Project Development Manager - Developed different waste-to-energy projects in Norway, Germany, Italy, Spain and Bulgaria base on a unique gasification and plasma process. The work included engineering, cost, risk, profitability, cash flow, financing and application for concession.2007-2009 .Project Manager - Developed and promoted a fully automated dosing system for coke and pitch for the green field aluminum smelters in Taishet and Boguchany, Russia. Both projects were stopped due to the financial crisis. Client: Rusal1999-2001 Project Manager - Designed, installed and commissioned a turnkey waste-to-energy plant. Client: Borge Garveri.1999 Co-founded EnviroArc together with 4 colleges from Kværner (Aker Solution). The foundation was based on: an agreement with Kværner to acquire all knowhow and proprietary rights, 3 investors investing € 2,5 million, a contract with the first customer and a license agreement with ScanArc AB, the owner of the technology.

    • Senior Project Manager
      • 1992 - 1999

      1997-1999 Project Manager - Developed the Thyssen and Borge waste-to-energy projects in Düsseldorf and Osterøy (near Bergen) respectively. 1992-1997 Project Manager - Designed and developed the Kværner Hydrogen and Carbon Black process. The process produced carbon black and hydrogen from oil or natural gas by a plasma operating system. It was the biggest development project at that time within the Kværner Group. 1997-1999 Project Manager - Developed the Thyssen and Borge waste-to-energy projects in Düsseldorf and Osterøy (near Bergen) respectively. 1992-1997 Project Manager - Designed and developed the Kværner Hydrogen and Carbon Black process. The process produced carbon black and hydrogen from oil or natural gas by a plasma operating system. It was the biggest development project at that time within the Kværner Group.

    • Founder and Manager
      • 1990 - 1992

      Developed a new and innovative temperature measuring system that measured the liquidus temperature in the aluminum smelter. The work was financed by Hydro Aluminum. The company was established in partnership with H-invent AS. Developed a new and innovative temperature measuring system that measured the liquidus temperature in the aluminum smelter. The work was financed by Hydro Aluminum. The company was established in partnership with H-invent AS.

    • Engineer
      • Apr 1986 - Mar 1990

      Developed, built and tested a pilot for a new and innovative energy recovery system for Hydro Aluminum. The system recovered heat from the electrolysers. Developed, built and tested a pilot for a new and innovative energy recovery system for Hydro Aluminum. The system recovered heat from the electrolysers.

Education

  • Norges teknisk-naturvitenskapelige universitet (NTNU)
    Master in Mechanical engineering
    1981 - 1986
  • Handelshøyskolen BI
    Business Candidate
    -
  • Handelshøyskolen BI
    Business Candidate
    -

Community

You need to have a working account to view this content. Click here to join now