Pattarapong Kottapat
Field Engineer at Sapura Energy (Thailand) Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Thai Native or bilingual proficiency
Topline Score
Bio
Experience
-
Sapura Energy (Thailand) Limited
-
Thailand
-
Oil and Gas
-
1 - 100 Employee
-
Field Engineer
-
Nov 2020 - Present
Client : Chevron Thailand Exploration and Production LimitedProject: 2021 Campaign PH 59 PF , PL Installation and PF Decommissioning 1. General - Prepared generic procedure such a anchor handling - Prepared inspection check list of start up head, Laydown Head, PIG- Prepared bolt tensioning procedure- Prepared anchor pattern - Prepared mooring function test procedure- Prepared main work barge operating procedure - Carried out offshore site survey to confirm WCR of removal PF and lifting point condition - Completed site survey report - Attended meeting with client - Coordinated with engineering team - Prepared summary weather limitation of each scope - Lead the meeting and take minute of meeting - Recording and tracking lesson learnt.- Prepared scope of work (SOW) for vender /sub-contractor- Prepared TBE (Technical Bidders Evaluation)- Issued TC (Technical Clarification) to vender when the design changed or need further information- Sourcing local vender- Reviewed and discussed with vender / subcontractor for scope of work and proposal- Prepared proposal of scab casing removal- Prepared CWE for summary all the direct cost and indirect cost propose client- Coordinate with vessel 's captain for marine issue (sample : location to drop anchor , available equipment onboard vessel).- Coordinated with fabrication yard to check surplus materials and fabricate installation aid- Prepared installation aid list2. PF removal (Fixed PF Decommissioning) - Carried out site survey at offshore platform3. Pipelay (New Installation) - Prepared constructability review - Prepared anchor pattern of pipelaying - Designed rigging arrangement of crossing sleeper - Prepared pipelay procedure- Take off the rigging list for pipelaying scope- Simulation of dummy spool to firing line (welding station , tensioner)- Prepared half catenary for PL start-up and laydown4. PF installation (Reused PF)
-
-
-
REPCO NEX Industrial Solutions
-
Thailand
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Piping Supervisor
-
Aug 2020 - Oct 2020
• Witness welder qualification test• Incharged modular fabrication and installation at plant site• Prepared installation procedure for underground piping system• Incharged piping fabrication and installation both underground piping and aboveground piping system• Coordinated with engineering team to clear the scope of work and specification• Controlled sub-contractor to provide progress meet milestone without any injury• Reviewed lifting plant for pipe spool lifting at site• Prepared weld history sheet• Prepared hydro testing package• Incharged piping system flushing scope• Reviewed as-built report for underground piping
-
-
-
-
Owner
-
Oct 2019 - Aug 2020
• Installed air-condition 9000 BTU – 36000 BTU wall type fixed speed and inverter type• Installed inside and outside unit • Hand over air-condition to customer• Cleaning air-condition 9000 – 36000 BTU wall type and split type• Solved the problem air-condition and change spare part sun as temperature sensor, capacitor• Checked refrigerant R22, R32 and R410 compare with electric current following name plate• Prepared marketing plan to find more customer• Checked tool and equipment before mob to service • Housekeeping working area after finished job• Explained customer for the problem• Be honest to customer never lie and cheating
-
-
-
Mermaid Subsea Services (Thailand) Ltd
-
Thailand
-
Oil and Gas
-
100 - 200 Employee
-
Subsea Installation Field Engineer
-
Aug 2019 - Oct 2019
6" Manuli Hose Replacement Project (From MOPU to SPM ; FPSO)Client : Krisenergy Thailand (Wassana Field Thailand)Vessel : DSV POSH MallardResponsibility :• Prepared list of materials and consumable for carry out project both offshore and onshore• Prepared materials ship loose and sea fastening materials• Prepared deck layout plan• Cooperated with engineering contractor to complete Manuli hose installation analysis• Coordinated with engineering contractor to complete sea fastening analysis of RDU with hose reel• Loadout and sea fastening reel drive system (RDU; 500 MT capacity)• Loadout and sea fastening hose reel onto RDU• Prepared 6”NS Manuli hose installation procedure• Prepared installation storyboard• Lasied client for clear scope of work and complete procedure and documentation • Issued daily progress • Controlled the job to follow project specification and master schedule• Mob / De-mob vessel• Prepared final document and completion certificate• Participated on safety observation onboardPROJECT: MOPU UWILD (DSV)CLIENT: KRISENERGY• Cooperate with 3.4U inspector to complete the job• Coordinated with the client about the daily plan• Prepared inspection tool and cleaning equipment • Prepared the drawing for final report
-
-
-
CUEL Limited
-
Thailand
-
Oil and Gas
-
300 - 400 Employee
-
Offshore Installation Engineer
-
Aug 2014 - Jun 2019
