Paulus Kristiadi
Non-Pressure Part and Rotating equipment Engineer at PT. Tiga Pilar Energi- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PT. Tiga Pilar Energi
-
Indonesia
-
Construction
-
1 - 100 Employee
-
Non-Pressure Part and Rotating equipment Engineer
-
Jan 2023 - Present
Responsible for Flue Gas Duct Installation, and all equipment Flue Gas Desulphurization and Feed Water
-
-
Piping Engineer
-
Jul 2022 - Jan 2023
Responsible for piping installation PLTGU Muara Tawar, Bekasi city, Block 4, Common Piperack and HRSG.
-
-
-
PT. Tiga Pilar Energi
-
Oil and Gas
-
1 - 100 Employee
-
Mechanical Engineer
-
Apr 2022 - Jul 2022
TAMBAK LORO PROJECT Responsible for collecting Reconciliation Data TAMBAK LORO PROJECT Responsible for collecting Reconciliation Data
-
-
-
PT. Taihei Dengyo Indonesia
-
Construction
-
1 - 100 Employee
-
Mechanical Engineer
-
Mar 2021 - Apr 2022
PLTU PAITON UNIT 3 (815MW) OUTAGE PROJECT PLTGU SURALAYA UNIT 7 OUTAGE RE-TUBING SECONDARY SUPER HEATER PLTU PAITON UNIT 8 (600MW) OUTAGE PROJECT PT. TANJUNG ENIM LESTARI PALEMBANG NEW LOWER COOKING HEATER & MC D0 PUMP INSTALLATION PLTU PAITON UNIT 7 (600MW) OUTAGE PROJECT PLTU PAITON UNIT 3 (815MW) OUTAGE PROJECT PLTGU SURALAYA UNIT 7 OUTAGE RE-TUBING SECONDARY SUPER HEATER PLTU PAITON UNIT 8 (600MW) OUTAGE PROJECT PT. TANJUNG ENIM LESTARI PALEMBANG NEW LOWER COOKING HEATER & MC D0 PUMP INSTALLATION PLTU PAITON UNIT 7 (600MW) OUTAGE PROJECT
-
-
-
PT. Tiga Pilar Energi
-
Oil and Gas
-
1 - 100 Employee
-
Junior Ducting Engineer
-
Feb 2020 - Feb 2021
Pt. Tiga Pilar Energi, under Black and Veatch, Responsible for Ducting Unit #2 include Material Request, Planning, Monitoring, and Reporting, also PIC for Soap Leak Test, ECC walkdown, and Punch list Killing.
-
-
Junior Piping Engineer
-
Sep 2019 - Feb 2020
-
-
Education
-
Universitas Kristen Petra
Sarjana Desain - SDs, Animation, Interactive Technology, Video Graphics and Special Effects