Paul Serban
SCADA MANAGER at EPTCON Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Italian Full professional proficiency
-
Romanian Native or bilingual proficiency
Topline Score
Bio
Experience
-
EPTCON Ltd.
-
Canada
-
Construction
-
1 - 100 Employee
-
SCADA MANAGER
-
Jul 2019 - Present
-
-
SCADA SPECIALIST
-
Jul 2014 - Jul 2019
SCADA testing and commissioning for Hydro One 230/500Kv substationsConfigured, commissioning and troubleshooting SCADA systems to monitor and control wind farms and solar farms plants.
-
-
-
Amec Foster Wheeler
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
SCADA and SYSTEM INTEGRATION
-
Aug 2004 - Apr 2014
Configured, commissioning and troubleshooting SCADA systems to monitor and control wind farms and solar farms plants across large geographical areas (through various communication protocols, Ethernet/serial and Wireless Radio/Cellular networks) using Wonderware ArchestrA, Historian, InTouch HMI, Historian, SCADAlarm and Microsoft SQL Reports. Simulation and testing of control logic and loops and error correction.Simulation and testing of control logic and loops and error correction.System set-up & participation in Factory Acceptance Test (FAT) for Teleprotection systems.Design, testing and commissioning for SCADA systems, communication and telemetry between several substation and BC Hydro Control Centre, as a part of system upgrade for 2010 Winter Olympic Games. (British Columbia, Canada).Design, testing and commissioning for SCADA and HMI control, protection and control, communication and telemetry with Hydro and IESO, LAN and WAN communication, wired and wireless communication for various wind power projects - Port Alma, Kincardine, Erie Shores, etc. (Ontario, Canada)Grounding design using CDEGS platform for the Horizon oilsands project in Alberta, the Kincardine wind farm, a 230kV Greenfield energy centre transmission line and the McCully gasfield project in New Brunswick, etc. Grounding studies using CDEGS platform (induced voltage in pipelines, induced voltage effects on low voltage distribution lines, etc) for the Kearl Oilsands Project in Alberta, the Sithe Southdown Power Plant Project, the Wolfe Island Wind Farm Project, etc.
-
-
-
Mitsubishi Power Europe
-
United Kingdom
-
Oil and Gas
-
300 - 400 Employee
-
Commissioning Engineer
-
Sep 1998 - Apr 1999
El Siuf Substation, Alexandria, Egypt: Protection and control commissioning 220/66/11 kV substation.
-
-
-
Ansaldo Industria S P A
-
United States
-
Civil Engineering
-
1 - 100 Employee
-
Planning Engineer
-
Jan 1996 - Jan 1998
El-Kureimat Power Plant, Egypt: IT Engineer/Cost Control & Planning/Site Procedure Engineer
-
-
-
-
Electrical C&I Supervisor
-
Jan 1991 - Jan 1995
Cernavoda Nuclear Power Plant, Romania: As-Built Assistant Manager and subsequently Electrical C&I Supervisor.
-
-
-
-
Electrical Engineer
-
Jan 1986 - Jan 1990
Tulcea Shipyard Romania: Maintenance Electrical Engineer
-
-
Education
-
University POLITEHNICA of Bucharest
B.Sc, Electrical Engineering