Pasakorn N.

Vice President Project Management at The Platinum Group Public Co Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bangkok, Bangkok City, Thailand, TH
Languages
  • English Professional working proficiency
  • Thai Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Vice President Project Management
      • Oct 2019 - Present

    • Head of Buildings & Grounds
      • Mar 2017 - Oct 2019

    • Store Development Manager
      • Nov 2014 - Feb 2017

      - DO A STORE DESIGN PROPOSAL BY WORKING WITH THE REGIONAL IN SINGAPORE ,THE OPERATIONS,THE REAL ESTAE TEAM IN TERM OF THE STORE DESIGN, TO MEET WITH THE OPERATION’S REQUIREMENTS & DESIGN STANDARD.- DO A COST ESTIMATION / PROJECT SCHEDULE FOR NEW & RENOVATION STORE CONSTRUCTION.- COORDINATE WITH THE SHOPPING MALL FOR THE DESIGN APPROVAL. - COORDINATE WITH THE SUPPLIER IN CHINA FOR FURNITURE & LIGHTS PURCHASING.- PRICE NEGOTIATION WITH ALLS SUPPLIERS TO ENSURE THE ACTUAL BUDGET IS UNDER THE APPROVED BUDGET.- ON SITE VISIT TO MANGE AND MONITOR OF THE CONSTRUCTION TO ENSURE THE STORES ARE COMPLETED ON THE SCHEDULE, MATCH WITH THE REQUIREMENTS AND DESIGN STANDARD.- DO A PREVENTIVE MAINTENANCE PROGRAM FOR STORES MAINTENANCE.- WORK WITH THE ACCOUNT DEPARTMENT IN TERM OF THE ASSET MANAGEMENT OF THE STORES AND THE OFFICE.ACHIEVEMENT- DEVELOP A DESIGN STANDARD OF A DESTINATION STORE FOR BATA.- DEVELOP A RATECARD TO CONTROL CONSTRUCTION COST.- DO AN ENERGY SAVING BY CHANGING THE LIGHTS FROM MH. LIGHTS & CDM-T TO BE LED. LIGHTS.- DO A FIXED ASSET LIST AND IMPLIMENTED THE SYSTEM TO CONTROL A FIX ASSET. ACHIEVEMENT- DEVELOP A DESIGN STANDARD OF A DESTINATION STORE FOR BATA.- DEVELOP A RATECARD TO CONTROL CONSTRUCTION COST.- DO AN ENERGY SAVING BY CHANGING THE LIGHTS FROM MH. LIGHTS & CDM-T TO BE LED. LIGHTS.- DO A FIXED ASSET LIST AND IMPLIMENTED THE SYSTEM TO CONTROL A FIX ASSET.

    • Project Manager,Property Fund
      • 2012 - 2014

      - DO A BUDGET PROPOSAL IN TERM OF THE RENOVATION PROJECTS & MALL IMPROVEMENTS BY WORKING WITH MALL TEAM& FINANCE TEAM, PRESENT TO THE INVESTOR COMMIITEE (IC.) TO GET AN APPROVAL. - WORK WITH THE OUTSOURCE DESIGNER AND CONSULTANT IN TERM OF DOING THE PERMISSION , FOR BIDDING,FOR CONSTRUCTION DRAWINGS TO FINISH AS THE SHEDULE. - ON SITE VISIT TO MANGE AND MONITOR OF THE CONSTRUCTION PROJECTS TO ENSURE THE PROJECTS ARE COMPLETED ON THE SCHEDULE, MATCH WITH THE REQUIREMENTS AND DESIGN STANDARD. - WORK WITH THE FACILITY MANAGEMENT TEAM TO ENSURE THAT ALLS STORES UNDER TLGF. PROPERTY FUND ARE OPERATED IN A PROPER WAY.ACHIEVEMENT- DO A RENOVATION OF 8 TLGF.STORES WITHIN THE PROPOSED BUDGET 350 MB. & ACHIEVE WITH THE INCOME UPLIFT AS FORECAST.- DO A SPACE IMPROVEMENTS WITH 30 MB. BUDGET AND GET 44 MB. RENTAL UPLIFT WITHIN 1 YEAR.- DO ENERGY SAVING BY CHANGING THE LIGHTS TO BE LED.LIGHTS WITH 9 MB. BUDGET FOR 15 STORES AND GET THE PAYBACK WITHIN 1 YEARS.

