Paramee Kullanatpokin

Business Process Improvement Manager at BLCP Power Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Thailand, TH

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Thailand
    • Oil and Gas
    • 1 - 100 Employee
    • Business Process Improvement Manager
      • Mar 2019 - Present

      - Reviewing the business process and make it more robust while maintaining the standard level of management control.- Reviewing the core applications, but not limited to Assets Management System (MAXIMO, Ni-Soft, NAV etc.), Finance, Accounting, Budgeting, SH&E to ensure that such applications are aligned with business process as mentioned above.- Reviewing, upgrading all related business process applications to be prudent for business process requirements.- Studying to propose the most appropriate solution(s) such as applications, technology of IoT, big data, cloud computing, analytics, AI or digitalization etc. for related business activities to be further leveraged.- Implementing the Business Dashboard for management and senior management level for decision making.- Working closely and seamlessly with MIS/IT Department to ensure effective cybersecurity, infrastructure, ISO 27001 compliance- Manage and Control Project for Business Process Improvement - Promoting and cultivating innovation in Department- Lead team to Improve and Develop Business Process Show less

    • Engineering Support Manager
      • Jun 2014 - Feb 2019

      - Manage , Control and Optimize stock level of Inventory for spare part and consumable. - Manage and Control planning and scheduling for maintenance work such outage work , routine work- Manage and Control Condition Monitoring , Lubrication work to maintain plant reliability and availability. - Manage and Control Supporting work such as erection and dismantle instant upright scaffolding inside Boiler for inspection and repairing boiler tube , BS scaffolding , Civil work , Painting , Project , Plant Improvement , etc.- Budget preparation for engineering team Show less

    • Planning Engineer
      • Jun 2005 - Jun 2014

      - Managing an outage plan both minor and major works such as work order system,planning, scheduling and resource until accomplish those. And also, develop anoutage planning.- Planning and Coordinate with maintenance engineering team and operation teamabout maintenance work orders so as to inform works to prepare isolation inadvance if need and ensure that able to perform all work order under safety rule.Tracking the progress of work order, backlog work order and actual records toaccomplish to objective as mention in work flow system on CMMS.- Maintain database to provide historical data on equipment repair to failure analysisand also improve maintenance strategy.- Establish, Improve and Control the KPI for maintenance works.- Establish, Improve and Control the Failure analysis system.- Prepare and summary budget.- Organize, prepare and follow up the training for PGS’s engineering staff in case of reinvestmentbudget.- Assist to collect and conclude the budget for engineering support team.*** Application Champion of MAXIMO Implementation project team during Y2005-Y2006 ***Responsible for the project team leader and deputies for the Project Manager whenrequired. Also advocate and accomplish MAXIMO go-live as following- The leader of establishment and advocating the script for unit and acceptancetesting and summary the result.- Partake in establish business requirement such as Maintenance workflow, Purchasingworkflow, Inventory workflow, code number, etc. and also update the details so asto report to superior or management personnel.- Find out the solution to fix problem in during implement.- Prepare MAXIMO training to PGS staff and act as instructor to teach PGS staff in caseof “BLCP MAXIMO 5.2 User Training - General Information”. Also advocate anothertrainer to train PGS staff in case of other course.- Prepare, follow up and advocate the standard data to uploading into MAXIMO suchas Job Plan, Equipment, Labor, PM, etc. Show less

    • Thailand
    • Utilities
    • 1 - 100 Employee
    • Maintenance Planning and Scheduling Engineer
      • Jun 2001 - May 2005

      There are two functions as followingFirst, responsible for the planning and scheduling of all work tasks performed bymaintenance and engineering. All work plans will be planned, except emergency work anddistributed to the appropriate department and group as manpower is available. Emergency work isperformed first and followed through with a reporting system to capture the cost of expended timeand materials. Responsibilities include the maintenance management process of the plant,coordination work efforts and reporting between the operations and maintenance department.Duties include the reporting of work process, schedules, and cost control and manpowerrequirements to plant management. Also, maintain an up to date outage list for all equipment onsite. Also required to establish outage maintenance plans and scheduling of the appropriatemanpower resources to ensure timely outage completion.Tracking, setup, improve and summarize Maintenance’s KPI to develop MaintenanceStrategy. Moreover, prepare and summarize “Maintenance Monthly Report” to managementpersonnel as following• Executive summary report ,KPI report• Maintenance cost• Maintenance works planning and Strategy for next month• OtherFinally, Responsible for CMMS administrator as MAXIMO System administrator there are theduties and responsibilities are listed below.• CMMS Development• Improvement project such as the bar code system for inventory control,Asset catalog, Work order system, Equipment route, Job plan, PM, etc.• Establish and Create the reporting system by “Crystal report” and “Brio” suchas Work order report, Work order Tracking report, Work backlog report,Permit to work report, PR,PO, RFQ report, PM report, bar code report, etc.• Creating custom applications and Using Edit Windows to modify MAXIMOscreens , Configuring the MAXIMO database and Establishing user security in MAXIMO• Modifying application setup options in MAXIMO Show less

    • Instrument and Control Technician
      • Dec 1998 - May 2001

      Responsible for the calibration of all meters, transmitters, gages, flow meters,and other electrical and pneumatic devices.• Responsible for the maintenance of the plants DCS system and other controlloops for the plants processes.• Works closely with the operations and engineers to act as a resource ofknowledge for their decision making process.• Program and troubleshoot microprocessors.• Troubleshoot pressure measuring devices, level sensing devices, andtemperature sensing devices.• Troubleshoot and calibrate electronic control instruments.• Calibrate temperature control instruments.• Calibrate valve positioners• Calibrate transducers.• Assist the engineers in the maintenance, programming and troubleshooting ofthe plants DCS and T/G control systems.• Maintain the telephone system such as PABX , Installation , Repairing, Modifyand Improvement Show less

Education

  • King Mongkut’s Unniversity of Technology Thonburi
    Master of Business Administration - MBA, Master of Business Administration Program in Entrepreneurship Management
    2008 - 2009
  • King Mongkut’s Institute of Technology Ladkrabang
    Bachelor of Engineering - BE, Bachelor of Engineering in Instrumentation Engineering
    1995 - 1998

Community

You need to have a working account to view this content. Click here to join now