PROJECT: FORMUSA I TP OFFSHORE WIND TURBINE FABRICATIONCLIENT: Jan De NulResponsibility: • In charged for load out activity• Prepared barge manifest and carry out materials to quay side • Cooperated with the client for pre-commissioning TP to mono pile• Follow up fabrication workPROJECT: SUBSEA INSTALLATION (DSV)CLIENT: CHEVRON THAILANDResponsibility: • Prepared list of installation aid and spare materials support DSV, DLB and ISV vessel• Prepared materials for refurbishment installation aids• Prepared hydro test procedure of subsea pipeline• Carried out CCU re-certificate each campaign• Prepared load out list of pipeline haul barge, platform and DSV materials barge• Prepared load out check list before sail away the barge• Prepared installation procedure for Subsea equipment, riser, riser clamp and Subsea Tie-in spool• Prepared ITP for tie-in spool installation / tubing replacement• Involved HAZID review for pipeline and platform transportation and BBS system• Carried out vessel Mob / De-mob• Prepared PTW for work onboard DSV and 500 m operating platform• Prepared action plan to work onboard DSV materials barge• Prepared lifting analysis of subsea tie-in spool and riser• Prepared completion certificate for job completion• Prepared material back load list• Performed metrology spool of subsea tie-in• Visual and check length of spool before start welding scope to ensure spool correct length.PROJECT: SUBSEA INSTALLATION (DSV)CLIENT: CARIGALI-PTTEPI OPERATING Co., Sdn Bhd (CPOC) Responsibility: • Prepared dive plan.• Prepared action plan.• Performed metrology spool of subsea tie-in installation.• Prepared lifting plan and calculation (By STAAD Pro program) for subsea tie-in spool.• Prepared risk assessment for subsea tie-in scope.• Prepared site memo for completion scope.• Witness and involved ROV as found, ROV as-left and ROV as built.• Witness and involved subsea pipeline flooding and pigging.• Prepared completion certificate
-
-
-
PTT Maintenance and Engineering Co.,Ltd. (PTTME)
-
Thailand
-
Oil and Gas
-
100 - 200 Employee
-
Piping Engineer
-
Jun 2013 - Aug 2014
- Reviewed piping installation method statement.- Controlled progress with sub-contractor.- Expedited fabrication and installation progress with sub-contractor.- Line up actual piping system compare P&ID also isometric drawing.- Designed additional line (Not critical) such as additional utility station line.- Witness and inspected pipeline pigging and air blow out.- Prepared package for N2 dry out.- Swing blind for cut section from existing system to tie-in new piping line to existing system.- Take off materials for support pre-commissioning and commissioning scope.- Supported commissioning team to do first product.
-
-
-
CUEL Limited
-
Thailand
-
Oil and Gas
-
300 - 400 Employee
-
Offshore Installation Engineer
-
Jun 2012 - May 2013
- Prepared list of installation aid and spare materials support DSV, DLB and ISV vessl.- Prepared materials for refurbishment installation aids.- Prepared hydro test procedure of subsea pipeline.- Carried out CCU re-certificate each campaign.- Prepared installation aid refurbishment procedure and criteria.- Prepared load out list of pipeline haul barge , platform and DSV materials barge.- Prepared load out check list before sail away the barge.- Prepared installation procedure for Subsea equipment, riser, riser clamp and Subsea Tie-in spool.- Prepared ITP.- Involved HAZID review and BBS system.- Carried out vessel Mob / Demob.- Prepared PTW for work onboard DSV and 500 m operating platform.- Prepared action plan to work onboard DSV materials barge.- Prepared lifting analysis of subsea tie-in spool and riser.- Prepared completion certificate for job completion.- Coordinated with LQ radio before enter 500 m zone of operating platform.
-
-
-
Nippon Steel & Sumikin Engineering Co., Ltd.
-
Japan
-
Oil and Gas
-
200 - 300 Employee
-
Offshore Installation Engineer
-
Jun 2011 - May 2012
- Prepared installation procedure of platform.- Prepared lifting calculation for Deck and jacket installation.- Prepared Lifting Analysis report of Jacket and Deck.- Prepared Lifting Chart of Deck and Jacket.- Controlled rigging equipment (Sling, Shackle).- Analyzed Pipeline laying in case static laying. - Prepared offshore transportation drawing of Deck, Jacket, piles, etc . - Prepared Jacket Lifting Drawings.- Prepared Deck Lifting Drawings.- Checked Lifting Clearance between over stern side of DLB and objects.- Liaised between installation team and fabrication team. - Checked procedure of fabrication and transportation compare to basis of design.
-
-
-
CUEL Limited
-
Thailand
-
Oil and Gas
-
300 - 400 Employee
-
Production Engineer (Subsea Pipeline)
-
Nov 2008 - Jun 2011
- Prepared barge manifest, tally sheet, etc to reference materials and equipment before send to offshore.- Controlled fabrication work of Subsea Pipeline Tie-in Spool, Post installed riser, Guide Clamp, Hang Clamp, etc.- Prepared Hydro-test package for Tie-in spool, Post Installed riser, Launcher lay down head, Receiver lay down head, Subsea WYE, etc.- Prepared materials ship loose and installation aid send to offshore.- Issued MR to procure materials.- Run joints and cut length AFC drawing to issue site instruction.- Involved final inspection all ship loose on barge before sail away with client and installation representative.- Coordinated with client and installation representative and inspection service team to check materials and all equipment before packing and load out.- Keep record of all materials ship loose.- Supported offshore team in urgent case such as materials shortage.- Controlled fabrication progress provides finish following constant date.
-
-
-
-
Site Engineer.
-
Apr 2007 - Oct 2008
- Up to date revision of AFC drawing issue to work shop and work site.- Controlled materials to work shop and installation work site.- Involved inspection pipe fabrication spool.- Controlled fabrication and installation of piping system both underground and above ground.- Issued daily progress to client and main contractor.- Managed sequence of pre-commissioning scope.- Issued PR for procure materials and equipment.- Prepared hydro test package.- Walk around and line up position of equipment and instrument before commissioning.- Support commissioning team to first product.
-
-