Pat O'Loughlin

Signal Engineer at Green Aspect Consulting
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Newcastle Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Phil Duncan

Pat is a very hard working person and totally professional and reliable. Would recommend him anytime.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Truck Transportation
    • 1 - 100 Employee
    • Signal Engineer
      • Mar 2023 - Present

    • Australia
    • Transportation/Trucking/Railroad
    • 100 - 200 Employee
    • signalling test engineer
      • Jan 2019 - Feb 2023

    • Australia
    • Construction
    • 100 - 200 Employee
    • signals authorised person
      • Oct 2018 - Jan 2019

    • Australia
    • Truck Transportation
    • 700 & Above Employee
    • SME Signalling
      • Oct 2017 - Jun 2018

      TMP signalling dept TMP signalling dept

    • Australia
    • Appliances, Electrical, and Electronics Manufacturing
    • 200 - 300 Employee
    • Signalling Project Engineer
      • Oct 2016 - Oct 2017

      Legend Legend

    • Australia
    • Truck Transportation
    • 700 & Above Employee
    • Signalling SME
      • Oct 2015 - Sep 2016

      Critical Task Review team Critical Task Review team

    • Australia
    • Civil Engineering
    • 700 & Above Employee
    • Signal Tester
      • Oct 2014 - Oct 2015

      SIgnal Tester and Project Engineer for major signalling construction projects for Sydney Trains and ARTC my work involes QA documentation compiling Installation Works Packages and Commisioning works packages also Have testing Qualifications for ARTC and Sydney Trains And I.R.S.E licencing SIgnal Tester and Project Engineer for major signalling construction projects for Sydney Trains and ARTC my work involes QA documentation compiling Installation Works Packages and Commisioning works packages also Have testing Qualifications for ARTC and Sydney Trains And I.R.S.E licencing

    • Australia
    • Industrial Machinery Manufacturing
    • 300 - 400 Employee
    • Project Engineer
      • Jun 2013 - Feb 2014

      Assistant TIC preparing IWPs and CWPs for Sydney trains works, Signalling systems tester on SSI, Microlok II CSEE, HVI tracks Trainstops Assistant TIC preparing IWPs and CWPs for Sydney trains works, Signalling systems tester on SSI, Microlok II CSEE, HVI tracks Trainstops

    • Italy
    • Truck Transportation
    • 700 & Above Employee
    • Signal tester
      • Apr 2010 - Jun 2013

      Signaling Tester in Testing works, Functional Tester setting to work Microlok II Site acceptance tests Set to work UM71 Csee HVI and DC tracks Signaling Tester in Testing works, Functional Tester setting to work Microlok II Site acceptance tests Set to work UM71 Csee HVI and DC tracks

    • Senior Tester signalling
      • Jan 2006 - Jan 2012

    • Germany
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • Tester
      • Apr 2007 - Mar 2009

      I was employed in a team for installation and testing work for LUL for the dual fit area for the exchange of conventional Track Circuits to Thales Inductive loop (TBTC) Track Ccts and CSDE (correct door side enabling), and various other projects including : Installation of FS2500 Frequency track ccts and Engineer In Charge for installation and testing work for LUL for the replacement and new installation of WRSL Surelock and M63 point machines also the integration of Thales (TBTC) and WRSL WESTRACE system on Jubilee line March 09 to date ARTC Ansaldo STS Network Control System Alliance (Australia) I am employed in a team for testing work for ARTC on conventional Relay Based Interlocking and Computer Based Interlocking microprocessor (Microlok II) my main duties include the testing and commissioning with FAT, SAT and CWP documentation, the majority of our work is passing loops and Balloon loops for heavy coal rail traffic to Newcastle ports, I have also been involved in the testing and commissioning of ATMS (advanced train management system) in south Australia the main equipment i work with is : Juemont (HVI) and UM71 Csee and DC track ccts Microlok II microprocessor, Vossloh cogifer and Siemens points plus Kingfisher comms and frauscher axle counters Show less

    • United Kingdom
    • Truck Transportation
    • 300 - 400 Employee
    • Technical Officer
      • Nov 2000 - Sep 2004

      Whitechapel my main duties were the function testing after routine asset changes and maintenance of all Jubilee, Northern and Piccadilly lines the main equipment worked on was Ac Capacitor fed track circuits, Trainstops, signals, 4ft points, M63 points electro-mechanical frames, Non-vital equipment and Jubilee line Westinghouse WESTRACE Cred Engineering Ltd Director and employee of the above company which I set up in September 04 to specialise in Railway Signalling Testing and Installation Show less

    • United Kingdom
    • Non-profit Organizations
    • 700 & Above Employee
    • Technician
      • Jul 1990 - Nov 2000

      Earls court Depot During this time my main duties were maintenance and construction and testing of Victoria Line DTG (distance to go) ATP signalling and the installation and testing on the Central Line ATP (automatic train protection) with coded track circuits and all interface testing Earls court Depot During this time my main duties were maintenance and construction and testing of Victoria Line DTG (distance to go) ATP signalling and the installation and testing on the Central Line ATP (automatic train protection) with coded track circuits and all interface testing

    • United Kingdom
    • Rail Transportation
    • 700 & Above Employee
    • Senior Technician
      • Dec 1988 - Jul 1990

      Watford Junction During this time I was a Senior Technician on a signal fault team. My main Duties were on call to any Signalling faults which was on all aspects of the signalling system, this included all track circuits, signals, points, and signalmans panel

    • Technician
      • Feb 1988 - Jul 1990

    • Technician
      • Feb 1988 - Dec 1988

      My main duties as a Technician was general maintenance of points (mostly Clamplocks and HW1000 and 2000) and of signals e.g. voltage testing, lamp adjustment, also track circuit testing with drop shunt mostly DC fed and Track adjustments .Most of this work was done on conventional Signalling and Solid State Interlocking Microprocessors My main duties as a Technician was general maintenance of points (mostly Clamplocks and HW1000 and 2000) and of signals e.g. voltage testing, lamp adjustment, also track circuit testing with drop shunt mostly DC fed and Track adjustments .Most of this work was done on conventional Signalling and Solid State Interlocking Microprocessors

Education

  • Institute of Railway Signal Engineers (IRSE)
    1994 - 2022
  • Willesden College of Technology
    Electrical and Electronics Engineering, City and guild
    1986 - 1990
  • INTEC Education College
    Advanced Diploma of Engineering, Electrical and Electronics Engineering

Community

You need to have a working account to view this content. Click here to join now