Paul O'Kane

Senior Engineer at Spencer Group
  • Claim this Profile
Contact Information
Location
United Kingdom, UK

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Dan Newton

My first contract of 2013 came from Paul which I was extremely pleased to be offered as Paul is very particular in engineer selection. A hassle free manager and a sound guy to work for.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Kingdom
    • Staffing and Recruiting
    • 1 - 100 Employee
    • Senior Engineer
      • Aug 2021 - Present

      Simultaneously involved in managing site engineering at the following schemes:

    • Senior engineer
      • Jan 2021 - Aug 2021

      Senior engineerAssociated British Ports (ABP), the port authority at Immingham and Hull, construct a Border Control Post (BCP) at each location.

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Senior Engineer
      • Feb 2019 - Sep 2020
    • United Kingdom
    • 1 - 100 Employee
    • Construction Manager
      • Feb 2018 - Feb 2019

      Modernisation of London Bridge Station Modernisation of London Bridge Station

    • Senior Engineer
      • Feb 2016 - Jul 2017

      New biomass handling facility, in the Port of Tyne New biomass handling facility, in the Port of Tyne

    • Senior Engineer
      • Nov 2014 - Dec 2015

      Construction of two new Train Stations, with parking facilities Construction of two new Train Stations, with parking facilities

    • Senior Engineer
      • Nov 2013 - Jan 2014

    • Senior Engineer
      • Jan 2012 - Dec 2013

      New Biomass Road to Rail loading facility. P&P have Supplied two engineers, each with a full one man robotic leica total station, to this challenging project. The works have included surveying, setting out, supervision of the following: 300m long access road, 50m high slip form silo, a 250m long conveyor loader and approximately 2500m of new track and associated ducting and drainage.

    • Facilities Services
    • 1 - 100 Employee
    • engineer / package manager
      • 2007 - 2008
    • United Kingdom
    • Construction
    • 300 - 400 Employee
    • engineer
      • 2007 - 2008
    • United Kingdom
    • 1 - 100 Employee
    • engineer
      • 2003 - 2004
    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • engineer
      • 2002 - 2003
    • Construction
    • 1 - 100 Employee
    • Engineer
      • 1995 - 2002

Education

  • stockport college
    hnc, construction management
    1995 - 1999
  • Barlow RC High

Community

You need to have a working account to view this content. Click here to join now