Pedro Vásquez
Engineering Safety Instrumented System (SIS) Engineer at ObjectWin Technology- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Spanish Native or bilingual proficiency
-
English Professional working proficiency
Topline Score
Bio
Credentials
-
Functional Safety Enginner Certification
RisknowlogyOct, 2015- Nov, 2024
Experience
-
ObjectWin Technology
-
United States
-
Staffing and Recruiting
-
400 - 500 Employee
-
Engineering Safety Instrumented System (SIS) Engineer
-
Feb 2020 - Present
• Provide technical leadership for SIS and instrumentation • Responsible for assessing, designing, configuring, installing, and testing SIS systems to upgrade refinery heaters, boilers, compressors, and related equipment • Focus on Functional Safety and Safety Lifecycle requirements per ISA S84 and IEC 61508/61511 SIS standards • Develop and review SIF lists, SRSs, SIL calculations, cause-and-effect matrices, Functional Safety Plans, FAT procedures, integrated FAT (iFAT) procedures, and SAT procedures • Use Safety Lifecycle Tool (SLM) to document Safety Lifecycle information • Perform and document gap assessments by comparing current designs and configurations against SIS standards • Review engineering documents related to instrumentation and SIS configuration modifications, including P&IDs, process flow diagrams, equipment layout, cable routing, BPCS and SIS architectures, PLC program, and cabinet arrangements • Prepare specifications and plans • Follow the AMP Project Quality Assurance Process • Perform cost calculations and assist with compiling budget estimates Show less
-
-
-
Statistics & Control, Inc.
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Functional Safety Engineer
-
Oct 2018 - Feb 2020
• Provide technical leadership for SIS and instrumentation. • Responsible for assessing, designing, configuring, installing, and testing SIS systems to upgrade refinery heaters, boilers, compressors, and related equipment. • Focus on Functional Safety and Safety Lifecycle requirements per ISA S84 and IEC 61508/61511 SIS standards. • Develop and review SIF lists, SRSs, SIL calculations, cause-and-effect matrices, Functional Safety Plans, FAT procedures, integrated FAT (iFAT) procedures, and SAT procedures. • Use Safety Lifecycle Tool (SLM) to document Safety Lifecycle information. • Perform and document gap assessments by comparing current designs and configurations against SIS standards. • Review engineering documents related to instrumentation and SIS configuration modifications, including P&IDs, process flow diagrams, equipment layout, cable routing, BPCS and SIS architectures, PLC program, and cabinet arrangements. • Prepare specifications and plans. • Follow the AMP Project Quality Assurance Process. • Perform cost calculations and assist with compiling budget estimates. Show less
-
-
-
External Adviser
-
Quito, Ecuador
-
Freelance
-
Nov 2016 - Oct 2018
• Provided advisory and consulting services for research work, degree work, thesis, and essays. • Provided private classes and advanced Excel courses. • Provided maintenance and construction services in electricity industry. • Provided advisory and consulting services for research work, degree work, thesis, and essays. • Provided private classes and advanced Excel courses. • Provided maintenance and construction services in electricity industry.
-
-
-
Venprecar / Orinoco Iron / IBH
-
Mining
-
200 - 300 Employee
-
Electrical & Instrumentation General Superintendent
-
Aug 2003 - Nov 2016
Electrical & Instrumentation General Superintendent for a Hot Reduced Briquetting Iron Plant with more than 11,700 BPCS and 563 SIF I/O, 6,000 instruments (flow, pressure, level, temperature, density, vibration, analyzers), 1,000 control valves, 8 belt scales, 5 dosing belt feeders, 400 low- and medium-voltage motors, 26 main and secondary transformers, one 115 kV substation, 7 switchgears, 19 MCCs, 5 substations, and 70 frequency drives among other equipment• Responsible for leading 41 instrument workers and electricians .• Prepared and executed the E&I Preventive, Predictive, and Detective Maintenance Plan.• Coordinated corrective maintenance for E&I.• Developed the yearly expense budget for department.• Developed a specification for spare parts in the warehouse.• Prepared E&I maintenance procedures.• Evaluated personnel.• Determined failure mode effects.• Established key performance indicators. Show less
-
-
Instrumentation Superintendent
-
Nov 2000 - Jul 2003
Instrumentation Superintendent• Responsible for leading 22 instrument workers and supervisors .• Prepared and executed the instrumentation and control Preventive Maintenance Plan.• Coordinated corrective maintenance for instrumentation and control system.• Prepared the yearly budget and specification for spare parts in the warehouse.• Prepared instrument maintenance procedures.• Evaluated personnel.• Determining failure mode effects.
-
-
-
Servicios Administrativos Tamacuari
-
Puerto Ordaz, Bolivar State - Venezuela
-
Electric Coordinator
-
Oct 1997 - Sep 2000
Responsible for coordinating detailed electrical and instrumentation engineering, construction, commissioning, and start-up of a 2.0 metric tons per year of Hot Reduced Briquetting Iron Plant (Orinoco Iron) • Supported HAZOP and LOPA Studies in E&I. • Coordinated loop checks, FATs, SATs, and plant performance tests. Responsible for coordinating detailed electrical and instrumentation engineering, construction, commissioning, and start-up of a 2.0 metric tons per year of Hot Reduced Briquetting Iron Plant (Orinoco Iron) • Supported HAZOP and LOPA Studies in E&I. • Coordinated loop checks, FATs, SATs, and plant performance tests.
-
-
-
Operacion Planta de Pellas
-
Puerto Ordaz, Bolivar State - Venezuela
-
Instrumentation Superintendent
-
Feb 1995 - Oct 1997
Instrumentation Superintendent • Responsible for leading a 17 instrument workers and supervisors. • Prepared and executed the instrumentation Preventive Maintenance Plan. • Coordinated corrective maintenance for instrumentation. • Prepared the yearly budget for instrumentation and a specification for spare parts in the warehouse. • Prepared instrument maintenance procedures. • Evaluated personnel. Instrumentation Superintendent • Responsible for leading a 17 instrument workers and supervisors. • Prepared and executed the instrumentation Preventive Maintenance Plan. • Coordinated corrective maintenance for instrumentation. • Prepared the yearly budget for instrumentation and a specification for spare parts in the warehouse. • Prepared instrument maintenance procedures. • Evaluated personnel.
-
-
-
C.V.G. Bauxilum C.A.
-
Venezuela
-
Mining
-
100 - 200 Employee
-
Instrument Engineer
-
Jan 1987 - Jan 1995
Instrument Engineer • Reviewed conceptual engineering. • Performed basic and detailed engineering, construction, commissioning, and start-up for automation projects. • Specified and selected instruments and performed control valves sizing for capital projects. • Developed instrument drawing, including assigning loop names, instrument indices, cable schedules, P&IDs, instrument hook-ups, loop diagrams, wiring diagrams, instrument locations, and cable tray and conduit routing. • Prepared cost estimates, unit price analyses, budgets, valuations, project planning, and programming. Show less
-
-