Paulo Gonçalves

Asset Management - Site Manager at Exus Management Partners
  • Claim this Profile
Contact Information
Location
Coimbra, Coimbra, Portugal, PT
Languages
  • Português Full professional proficiency
  • Inglês Professional working proficiency
  • Francês Professional working proficiency
  • Espanhol Professional working proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Spain
    • Services for Renewable Energy
    • 100 - 200 Employee
    • Asset Management - Site Manager
      • May 2023 - Present

      - Daily performance monitoring of WTG´s in Scada systems;- Coordination of O&M ativities in WTG´s and Substations;- Contact with service suppliers for the installations;- Periodic Technical visits to the wind turbines and installations;- O&M job audits;PE Serra da Cabreira - 10x Enercon E70PE Candal-Coelheira - 20x Enercon E70PE Enerfer - 4x Siemens Gamesa G87PE Pisco - 8x Siemens Gamesa G97 + 17 Siemens Gamesa G114PE Cova da Serpe II - 9× Vestas V100 + 3 Vestas V90 Show less

    • Asset Management - Site Manager
      • Feb 2022 - May 2023

      - Daily performance monitoring of WTG´s in Scada systems;- Coordination of O&M ativities in WTG´s and Substations;- Contact with service suppliers for the installations;- Periodic Technical visits to the wind turbines and installations;- O&M job audits;PE Tocha II - 9x Siemens Gamesa SG136PE Maunça - 10x Senvion MM92PE Penacova - 13x Senvion 3XMPE Vigia - 8x Senvion 3XMPE Sincelo - 22x Vestas V117PE Serra da Cabreira - 10x Enercon E70PE Candal-Coelheira - 20x Enercon E70PE Enerfer - 4x Siemens Gamesa G87PE Pisco - 8x Siemens Gamesa G97 + 17 Siemens Gamesa G114PE Cova da Serpe II - 9× Vestas V100 + 3 Vestas V90 Show less

    • Denmark
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Service Technician
      • Sep 2011 - Feb 2022

      - Technical troubleshooting on electrical, mechanical and hydraulic systems - Operation and maintenance of Vestas wind turbines V47 650KW V52 850KW V80 2MW V90 2MW/3MW V100 1.8MW - Operation and maitenance of Multibrand wind turbines GE 2.X 2.5MW Suzlon S88 2.1MW - Major components replacement works; - Technical troubleshooting on electrical, mechanical and hydraulic systems - Operation and maintenance of Vestas wind turbines V47 650KW V52 850KW V80 2MW V90 2MW/3MW V100 1.8MW - Operation and maitenance of Multibrand wind turbines GE 2.X 2.5MW Suzlon S88 2.1MW - Major components replacement works;

    • Portugal
    • Investment Management
    • 500 - 600 Employee
    • Eletrical Engineer
      • Apr 2010 - Aug 2011

      - Management of operation and maintenance of TMN mobile network stations; - Site Quality inspections; - Management of operation and maintenance of TMN mobile network stations; - Site Quality inspections;

    • Renewables & Environment
    • 1 - 100 Employee
    • Comissioning Engineer
      • Sep 2007 - Apr 2010

      - Comissioning of wind turbines, Alstom ECO74, ECO80 and Suzlon S88 - Electrical works in wind turbines, Alstom ECO74, Suzlon S88 and Nordex N90 - Comissioning of wind turbines, Alstom ECO74, ECO80 and Suzlon S88 - Electrical works in wind turbines, Alstom ECO74, Suzlon S88 and Nordex N90

Education

  • Instituto Superior de Engenharia de Coimbra
    Licenciatura Bolonha - Engenharia Electrotécnica, Sistemas de Energia
  • Escola Secundária de Penacova
    Técnico de Informática, Informática

Community

You need to have a working account to view this content. Click here to join now