Otunba Kayode Olagunju
GMD/CEO at BATOK Offshore and Oil Services- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
BATOK Offshore and Oil Services
-
Nigeria
-
Oil and Gas
-
1 - 100 Employee
-
GMD/CEO
-
2014 - Present
Nigerian indigenous company whose head office is located in Port Harcourt. With expertise in the general topsides inspection & maintenance of CALM buoys. BATOK also offer ROV subsea services. Through our trusted partners we offer hot tapping, line stopping solution and online valve maintenance. Nigerian indigenous company whose head office is located in Port Harcourt. With expertise in the general topsides inspection & maintenance of CALM buoys. BATOK also offer ROV subsea services. Through our trusted partners we offer hot tapping, line stopping solution and online valve maintenance.
-
-
-
Shell
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
-
2013 - 2014
Corporate Underwater Maintenance Supervisory Roles and responsibilities/Achievement.Project Engineer onboard DSV Melody (Oct 2013)Carried out export crude line back flush and executed export crude loading floating hose removal and replacement, realignment of Forcados Terminal SPM 2 subsea hose.Project Engineer onboard BOURBON RHESOS (June 2013)Carried out export crude line back flush and executed export crude loading floating hose removal and replacement Sea Eagle FPSO.Project Engineer onboard BOURBON RHESOS (April / May 2013)Carried out export crude line back flush and executed export crude loading floating hose removal and replacement Bonga FPSO.Project Engineer onboard MV Melody DSV (Jan2012)Replaced ruptured subsea hose-string and carried out statutory 5-yearly change-out of floating hose-strings on Bonny SPM 2.Project Engineer onboard ATLANTIS DWELLER DSV (Nov 2011)Carried out inspection survey on the ruptured subsea hose-string.to determine the source of the leak on Bonny SPM 2.Project Engineer onboard Lamnalco Tanker handler- KUDU (Dec 2011)Installed Export Tanker mooring grommet assembly on Bonny SPM 3.Project Engineer onboard BOURBON RHESOS (June 2011)Carried out export crude line flush and executed export crude loading floating hose removal and replacement at Sea Eagle FPSOSupervision of a crew of 5 personnel to execute the export hose sectional replacement and leaking 20” swivel ball valve on the Sea Eagle Show less
-
-
-
2008 - 2013
FPSO including Mooring Hawser installation as part of the re-entry programme. (May to Sep 2009)Routine responsibilities included but not limited to;Crude loading Tanker mooring operations.Ensures the technical integrity of all SPDCs offshore, marine production structures in the Western region.Liaises with the offshore structural and underwater services team members.Monitor all berthing/loading activities inshore/offshore by regular checking andMaintenance of SPM 1& 2 and loading hoses.Ensure ISO 14001 and OHSAS requirements are complied with in marine maintenance activitiesManage the contractors offshore DSV / Barges Show less
-
-
-
Transocean
-
Switzerland
-
Oil and Gas
-
700 & Above Employee
-
3rd DP Engineer
-
Jan 2006 - Jul 2006
On-Board sea Water Discovery (Drilling Ship) On-Board sea Water Discovery (Drilling Ship)
-
-
-
SEACOR Marine Holdings
-
United States
-
Maritime Transportation
-
200 - 300 Employee
-
3rd Engineer.
-
2005 - May 2006
Onboard MV Seacor Glory Onboard MV Seacor Glory
-
-
-
Alusteel interoil & Dickson GMP JV USA LTD
-
United States
-
Onboard Barge Major
-
Oct 1996 - 1998
Deck Foreman onboard barge Major offshore contraction. , SBM installation at ELF field in Cameroon Africa. S.B.M crude oil flushing. Floating pipe insulation (loading) S.B.M. Pressure test for leakage, and put back to loading operation, Also Mooring rope Installation to the SBM. Deck Foreman onboard barge Major offshore contraction. , SBM installation at ELF field in Cameroon Africa. S.B.M crude oil flushing. Floating pipe insulation (loading) S.B.M. Pressure test for leakage, and put back to loading operation, Also Mooring rope Installation to the SBM.
-
-
-
Chevron
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Deck Foreman Onboard Barge
-
Feb 1997 - May 1997
6” Pipe Line from clock star and well heard to Okaan Platform, and Pressure Test 6” Pipe Line from clock star and well heard to Okaan Platform, and Pressure Test
-
-
-
Texaco
-
Oil and Gas
-
700 & Above Employee
-
Onboard Barge Major
-
1997 - May 1997
Esongo Platform Texaco Oilfield Platforms upgrade and commissioning Crude oil flushing Installation of Turbine pump Pipe pressure test for leakage. Esongo Platform Texaco Oilfield Platforms upgrade and commissioning Crude oil flushing Installation of Turbine pump Pipe pressure test for leakage.
-
-
-
-
Onboard Barge Major
-
1996 - Oct 1996
Platform refurbishment and pipeline commission Crude oil and gas flushing Changing of manifold gasket and valves Platform refurbishment and pipeline commission Crude oil and gas flushing Changing of manifold gasket and valves
-
-
-
Shipshore Consultancy Services OPC Private Limited
-
India
-
Maritime
-
On-Board TM GHZI (Tanker)
-
Jul 1995 - Feb 1996
Engine room oilier /Ass-Pump man, sharing duty with a second engineer at anchorage; assisting in carrying out repairs on machinery and also the operation of cargo pump and boiler. Loading and offloading of PMS, AGO, CRUDE OIL. Engine room oilier /Ass-Pump man, sharing duty with a second engineer at anchorage; assisting in carrying out repairs on machinery and also the operation of cargo pump and boiler. Loading and offloading of PMS, AGO, CRUDE OIL.
-
-
Education
-
Lowestoft College (East Coast College; Centre for Maritime and Offshore Technology, UK)
Engineering -
Solent University
Engineering -
Government Technical College Owo, Ondo State (Federal Craft)
High School Diploma, Engineering