Peng Wen Guo

R&D manager for main control at DEIF Wind Power Technology
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Shanghai, China, CN
Languages
  • English Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Denmark
    • Appliances, Electrical, and Electronics Manufacturing
    • 300 - 400 Employee
    • R&D manager for main control
      • Oct 2008 - Present

      • Main control application development: new prototype code developing, simulation code developing, FAT, SAT(IDE: Eclipse CDT) • Power management program development: active power regulation, reactive power regulation, signal transmission to electric power dispatching center(IDE: codesys) • Main control system design: electrical circuit design and components selection. • Old projects maintenance: add some new functions, or bug handling. • New employee training: • Management work: task allocation, routine management. In the past years, some projects were involved: • Dong Fang steam Fu Xin project, 2.5MW double-feed wind turbine main control application development, FAT, SAT(prototype) • Dong Fang steam Yun Tai Shan project, 1.5MW double-feed wind turbine main control application development, FAT, SAT(prototype) • Dong Fang steam Yun Tai Shan project, power management system application development and commissioning. • Dong Fang steam retrofit project, 1.5MW double-feed wind turbine main control application development. • Dong Fang steam Huo Lin He project, 2.0MW double-feed wind turbine main control application development, FAT, SAT(prototype) • Commissioning for Dong Fang generator 2.5 MW direct-drive wind turbine (prototype) • Dong Fang steam 1.5 MW double-feed wind turbine project, main control system commissioning for Hua Neng Mao Ming Wind Park. • Dong Fang steam 1.5 MW double-feed wind turbine project, commissioning for Hua Neng Da He Xi Wind Park. • Dong Fang steam 1.5 MW double-feed wind turbine project, Gan Su Chang Ma CECEP (Hong Kong construction) Wind Park. Commissioning for main control system, Wind Park monitoring system (SCADA), Wind Park information transmission system, Wind Park Power management system, Wind power grid connection test, LVRT test, etc. Show less

    • Site service engineer
      • May 2005 - May 2008

      • Configure protection logic, parameter, i/o (software:DIGSI) • SCADA configuration(software:wincc) • FAT • SAT • Customer training • hotline • Configure protection logic, parameter, i/o (software:DIGSI) • SCADA configuration(software:wincc) • FAT • SAT • Customer training • hotline

Education

  • Nanjing Normal University
    Industrial electric automation
    1997 - 2000

Community

You need to have a working account to view this content. Click here to join now