Patrick Stemo

Plant Manager at Steele Solutions, Inc
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Manufacturing
    • 100 - 200 Employee
    • Plant Manager
      • Jan 2022 - Present

    • Assistant Plant Manager
      • Mar 2021 - Jan 2022

    • United States
    • Mining
    • 1 - 100 Employee
    • Plant Manager
      • Jan 2019 - Mar 2021

    • Manufacturing Engineer/Supervisor
      • Mar 2017 - Jan 2019

    • United States
    • Building Materials
    • 200 - 300 Employee
    • Manufacturing Engineer Intern
      • May 2016 - Sep 2016

      • Material Handling Improvements-Observed, designed, and implemented improvements to various assembly areas throughout the plant. Such as conveyors, ball transfer tables, and process improvements. • Dust Containment-Experiment with and improve upon current finishing area to help contain the dust produced. Different venting options, booths, and processes. • Press Brake Machine Retro-fitting-Study and learn our press brake machines to look for improvements in clamping and tooling on the older machines. • Communicated to department heads and engineering on project status on a weekly basis

    • Production Intern
      • May 2015 - Aug 2015

      • Developed and implemented new downtime codes specific for one product line within the plant. • Check weigher Data Collection-Created a method to extract data from a lines check weigher to see which product was having the most problems and giving the most waste. • Weight Studies-Do a random weight test on 30 pouches to check if the weights are in a certain specification to see how well the machine is running. • Communicated with department head on project status on a weekly basis. • Responsible for the training of floor personnel upon implementation of new processes.

    • Japan
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Mechanical Engineering Design Intern
      • May 2014 - Aug 2014

      • Developed and implemented multiple projects to increase productivity and efficiency in the design process. o Modified drawing issues. o Assessed and Modified lead cable spec documents. o Improved internal shaft and rotor design program. • Vibration Project- Solving new consistent tolerances for manufacturing motor components. • T-block/T-box Assembly Fits-Researched parts for manufacturing and created drawings for those new parts found. • Communicated to department heads and management on project status on a bi-weekly basis. • Responsible for designing and manufacturing name plates for production motors.

    • Service Agent
      • Jul 2013 - Sep 2013

    • United States
    • Spectator Sports
    • 500 - 600 Employee
    • Club House Attendent
      • Apr 2009 - Jun 2013

Education

  • University of Wisconsin-Platteville
    Mechanical Engineering
    2011 - 2016

Community

You need to have a working account to view this content. Click here to join now