Paul Hicks

Manufacturing Supervisor at AZTECH CONTROLS
  • Claim this Profile
Contact Information
Location
San Tan Valley, Arizona, United States, US

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Marcos Fabian-Ortiz

Hi Paul, I wrote this recommendation of your work that you can include on your profile. Thanks, Marcos

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Semiconductor Manufacturing
    • 1 - 100 Employee
    • Manufacturing Supervisor
      • Jul 2017 - Present

    • Manufacturing Supervisor
      • Jul 2017 - Aug 2020

      • Produce Interface Plates for the semiconductor world mainly Intel, with emphasis on Quality and on-time delivery.• Created work schedules for the manufacturing department to set weekly priorities and goals.• Make company decision with multiple employees I supervise on daily basis.• Coach/develop and provide feedback to employees and address their issues, to ensure true engagement within the team.• To analyze procedures and recommend /implement measures to improve production methods, equipment performance, quality of product and implement changes to increase efficiency of department or work crew.• To maintain a high level of morale and team-work on the production floor through frequent communication with employees to keep them informed of any new products and/or procedures, and to listen to employee concerns.• Played key role in MRP integration with process flow, and implementation.• Created weekly efficiency reports for department.• Established Multiple Lean, Six Sigma, and Kaizen events.

    • United States
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Operation Coordinator/Sr.
      • Sep 2020 - Mar 2021

      • Assign tasks to staff members. • Supervise staff to ensure tasks are completed per production schedule. • Ensure staff follows all safety requirements related to their positions. • Evaluate staff performance and provide coaching/training where necessary. • Resolve workplace disputes / issues. • Track daily production line totals and create daily reports for manager.• Position is guided by Operations Department and program objectives.• Assists with the development and implementation of department/company initiatives. • Assists with resolving unique problems that are complex in nature. • Frequent customer interaction. • Notifies operations management of production line problems.

    • Manufacturing Supervisor
      • Mar 2010 - Jul 2017

      • Control all materials in a 5S environment on multiple welding lines running different projects.• Work with planners and purchasers to make sure inventory levels stay lean and efficient.• Created work schedules for the manufacturing department and leading multiple employees on daily job duties.• Control multiple “Kanban” areas of consumables to make sure they hold their proper levels of stock and order when necessary.• Played key role in MRP integration with process flow, and implementation.• Created weekly efficient reports for department.• Contributed to Multiple Lean, Six Sigma, and Kaizen events.

    • Machinery Manufacturing
    • 1 - 100 Employee
    • Fabricator
      • Feb 2008 - Dec 2008

      • Led small team by delegating specific tasks on 3rd Shift • Manufacture large industrial clothes dryers for major company like Maytag and Whirlpool• Worked with blue prints to assemble machines to meet company specs • Led small team by delegating specific tasks on 3rd Shift • Manufacture large industrial clothes dryers for major company like Maytag and Whirlpool• Worked with blue prints to assemble machines to meet company specs

    • Panama
    • Construction
    • Presetter technician
      • Jun 2006 - Sep 2007

      • Assembled Presetter machines for various companies around the world under ISO 9001:2000.• Prepared workflow line and Work Instructions with engineers for new product line.• Had to do some troubleshooting and re-engineering to make the best piece of equipment for the customer. • Assembled Presetter machines for various companies around the world under ISO 9001:2000.• Prepared workflow line and Work Instructions with engineers for new product line.• Had to do some troubleshooting and re-engineering to make the best piece of equipment for the customer.

    • United States
    • Wholesale
    • 1 - 100 Employee
    • Plastics technician
      • May 2002 - Jun 2006

      • Fabricate plastic medical supplies by injection weld, gluing, and tacking with heat guns.• Multiple tasks around the shop, to include cutting with high powered table saws, Band saw, chamfering with routers, running various CNC machines, and manual lathe. • Fabricate plastic medical supplies by injection weld, gluing, and tacking with heat guns.• Multiple tasks around the shop, to include cutting with high powered table saws, Band saw, chamfering with routers, running various CNC machines, and manual lathe.

    • United States
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Assembly Technician
      • Oct 2000 - Mar 2002

      Re-manufactured and assembled semiconductor machine by disassembling and replacing all the seals, bearings, and o-rings. Assembled parts in a clean room environment, and did routine maintenance around the shop. Worked on cut table saw, Band saw, Eztrak, drill press, punch press, and manual lathes. Re-manufactured and assembled semiconductor machine by disassembling and replacing all the seals, bearings, and o-rings. Assembled parts in a clean room environment, and did routine maintenance around the shop. Worked on cut table saw, Band saw, Eztrak, drill press, punch press, and manual lathes.

Education

  • ITT Technical Institute-Phoenix
    Associate degree applied sciences, Architectural Drafting and Architectural CAD/CADD
    1996 - 1998

Community

You need to have a working account to view this content. Click here to join now