Patrick Cronin
Site Manager at NORTHVALE- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
NORTHVALE
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Site Manager
-
Oct 2022 - Present
Leading a complex cut and carve project which includes basement reduced dig and 50+m underpinning.-Demolishing 4no existing lift cores running through 7 floors, forming 4no new lift pits and install new dual lift framework between 7 floors. -Demolishing 4no adjoining properties roof levels and rear desending terraces, constructing 2no new steels frame levels to upper floors with new roof and plant deck. -Forming new structural openings to link all 4no buildings together using concrete lintels and structural goal posts. -Completing all necessary associated builderworks.All completed why applying a high health and safety threshold. Show less
-
-
Site Manager
-
Oct 2021 - Present
Full structural upgrade of existing building, demolition of existing structures, four storey atrium floor extension, new terrace installation, new roof installation, new R/C slab infills, metal deck slab infills, void former infills, UKPN substation build and service routes, diamond cutting, diamond drilling, structural riser openings and supports through 9 floors, all builders works managed and completed.
-
-
Site Manager
-
Aug 2021 - Present
full refurbishment works of the peabody building, 45 westminister bridge road, se1
-
-
-
Lowery Ltd
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Site supervisor/Manager
-
Oct 2016 - Aug 2021
Various projects supervised across railway infrastructure including critical upgrades and installations predominantly on behalf of Network Rail. Responsibilities include: feeder renewals, feeder installations, substation upgrades, new substation commissioning, route works, substation de-commissioning, TFS installations, track retaining works, UTX, HV works, long distance buried works, GRP works, CMS works and concreting. Various projects supervised across railway infrastructure including critical upgrades and installations predominantly on behalf of Network Rail. Responsibilities include: feeder renewals, feeder installations, substation upgrades, new substation commissioning, route works, substation de-commissioning, TFS installations, track retaining works, UTX, HV works, long distance buried works, GRP works, CMS works and concreting.
-
-
-
KPM CONSTRUCTION LIMITED
-
United Kingdom
-
Construction
-
1 - 100 Employee
-
Site Project Manager
-
2009 - 2016
Various Projects in London varying in length from 3-5 months and £100,000-£1,000,000 spend under management. Many refurbs and new builds working with the general public and registered with considerate contractors’ scheme, awarded an A level of excellence certificate. 2009-2010 – General site carpentry Various Projects in London varying in length from 3-5 months and £100,000-£1,000,000 spend under management. Many refurbs and new builds working with the general public and registered with considerate contractors’ scheme, awarded an A level of excellence certificate. 2009-2010 – General site carpentry
-
-
-
Silverline Construction Inc.
-
United States
-
Construction
-
1 - 100 Employee
-
Contractor
-
2008 - 2009
Full refurbishment projects Full refurbishment projects
-
-
-
KPM CONSTRUCTION LTD
-
London, England, United Kingdom
-
POST APPRENTICESHIP WORK EXPERIENCE
-
2001 - 2004
-
-
Education
-
St. Michael's roman Catholic school