    • Planning Manager,Design Department
      • 2005 - 2012

      - DO A PROPOSAL FOR HYPERMARKET STORE, TALAD STORE, DISTRIBUTION CENTER BY GET ALL INFORMATIONS FROM THE RELATED PARTIES SUCH AS THE PROPERTY ACQUISITION, SITE RESEARCH ,MALL , LEGAL AND LOCAL MARKETING TEAM.- WORK WITH THE OUTSOURCE DESIGNER AND CONSULTANT IN TERM OF DOING THE PERMISSION , FOR BIDDING,FOR CONSTRUCTION DRAWINGS TO FINISH AS THE SHEDULE.- COORDINATE WITH THE CONSTRUCTION TEAM,ON SITE VISIT TO MANGE AND MONITOR OF THE CONSTRUCTION PROJECTS TO ENSURE THE PROJECTS ARE COMPLETED ON THE SCHEDULE, MATCH WITH THE REQUIREMENTS AND DESIGN STANDARD.ACHIEVEMENT- DEVELOP A MALL BLUEPRINT WITH THE OUTSOURCE DESIGNER.- DEVELOP A BLUEPRINT FOR TALAD FORMAT FOR TESCO LOTUS IN TERM OF THE SITE PLAN, FLOOR PLAN AND FAÇADE. (TALAD 0.7 K.,TALAD 1 K.,TALAD 2 K.)- DEVELOP A DESIGN OF TESCO LOTUS REGIONAL DISTRIBUTION CENTER IN THE NORTH, NORTH EAST AND SOUTH.- DEVELOP A DESIGN OF TESCO LOTUS EXPRESS DISTRIBUTION CENTER IN BANGBUATHONG.- DEVELOP NEW & RENOVATION TESCO LOTUS HYPERMARKET STORES AND FINISH AS THE SCHEDULE AND MEET WITH THE REQUIREMENTS AND DESIGN STANDARD.- DEVELOP A DESIGN OF THE NEW HEAD OFFICE BUILDING WITH THE OUTSOURCE DESIGNER.

    • Bangladesh
    • Real Estate
    • Project Architect
      • 2004 - 2005

      - DO A CONCEPTUAL DESIGN , COORDINATE WITH THE ARCHITECT FIRM IN SINGAPORE .- DO A DETAILS DESIGN, WORK WITH THE LOCAL ARCHITECT IN PHUKET IN TERM OF THE FOR CONSTRUCTION DRAWINGS.- DO THE INSPECTION OF THE CONSTRUCTION AT SITE.- CONTROL, MANAGE THE CONSTRUCTION COST UNDER THE PROJECT BUDGET , MATCH WITH THE DESIGN STANDARD AND FINISH WITHIN THE PROJECT SCHEDULE.- GIVE A CONSULT TO THE CROSS FUNCTIONAL TEAM SUCH AS CONSTRUCTION TEAM ,MAINTENANCE , MARKETING AND SALES TEAM. PROJECT REFERENCE: THE RESIDENCE PHASEI, II :THEPARK : THE LOCHPALM : THE PIER : THE RED ROOM

    • Project Architect
      • 2002 - 2004

      - CONTROL, MANAGE THE CONSTRUCTION COST UNDER THE PROJECT BUDGET , MATCH WITH THE DESIGN STANDARD AND FINISH WITHIN THE PROJECT SCHEDULE.- GIVE A CONSULT TO THE CROSS FUNCTIONAL TEAM SUCH AS CONSTRUCTION TEAM ,MAINTENANCE , MARKETING AND SALES TEAM. PROJECTS REFERENCE: KRISDANAKORN 25 (MINBURI-PRACHARUAMJAI) : KRISDANAKORN 26 (PINKLAO – NAKORNCHAISRI) : KRISDANAKORN 36 (PINKLAO) : KRISDANAKORN 39 (PINKLAO) : KRISDANAKORN 41 ( PRARAM 5) : THE KRIS, RATCHADA (RATCHADAPHISEK ROAD)

    • Government Administration
    • 1 - 100 Employee
    • Urban Planner
      • Apr 2000 - Apr 2002

      - DO A SPECIFIC WORK ABOUT URBAN PLANNING SUCH AS STUDY, RESEARCH , ANALYZE, URBAN DESIGN & PLANNING, LAND USE PLANNING ,SET A REGULATIONS TO CONTROL LAND USE.- DO A COMPREHENSIVE URBAN PLANNING & REGULATIONS.

Education

  • Chulalongkorn University
    Bachelor’s Degree, Architecture
    1993 - 1998
  • Suankularb Wittayalai School
    High School, Math Science
    1986 - 1992

Community

You need to have a working account to view this content. Click here to join now