Ovidiu B.

Director Tehnic at CONEST SA Iasi
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Iaşi, Romania, RO
Languages
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Responsabil Tehnic cu Executia 1.1
    M.T.C.T / Inspectoratul de Stat In Constructii
    Nov, 2005
    - Nov, 2024

Experience

    • Romania
    • Construction
    • 1 - 100 Employee
    • Director Tehnic
      • Jul 2020 - Present

    • Manager Proiect
      • Jul 2019 - Jul 2020

    • Romania
    • Construction
    • 1 - 100 Employee
    • Inginer Sef Divizia de Drumuri si Poduri
      • Aug 2018 - Jul 2019

    • DIRECTOR TEHNIC
      • Jan 2015 - Jul 2018

      2015 – Coordonare lucrari in valoare de peste 50 de milioane de euro 2016 - Coordonare lucrari in valoare de peste 25 de milioane de euro 2017- Coordonare lucrari in valoare de peste 25 de milioane de euro - Campusuri scolare – Oradea si Sacuieni jud Bihor - Ecologizari si inchideri depozite de steril – Rosia Montana - Reabilitari de drumuri nationale – DN76 – jud Hunedoara, Arad, Bihor - Reabilitari de drumuri judetene – judetul Bihor si Satu Mare DJ 191 Marghita - Tasnad - Lucrari de canalizare – Vadu Crisului , Bratca, Suncuius , Sacuieni judetul Bihor , Nadlac judetul Arad - Reabilitare monumente istorice : Reabilitare Palatul de justitie Oradea , finalizare lucrari la Muzeul Tarii Crisurilor - Lucrari hidrotehnice : Amenajare albie Ohaba, judetul Hunedoara B . Lucari coordonate direct : Coordonator proiect la: - Descongestionarea traficului rutier si imbunatatirea mobilitatii populatiei pe coridorul transfrotalier de legatura Oradea – Biharkeresztes - Reabilitare DN 76, Soimus-Varfurile, Contract 5R12, Varfurile - Stei km 69+350 - km 102+660 Reprezentant antreprenor la : - Reabilitare DN 76,Soimus-Varfurile,km 0+000-km 69+350 Lot 1-Contract 5R10a, Soimus-Brad, km 0+000-km 30+436 Show less

    • Project Manager
      • Feb 2008 - Jan 2015

      Investitii imobiliare Manager de proiect Coordonarea proiectarii , executiei si stabilirea solutiilor optime ale complexului CAROL PLAZA Business Center • Identificarea parametrilor realistici si constrangerile asupra lucrarilor de constructii • Oferirea de consultanta si asistarea in operatiunile de alegere a membrilor echipei de design,. • Monitorizarea si raportarea catre dezvoltator a abaterilor de la programul stabilit initial. • Coordonarea si administrarea procesului de ofertare a proiectului. • Stabilirea unui program de intalniri pentru faza de constructie alaturi de toate partile implicate. • Monitorizarea abaterilor lucrarilor de constructie de la programul stabilit initial si stabilirea masurilor de reintrare in parametrii optimi de realizare a investitiei. • Monitorizarea modificarilor efectuate de echipa de design, Show less

    • Director Tehnic
      • Jun 2007 - Feb 2008

      Investitii imobiliare Coordonarea proiectarii si stabilirea solutiilor optime ale cartierului “LUCEAFARUL” Coordonarea executiei proiectului : grafice, devize, costuri Investitii imobiliare Coordonarea proiectarii si stabilirea solutiilor optime ale cartierului “LUCEAFARUL” Coordonarea executiei proiectului : grafice, devize, costuri

    • Director Tehnic
      • Jan 2005 - Jun 2007

      Coordonarea activitatilor de constructii, responsabil tehnic privind calitatea executiei lucrarilor de constructii -COMPLEX COMERCIAL MOLDOVA MALL - 22.000 MP ADC - Blocuri locuinte Iasi/ Botosani - 700 apartamente Coordonarea activitatilor de constructii, responsabil tehnic privind calitatea executiei lucrarilor de constructii -COMPLEX COMERCIAL MOLDOVA MALL - 22.000 MP ADC - Blocuri locuinte Iasi/ Botosani - 700 apartamente

    • Administrator - firma proprie de constructii cu aproximativ 150 angajati .
      • Jan 2004 - Jan 2005

      Contractarea si coordonarea executiei lucrarilor de constructii, responsabil tehnic privind calitatea lucrarilor de constructii . Am finalizat lucrarile la Universitatea Petre Andrei Iasi, structura rezistenta Corp C - Extindere Iulius MAll Iasi , structura rezistenta Hostel Studis Iasi Contractarea si coordonarea executiei lucrarilor de constructii, responsabil tehnic privind calitatea lucrarilor de constructii . Am finalizat lucrarile la Universitatea Petre Andrei Iasi, structura rezistenta Corp C - Extindere Iulius MAll Iasi , structura rezistenta Hostel Studis Iasi

  • S.C. Moldrom S.A. Iasi
    • Iasi County, Romania
    • Inginer , sef de punct de lucru , inginer ofertare-decontare
      • Jul 1997 - Jan 2004

      Executarea lucrarilor de constructii -SEDIU UNIVERSITATE PETRE ANDREI IASI 10.000 MP ADC - Case individuale - Extindere Cinema Copou Executarea lucrarilor de constructii -SEDIU UNIVERSITATE PETRE ANDREI IASI 10.000 MP ADC - Case individuale - Extindere Cinema Copou

  • S.C. TRUST CONSTRUCTII S.A.
    • Bulevardul Copou nr 4 Iasi
    • Inginer executie
      • Jul 1992 - Jul 1997

      Inginer, Sef de punct de lucru Coordonare activitate de executie cladiri de locuit (blocuri de locuinte), spatii comerciale, lucrari industrial (hale, platforme ). Inginer, Sef de punct de lucru Coordonare activitate de executie cladiri de locuit (blocuri de locuinte), spatii comerciale, lucrari industrial (hale, platforme ).

    • Muncitor necalificat / tehnician
      • Sep 1986 - Jul 1992

      Am facut facultatea la seral lucrand in cei sase ani pe santier , evoluand de la muncitor necalificat la tehnician constructor . Am facut facultatea la seral lucrand in cei sase ani pe santier , evoluand de la muncitor necalificat la tehnician constructor .

Education

  • Universitatea Tehnică „Gheorghe Asachi” din Iași Sectia CFDP
    Diplomă de Inginer (Inginer Diplomat), Constructii C.F.D.P.
    1986 - 1992

Community

You need to have a working account to view this content. Click here to join now