Paul Levandowski

Senior Piping Designer at Optimized Process Designs
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Katy, Texas, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Oil and Gas
    • 200 - 300 Employee
    • Senior Piping Designer
      • Nov 2017 - Present

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Sr. Project Design Coordinator
      • Apr 2017 - Nov 2017

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Sr. Piping Designer
      • Apr 2016 - Apr 2017

      Piping design for chemical plants/refineries, which includes designing and drawing equipment layouts, piping models, piping plans, sections, details, isometrics, skid layouts, bill of materials, safety equipment layouts and area classification layouts. Periodically take trips to the field sites to meet with Project Managers and walk through projects to check on their progress. Piping design for chemical plants/refineries, which includes designing and drawing equipment layouts, piping models, piping plans, sections, details, isometrics, skid layouts, bill of materials, safety equipment layouts and area classification layouts. Periodically take trips to the field sites to meet with Project Managers and walk through projects to check on their progress.

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Sr. Project Design Coordinator
      • Apr 2013 - Apr 2016

      Lead and design onshore and offshore piping projects, which includes designing and drawing equipment layouts, piping models, piping plans, sections, details, isometrics, skid layouts, bill of materials, safety equipment layouts and area classification layouts. Responsible for keeping the project on schedule. Works closely with the project manager and proactively ensures that all necessary and appropriate drawings are received in time to build everything needed for fabrication of the piping. Periodically take trips to the fabrication yards and field sites to meet with Project Managers and walk through projects to check on their progress. Show less

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Sr. Piping Designer Coordinator
      • Feb 2001 - Apr 2013

      Lead and design offshore piping projects, which includes designing and drawing equipment layouts, process and instrument diagrams, piping models, piping plans, sections, details, isometrics, skid layouts, bill of materials, pipe support details and locations, safety equipment layouts, area classifications and safety flow diagrams. Responsible for keeping the project on schedule. Worked closely with the fabrication yard and proactively ensured that all necessary and appropriate drawings are received in time to build everything needed for fabrication of the piping. Periodically took trips to the fabrication yard to meet with Project Managers and walk through projects to check on their progress. Show less

    • Sr. Piping Designer
      • Mar 1991 - Feb 2001

Education

  • Horn Drafting and CAD Center
    CADWorx Pipe Modeling
    2002 - 2002
  • ITT Technical Institute
    Associate's degree, Computer Aided Drafting
    1988 - 1990

Community

You need to have a working account to view this content. Click here to join now