Paul Donnino
Project & Marine Superintendent at Thalle Construction Company, Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Thalle Construction Company, Inc.
-
United States
-
Construction
-
100 - 200 Employee
-
Project & Marine Superintendent
-
Jul 2022 - Present
Thalle-SAK Joint Venture The Project components of the second phase include the raw water intake, a gravity intake tunnel, a maintenance facility, a pump station, and a transmission tunnel. The intake consists of two lake-tap risers that connect to the gravity intake tunnel, which will convey water from the lake taps to the pump station. The 9,000-foot-long intake tunnel has a 10-foot excavated diameter and concrete liner at depths of 100–400 feet. The pump station will have an ultimate capacity of 145 million gallons per day with up to 10 pumps. It incorporates a 300-foot-deep wet well shaft that connects to an underground suction chamber with six well shafts. Another shaft connects the pump station to the transmission tunnel. The transmission tunnel is 2,600 feet long, with an excavated diameter of 10 feet and a steel liner. It connects to an existing transmission main via a retrieval shaft on the other side of the lake. The maintenance facility comprises a building and a chemical feed pipeline. The latter, which was installed via horizontal directional drilling, connects to the lake taps. Show less
-
-
-
Kiewit
-
United States
-
Construction
-
700 & Above Employee
-
Marine Structures Superintendent
-
Dec 2018 - Jun 2022
The project consists of the extension of the Southport Turning Notch to the west to create new cargo berthing area. The first portion of this project included creation of approximately 16 acres of new mangroves on undeveloped Port Everglades property that was deeded to the State of Florida in exchange for an 8-acre portion of existing conservation easement needed for berth expansion. The second portion of the project includes the marine infrastructure associated with the extension of the Southport Turning Notch by approximately 1,420 feet to the west, with wharf construction, marine and utility infrastructure, and environmental mitigation. The project also consists of the landside infrastructure improvements to support the acquisition of up to six additional Super Post-Panamax gantry cranes in Southport along Berths 31 and 32 as well as Berth 30. Additionally, the project will include extending the existing 100' gauge crane rails along Berth 30, westward to the limits of the new Southport Turning Notch Extension. Show less
-
-
-
Flatiron Construction
-
United States
-
Construction
-
700 & Above Employee
-
Superintendent
-
Apr 2018 - Oct 2018
Subcontractor Superintendent on the East Loop 820 project Subcontractor Superintendent on the East Loop 820 project
-
-
-
Granite Construction
-
United States
-
Construction
-
700 & Above Employee
-
Structures Superintendent
-
Jan 2017 - Mar 2018
Sub-structures Superintendent US I-59/I-20 Bridge Replacement Project
-
-
Structures Superintendent
-
Apr 2014 - Dec 2016
Drill Shaft Superintendent for Segments 1, 2, & 4 for I-35E Express AGL Joint Venture
-
-
Concrete Plant & Paving Superintendent
-
Jul 2012 - Mar 2014
Concrete Paving, Concrete and Cement Stabilized Base Plant Superintendent for 13.1 miles of the Chisholm Trail Parkway Section 6 (FM 1187 to U.S. 67)
-
-
Project Superintendent
-
Mar 2010 - Jun 2012
Project Superintendent- completed Epoxy overlay paving and opened the new US 82 Bridge and the demolition of the old Benjamin G. Humphreys Bridge over the Mississippi River.
-
-
Marine Structures Superintendent
-
Aug 2007 - Mar 2010
Responsibilities included marine drill shafts, footings, and concrete bridge girder erection.
-
-
Marine Structures Superintendent
-
May 2006 - Aug 2007
Responsibilities: setting pre cast bent caps and concrete bridge girders including 5 piece 360 foot Haunch Girder shipping span.
-
-
-
Granite Construction
-
United States
-
Construction
-
700 & Above Employee
-
Concrete Plant Superintendent
-
Aug 1993 - Jan 2000
Design, production and delivery of over 1 million cy's of concrete.
-
-
Field Engineer
-
Jul 1990 - Aug 1993
Responsibilities Road Header excavation, material extraction, and deposal.
-
-
Field Engineer
-
Nov 1988 - Jul 1990
Responsibilities; Installation and removal of temporary excavation support for Multi level Subway Station.
-
-
Schedule Engineer
-
Jul 1987 - Nov 1988
Project Schedule Engineer
-
-
Education
-
Minnesota State University, Mankato
Bachelor of Science - BS, Business Administration and Construction Management