OSMAN ŞENKUL

Directeur Général Adjoint at CGE Evaluation
  • Claim this Profile
Contact Information
Location
TR
Languages
  • Fransızca Professional working proficiency
  • İngilizce Limited working proficiency
  • Türkçe Native or bilingual proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • GESTION DE PROJET
    Renault-Nissan Consulting France
  • AUTOMATION CHIMIQUE
    Groupe Renault
  • Administrateur d'équipe Coach
    Addler Info Solutions
  • Applications robotiques ABB, FANUC, KUKA, DURR, MOTOMAN
    Groupe Renault
  • GESTION DE L'ÉNERGIE
    Groupe Renault
  • GESTION DE PROJET
    Groupe Renault
  • GESTION DES RESSOURCES HUMAINES
    Boğaziçi Üniversitesi
  • MAINTENANCE PROFESSIONNEL
    Groupe Renault
  • SANTÉ SÉCURITÉ ET ERGONOMIE
    Groupe Renault
  • SYSTEME INDUSTRIELLE AUTOMATİON
    Groupe Renault
  • TECHNIQUES DE PRODUCTION
    Groupe Renault
  • TECHNIQUES DE RESOLUTION
    Renault-Nissan Consulting France

Experience

    • Türkiye
    • Business Consulting and Services
    • 1 - 100 Employee
    • Directeur Général Adjoint
      • Apr 2020 - Present
    • Türkiye
    • Holding Companies
    • 100 - 200 Employee
    • Directeur Général chez Koyuncu / TÜVTÜRK
      • Jun 2017 - Present

      Directeur Général chez Koyuncu / TÜVTÜRK Stations d'inspection des véhicules Directeur Général chez Koyuncu / TÜVTÜRK Stations d'inspection des véhicules

    • Movies, Videos, and Sound
    • 100 - 200 Employee
    • Senior Operation Executive(Productivity Project Lean Management Digital Transformation TPM)
      • Oct 2016 - Present
    • France
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Maintenace Manager
      • Jan 2014 - Oct 2016

      Manage maintenance teams. The work of robots and automation machines, repair, maintenance, improvement activities (preventive, proactive, autonomous, predictive, dynamic). Planning and monitoring revisions. Process improvements. (Reliability, quality, cost, time). Investments related to the process. TQM, 5s, Kaizen, TPM, postal standardization, lean production work. Safety, the environment and energy management. The commissioning of automation projects and plants. Quality problems. Participation of the transversal study group. Show less

    • Maintenance warehouse manager (Purchasing and Logistics)
      • Jan 2011 - Jan 2014

      Logistics and tracking of the purchasing process. Calculation of costs. Activities Kaizen, 5s FIFO JIT. Spare parts for market studies for new projects. Efforts to reduce costs Stock

    • India
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Energy Manager
      • Jan 2006 - Jan 2011

      Energy saving . Participation in the working group organized by the energy group. Dissemination of actions to reduce energy consumption of the cost and implementation to the unit. Case studies: - Heat recovery - Engine speed controls - Temperature-humidity regulation setting - Optimization of lighting - Studies of optimization of hot water - Heat leaks - Air leaks - Savings of gas -Energy efficiency studies. Energy saving . Participation in the working group organized by the energy group. Dissemination of actions to reduce energy consumption of the cost and implementation to the unit. Case studies: - Heat recovery - Engine speed controls - Temperature-humidity regulation setting - Optimization of lighting - Studies of optimization of hot water - Heat leaks - Air leaks - Savings of gas -Energy efficiency studies.

    • Technical Team Coordinator
      • Jan 2002 - Jan 2006

      Participation in the project. Process improvements. (Reliability, quality, cost, time) PreUS investment process and application. Group participation in process improvement work. Preventive, proactive, autonomous and predictive. TQM, 5s, TPM, Kaizen, Studies Studies Budget analysis. Ergonomics Track problems and manufacturing solutions. Manufacturing production track.

    • Maintenance Team Leader
      • Jul 1998 - Jan 2002

      Managing the maintenance team.

    • Türkiye
    • Professional Training and Coaching
    • 100 - 200 Employee
    • Technical Trainer
      • Sep 1995 - Jul 1998

      Teaching of training in industrial maintenance. Teaching of training in industrial maintenance.

    • Head of Electrical Maintenance
      • Jan 1990 - Jan 1991

      Holiday Village Holiday Village

Education

  • Gazi Üniversitesi
    Bac +4, Électrique
    1991 - 1995
  • Université Paris-Sud
    Formation, Modélisation et Simulation.
    1998 - 2000
  • Dokuz Eylül Üniversitesi
    Bachelor's degree, Electrique-Electronique, automation
    1989 - 1991

Community

You need to have a working account to view this content. Click here to join now