Patrick Frost
Section Engineer at A14 Integrated Delivery Team- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
A14 Integrated Delivery Team
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
Section Engineer
-
Dec 2018 - Present
-
-
-
Highway
-
Italy
-
Information Technology & Services
-
1 - 100 Employee
-
Buried Services Coordinator
-
May 2018 - Present
-
-
-
Galliford Try
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Section Engineer
-
Sep 2017 - Present
MGjv. Southern Water project, new drainage installation for the village of Three Oaks near Hastings. MGjv. Southern Water project, new drainage installation for the village of Three Oaks near Hastings.
-
-
-
Morgan Sindall
-
Heathrow
-
Section Engineer
-
Oct 2016 - Present
Section Engineer / Site manager on one of the many projects around the air port. Section Engineer / Site manager on one of the many projects around the air port.
-
-
-
Costain Group PLC
-
United Kingdom
-
Civil Engineering
-
700 & Above Employee
-
Section Engineer
-
Jan 2017 - Sep 2017
M1 smart motorway infrastructure. M1 smart motorway infrastructure.
-
-
-
Costain Group PLC
-
United Kingdom
-
Civil Engineering
-
700 & Above Employee
-
Section Engineer
-
Feb 2016 - Oct 2016
Section Engineer for the Snagging (DOWLS) team, platforms and canopies. Section Engineer for the Snagging (DOWLS) team, platforms and canopies.
-
-
-
Morgan Sindall
-
Pudding Mill Lane< Strartford
-
Section Engineer (Survey Team)
-
Aug 2015 - Feb 2016
Part of the Survey Team at the Portal Cut and Cover for the Cross Rail project in Stratford London. Checking Setting out and performing as built surveys to the 1st stage concrete for the track bed. Using Leica TS16 total stations. Part of the Survey Team at the Portal Cut and Cover for the Cross Rail project in Stratford London. Checking Setting out and performing as built surveys to the 1st stage concrete for the track bed. Using Leica TS16 total stations.
-
-
-
BMJV
-
Northampton/ Leeds
-
Highways Engineer
-
Jan 2015 - Aug 2015
Building Smart motorway. Installing VRS barrier, Leading teams on night shifts to dig trial holes to locate services. Look after road topping removal and installation. Monitor de-vegetation works. Building Smart motorway. Installing VRS barrier, Leading teams on night shifts to dig trial holes to locate services. Look after road topping removal and installation. Monitor de-vegetation works.
-
-
-
Colas Rail Morgan Sindall Joint Venture
-
Swidon to Kemble Re- Doubling Project
-
Site Engineer
-
Aug 2014 - Nov 2014
Embankment re-grading, toe ditch's, drainage head walls and Level Crossings Embankment re-grading, toe ditch's, drainage head walls and Level Crossings
-
-
-
Network Rail
-
London Area, United Kingdom
-
Lead Site Engineer
-
Feb 2014 - Aug 2014
Looking after 4 platform extensions that NWR have chosen to PC themselves. Looking after 4 platform extensions that NWR have chosen to PC themselves.
-
-
-
BPH Rail and Civil Engineering
-
South East
-
Section Engineer/ Manager
-
Dec 2013 - Feb 2014
-
-
-
Hochtief
-
Bexhill, Sussex
-
Section Engineer
-
May 2013 - Oct 2013
Structures engineer on the new Bexhill to Hastings link road. Structures engineer on the new Bexhill to Hastings link road.
-
-
-
Construction Marine Ltd
-
Bedford
-
Section Engineer
-
Apr 2013 - May 2013
Track monitoring and embankment stabilization. Perform twice daily track monitoring. Set out and manage, 80m long, varying height retaining/ redi rock wall over an existing culvert. Track monitoring and embankment stabilization. Perform twice daily track monitoring. Set out and manage, 80m long, varying height retaining/ redi rock wall over an existing culvert.
-
-
-
Keltbray Rail
-
South Wales
-
|Senior Engineer
-
Feb 2013 - Mar 2013
Helped Keltbray Rail in the handover of two sections of track built by their pway team over two viadaucts in South Wales Helped Keltbray Rail in the handover of two sections of track built by their pway team over two viadaucts in South Wales
-
-
-
TATA Steel Rail
-
Yeovil, West Drayton, Langley
-
Senior site engineer
-
Jun 2012 - Feb 2013
Installing new modular platforms and station refurbs Installing new modular platforms and station refurbs
-
-
-
Amco South East Rail
-
Kent
-
Site Engineer
-
Jan 2012 - Jul 2012
Amco South East Working on Embankment stabilisation jobs, soil nailing, constructing Culverts aswell as retaining walls within the Network Rail Infrastructure. Amco South East Working on Embankment stabilisation jobs, soil nailing, constructing Culverts aswell as retaining walls within the Network Rail Infrastructure.
-
-
-
Colas Rail Morgan Sindall Joint Venture
-
Eltham, London
-
Site Engineer
-
Dec 2011 - Feb 2012
Platform Extension Works. Responsible for Track Monitoring and all Setting Out. Platform Extension Works. Responsible for Track Monitoring and all Setting Out.
-
-
-
BAM UK & Ireland
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Site Engineer
-
Sep 2011 - Jan 2012
Olympic Park Site Survey Setting Out QA Olympic Park Site Survey Setting Out QA
-
-
-
Carillion
-
United Kingdom
-
Facilities Services
-
700 & Above Employee
-
Site Engineer/ Surveyor
-
Apr 2011 - Sep 2011
Working on OLE infastructure. Gantry foundations, and screw piling. Setting out and surveying Working on OLE infastructure. Gantry foundations, and screw piling. Setting out and surveying
-
-
-
BAM UK & Ireland
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Site Engineer
-
Oct 2009 - Apr 2011
Embankment Stabilisation Installation of Gabion Baskets Bridge Replacement Track Monitoring Track Widening Installation of Kingpost wall Setting out Day to day running of job Includes some possession works Embankment Stabilisation Installation of Gabion Baskets Bridge Replacement Track Monitoring Track Widening Installation of Kingpost wall Setting out Day to day running of job Includes some possession works
-
-
-
Kier Group
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Site Engineer
-
Jun 2009 - Oct 2009
Embankment stabilisation works to a Network Rail and London Underground joint project, East Putney. Method statement production in QUENSH format and set up of site control Forming new abutments wall and repainting of the bridge. Project program production and client liaison. Embankment stabilisation works to a Network Rail and London Underground joint project, East Putney. Method statement production in QUENSH format and set up of site control Forming new abutments wall and repainting of the bridge. Project program production and client liaison.
-
-
Education
-
Folkestone Tech
B-Tec National, Civil Engineering