Padraic Mellett

Founder & Director at OFFSITE
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Kewdale, Western Australia, Australia, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Construction
    • 1 - 100 Employee
    • Founder & Director
      • Sep 2009 - Present

      • Closed Panel Timber Frame Design, Manufacturing and Construction • Mass Timber Design, Manufacturing and Construction (LVL & GLULAM) • Construction Product Statutory Testing & Certification (BCA, Australian Standards & CodeMark) • Weinmann Automated Timber Frame Plant Design, Installation & Commissioning • Selfbuilt CNC machine design, building, programming & commissioning • CAD/CAM/BIM/ERP/MRP Software Development, Testing, Implementation & Teaching • Marketing • Business Development • Construction Estimating • Construction Value Engineering • Construction Contract Administration • Construction Project Management • Post Contract Client Support • Research and Development of a Massive Permanent Formwork Commercial Construction System • Construction, Commercial, Contract, Property, HR, Immigration & Patent Law • International Patent Specification, Drawings & Applications • Risk Planning & Mitigation • Federal Research & Development Grant Applications • HR Management • OH&S Management • Business Administration • Corporate Finance & Fundraising • Corporate Secretarial • Board Directorship

    • Construction
    • Founder & Director
      • Aug 2015 - Present

      • Self Erecting Tower Crane Hire • Project Scoping • Lift Plans • Foundation Design • SETC Mobilisation and Demobilisation • Crane Safe Certification • OH&S & SWMS Documentation • Work Safe Design Registration • Self Erecting Tower Crane Hire • Project Scoping • Lift Plans • Foundation Design • SETC Mobilisation and Demobilisation • Crane Safe Certification • OH&S & SWMS Documentation • Work Safe Design Registration

    • Operations Manager
      • Jan 2008 - May 2009

      • Modular Permanent Formwork Development Company• Primaform® • R&D on Permanent Formwork System • CAD/CAM/BIM Software Customization & Development • Feasibility Studies • Manufacturing Plant Concept Design • Reinforced Concrete Project Estimating • Modular Permanent Formwork Development Company• Primaform® • R&D on Permanent Formwork System • CAD/CAM/BIM Software Customization & Development • Feasibility Studies • Manufacturing Plant Concept Design • Reinforced Concrete Project Estimating

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Quantity Surveyor
      • Aug 2007 - Dec 2007

      • Measured around 50,000m3 worth of Reinforced Concrete Packages on a $2BN Project • Quantified As-Built Village and Accommodation Camp Construction • Field Measurement of Sub-Contractor Progress Claims • Involved in implementation of Oracle Quantity Man Hour Reporting Software. • Contributed to Monthly Earned Value Reporting • Measured around 50,000m3 worth of Reinforced Concrete Packages on a $2BN Project • Quantified As-Built Village and Accommodation Camp Construction • Field Measurement of Sub-Contractor Progress Claims • Involved in implementation of Oracle Quantity Man Hour Reporting Software. • Contributed to Monthly Earned Value Reporting

    • Contracts Administrator
      • Mar 2007 - Aug 2007

      • Created Budgets and Cost Codes in CHEOPS for $5M-$20M Commercial Projects • Negotiated and Let Sub-Contract Packages • Processed Sub-Contractor Progress Claims and Measured Progress Onsite • Prepared Variations, EOT's, Head Contract Claims & RFI's • Helped PM prepare monthly P&L's, Cost to Completes, Cash Flows and KPI's • Created Budgets and Cost Codes in CHEOPS for $5M-$20M Commercial Projects • Negotiated and Let Sub-Contract Packages • Processed Sub-Contractor Progress Claims and Measured Progress Onsite • Prepared Variations, EOT's, Head Contract Claims & RFI's • Helped PM prepare monthly P&L's, Cost to Completes, Cash Flows and KPI's

    • Austria
    • Construction
    • 1 - 100 Employee
    • Site Manager
      • Jan 2005 - Feb 2007

      • VST - Permanent Formwork Systems Ltd JV • Management of an OFFSITE Permanent Formwork System Installation, Rebar & Concrete Work • Implemented OH&S Procedures & Toolbox Talks • Project Scheduling & Programming to Element Production in Slovakia • Local Material, Labour, Cranage and Plant Procurement • Liaised with Project Architects, Builder and Consultant Structural Engineer • Part Time Remote Contract Work Oct 06 - Feb 07 While Backpacking Around The World • VST - Permanent Formwork Systems Ltd JV • Management of an OFFSITE Permanent Formwork System Installation, Rebar & Concrete Work • Implemented OH&S Procedures & Toolbox Talks • Project Scheduling & Programming to Element Production in Slovakia • Local Material, Labour, Cranage and Plant Procurement • Liaised with Project Architects, Builder and Consultant Structural Engineer • Part Time Remote Contract Work Oct 06 - Feb 07 While Backpacking Around The World

    • United States
    • Construction
    • Site Supervisor
      • Apr 2003 - Dec 2004

      • Multi-Unit Residential Reinforced Concrete Frames • Concrete Driveways, Footpaths, Kerbing, Head Walls, Manholes & Concrete Structures • Traditional Formwork • Installing Utilities • Civil Construction • Multi-Unit Residential Reinforced Concrete Frames • Concrete Driveways, Footpaths, Kerbing, Head Walls, Manholes & Concrete Structures • Traditional Formwork • Installing Utilities • Civil Construction

    • United Kingdom
    • Financial Services
    • 1 - 100 Employee
    • Junior Proprietary Derivatives Trader
      • May 2002 - Apr 2003

      • Intra Day Interest Rate Future Trading (LIFFE & EUREX) • Corporate Hedging (FX, Treasury & Commodities) • Spread Trading • Futures vs Underlying Arbitrage • Rollover Arbitrage • Intra Day Interest Rate Future Trading (LIFFE & EUREX) • Corporate Hedging (FX, Treasury & Commodities) • Spread Trading • Futures vs Underlying Arbitrage • Rollover Arbitrage

    • United Kingdom
    • Construction
    • 100 - 200 Employee
    • Formworker & Concretor
      • Jan 2002 - Apr 2002

      • Apartment Tower Head Works by the Thames River • Reinforced Concrete Piles, Foundations, Blinding, Ground Beams & On Grade Concrete Slabs • Reinforced Concrete Retaining Walls, Pile Shotcreting, Lift & Pump Sumps & Basement Cores, • Reinforced Concrete Colum's & Beams & Transfer Slab • Precast Concrete Sewer & Storm Lines & Manholes. • Apartment Tower Head Works by the Thames River • Reinforced Concrete Piles, Foundations, Blinding, Ground Beams & On Grade Concrete Slabs • Reinforced Concrete Retaining Walls, Pile Shotcreting, Lift & Pump Sumps & Basement Cores, • Reinforced Concrete Colum's & Beams & Transfer Slab • Precast Concrete Sewer & Storm Lines & Manholes.

    • Ireland
    • Civil Engineering
    • 1 - 100 Employee
    • Formworker & Concretor
      • Jul 2001 - Dec 2001

      • Civil Works for the Dundrum Bypass • Reinforced Concrete Culvert • Reinforced Concrete Bridge • Kerbing • Roadbase Preparation for Asphalt • Civil Works for the Dundrum Bypass • Reinforced Concrete Culvert • Reinforced Concrete Bridge • Kerbing • Roadbase Preparation for Asphalt

Community

You need to have a working account to view this content. Click here to join now