Parisa Rahbarian
Senior Data Analyst at Queensland Revenue Office- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Persian Native or bilingual proficiency
-
French Limited working proficiency
-
English Native or bilingual proficiency
Topline Score
Bio
Credentials
-
Exploratory Data Analysis in Python
DataCampOct, 2021- Oct, 2024 -
Power BI Virtual Case Experience
PwC AustraliaOct, 2021- Oct, 2024 -
Microsoft Power BI desktop for Business Intelligence
UdemySep, 2021- Oct, 2024 -
First Aid
Real ResponseJan, 2018- Oct, 2024 -
Microsoft Certified: Data Analyst Associate
MicrosoftDec, 2021- Oct, 2024 -
machine learning
Coursera
Experience
-
Queensland Revenue Office
-
Government Administration
-
100 - 200 Employee
-
Senior Data Analyst
-
May 2022 - Present
-
-
-
Get2Know
-
Australia
-
Wellness and Fitness Services
-
1 - 100 Employee
-
Analyst/ Project coordinator
-
Jul 2021 - Sep 2021
-
-
-
Petro-Tech Central (PTC)
-
Australia
-
Oil and Gas
-
1 - 100 Employee
-
Data Analyst/Petroleum Engineer
-
Sep 2020 - Jul 2021
- Managed reservoir data set for Trinidad oil field and Surat gas project in Surat Basin. - Project planning and coordination. - Well test interpretation of several boreholes for the Snowy Hydro2 project for GHD. - Government reports (production, reserves and royalty) accross several blocks. - Managed reservoir data set for Trinidad oil field and Surat gas project in Surat Basin. - Project planning and coordination. - Well test interpretation of several boreholes for the Snowy Hydro2 project for GHD. - Government reports (production, reserves and royalty) accross several blocks.
-
-
-
Senex Energy
-
Australia
-
Natural Gas Extraction
-
100 - 200 Employee
-
Petroleum Engineer
-
Jan 2020 - Aug 2020
- Daily visualisation and manipulation of production data for Atlas and Roma field using SQL Database to align current and target figures. Daily and Monthly dashboard report presented to different stakeholders on regular basis. -Technical evaluation and optimisation of downhole pump and artificial lift for Cooper basin - Monthly forecast data administration and coordination for Cooper basin oil asset .The forecast presented to COO and other stakeholders. - Daily visualisation and manipulation of production data for Atlas and Roma field using SQL Database to align current and target figures. Daily and Monthly dashboard report presented to different stakeholders on regular basis. -Technical evaluation and optimisation of downhole pump and artificial lift for Cooper basin - Monthly forecast data administration and coordination for Cooper basin oil asset .The forecast presented to COO and other stakeholders.
-
-
-
Westside Oil Company
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Petroleum Engineer
-
Aug 2018 - Dec 2019
- Data set preparation, cleaning and analysis using python for reservoir evaluation /Production forecast - Provided well appraisal reports seeking JV approvals as per horizontal well drilling - Data set preparation, cleaning and analysis using python for reservoir evaluation /Production forecast - Provided well appraisal reports seeking JV approvals as per horizontal well drilling
-
-
-
Tlou Energy Ltd
-
Australia
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Reservoir Engineer
-
Jan 2015 - Jul 2015
- Initiated a document for Lesedi wells in Botswana field that provides instructions to analyze raw daily production data extracted from Scada during Lesedi production test . The analyzed data used for future development plan and could save the cost of drilling of unnecessary wells. - Initiated a document for Lesedi wells in Botswana field that provides instructions to analyze raw daily production data extracted from Scada during Lesedi production test . The analyzed data used for future development plan and could save the cost of drilling of unnecessary wells.
-
-
-
Santos Ltd
-
Australia
-
Oil and Gas
-
700 & Above Employee
-
Reservoir Engineer
-
Jul 2010 - Jul 2013
Main Duties: Reservoir Characterization and simulation: - DST analysis ,Design and interpretation -Contingent resource best estimate recovery factor / uncertainties analysis Reservoir Management: -Pilot well design for pressure monitoring wells. Reservoir Development: -Future Appraisal well planning and pilot design Main Duties: Reservoir Characterization and simulation: - DST analysis ,Design and interpretation -Contingent resource best estimate recovery factor / uncertainties analysis Reservoir Management: -Pilot well design for pressure monitoring wells. Reservoir Development: -Future Appraisal well planning and pilot design
-
-
-
BG Group
-
Oil and Gas
-
700 & Above Employee
-
Reservoir Engineer
-
Feb 2008 - Jul 2010
Reservoir Characterisation and Simulation.-Full field reservoir model for the QCLNG project foundation field using GEM and Eclipse soft wares to evaluate alternative development concepts. -Reservoir characterization and well test analysis using FEKETE and PAN system soft wares Reservoir Characterisation and Simulation.-Full field reservoir model for the QCLNG project foundation field using GEM and Eclipse soft wares to evaluate alternative development concepts. -Reservoir characterization and well test analysis using FEKETE and PAN system soft wares
-
-
-
The National Iranian Oil Company (NIOC)- Iranian Fuel Conservation Company
-
Government Administration
-
400 - 500 Employee
-
Reservoir Engineer
-
Dec 1997 - Jan 2001
-
-
Education
-
Australian Institute of Business
Master of Business Administration (MBA), Finance, General -
Amirkabir University of Technology - Tehran Polytechnic
Master of Engineering (MEng), Chemical Engineering -
Iran University of Science and Technology
Bachelor's degree, Chemical Engineering